IR 05000335/2012001
| ML13063A595 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/04/2013 |
| From: | Mccree V Region 2 Administrator |
| To: | Nazar M Florida Power & Light Co |
| References | |
| IR-12-001 | |
| Download: ML13063A595 (7) | |
Text
March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST. LUCIE NUCLEAR PLANT UNIT 1 AND UNIT 2 (REPORT 05000335/2012001 AND 05000389/2012001)
Dear Mr. Nazar:
On February 13, 2013, the NRC completed its end-of-cycle performance review of St. Lucie Nuclear Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, St. Lucie Unit 1 and Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
While performance at St. Lucie Unit 2 remained in the Licensee Response Column for the entire assessment period, the NRC determined that performance at St. Lucie Unit 1 was within the Degraded Cornerstone Column of the NRCs ROP Action Matrix during the first three quarters of the assessment period because of two White PIs in the Initiating Events cornerstone (Unplanned Scrams per 7000 Critical Hours and Unplanned Scrams with Complications). The two White PIs were identified in the first quarter of 2012. On October 12, 2012, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95002, and confirmed that you had adequately addressed the two White indicators. The inspection was documented in Inspection Report 05000335/2012009 dated November 16, 2012 (ML12321A239). Following completion of the inspection, the NRCs review of St. Lucie Unit 1 PIs identified that the PI for Unplanned Scrams with Complications had returned to the Green threshold at the start of the third quarter of 2012, while the PI for Unplanned Scrams per 7000 Critical Hours PI remained in the White performance band. As a result, NRC determined the performance at St. Lucie Unit 1 transitioned from the Degraded Cornerstone to the Regulatory Response Column of the ROP Action Matrix on November 16, 2012. The NRCs review of St. Lucie Unit 1 PIs in the fourth quarter of 2012 identified that the Unplanned Scrams per 7000 Critical Hours PI had returned to the Green performance band. Therefore, the NRC determined the performance of St. Lucie Unit 1 returned to the Licensee Response Column of the ROP Action Matrix as of November 16, 2012.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting one non-ROP inspection; Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Shane Sandal at (404) 997-4513 with any questions you may have regarding this letter.
Sincerely,
/RA/
Victor M. McCree Regional Administrator
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
St. Lucie Nuclear Plant Inspection/
Activity Plan (03/01/2013 - 06/30/2014)
cc w/encl: (See page 3)
_________________________
X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:ORA RII:ORA
SIGNATURE MJR /RA/
SRS /RA/
RPC /RA/
LDW /RA/
VMM /RA/
NAME MRiches SSandal RCroteau LWert VMcCree
DATE 02/22/2013 02/22/2013 02/25/2013 03/01/2013 03/04/2013
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:
Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution
Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution
Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution
Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Daniel D. DeBoer Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution
Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution
Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution
J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution
Michael Baughman Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution
James Petro Managing Attorney-Nuclear Florida Power & Light Company Electronic Mail Distribution
Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution Letter to Mano Nazar from Victor M. McCree dated March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST. LUCIE NUCLEAR PLANT UNIT 1 AND UNIT 2 (REPORT 05000335/2012001 AND 05000389/2012001)
Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Saint Lucie Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:31:12 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
TFPI
- TRIENNIAL FIRE PROTECTION INSP 1, 2 03/11/2013 03/15/2013 IP 7111105T Fire Protection [Triennial]
1, 2 03/25/2013 03/29/2013 IP 7111105T Fire Protection [Triennial]
HS
- TRIENNIAL HEAT SINK PERFORMANCE 1, 2 07/08/2013 07/12/2013 IP 7111107T Heat Sink Performance
OL REQ
- REQUAL INSPECTION 1, 2 08/19/2013 08/23/2013 IP 7111111B Licensed Operator Requalification Program
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 09/16/2013 09/18/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
- RP OCCUPATIONAL BASELINE 1, 2 09/16/2013 09/20/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/16/2013 09/20/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/16/2013 09/20/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/16/2013 09/20/2013 IP 71124.04 Occupational Dose Assessment 1, 2 09/16/2013 09/20/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/16/2013 09/20/2013 IP 71151 Performance Indicator Verification
- RP OCCUPATIONAL BASELINE WEEK2 1, 2 09/30/2013 10/04/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/30/2013 10/04/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/30/2013 10/04/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/30/2013 10/04/2013 IP 71124.04 Occupational Dose Assessment 1, 2 09/30/2013 10/04/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/30/2013 10/04/2013 IP 71151 Performance Indicator Verification
- UNIT 1 INSERVICE INSPECTION
10/07/2013 10/11/2013 IP 7111108P Inservice Inspection Activities - PWR
SGISI
- UNIT 1 SG INSERVICE INSPECTION
10/14/2013 10/18/2013 IP 7111108P Inservice Inspection Activities - PWR
- EP EXERCISE 1, 2 02/17/2014 02/21/2014 IP 7111401 Exercise Evaluation 1, 2 02/17/2014 02/21/2014 IP 71151 Performance Indicator Verification
- RP PUBLIC RADIATION BASELINE 1, 2 01/27/2014 01/31/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/27/2014 01/31/2014 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/27/2014 01/31/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Saint Lucie Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:31:12 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- UNIT 2 IN-SERVICE INSPECTION
03/10/2014 03/14/2014 IP 7111108P Inservice Inspection Activities - PWR
SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
03/17/2014 03/21/2014 IP 7111108P Inservice Inspection Activities - PWR
- RADIOLOGICAL HAZARDS AND TRANSPORTATION 1, 2 03/24/2014 03/28/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/24/2014 03/28/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/24/2014 03/28/2014 IP 71151 Performance Indicator Verification Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure