Summary of Public Meeting to Discuss NRC Oversight Activities, and Clinton Power Station 2012 End-Of-Cycle Plant Performance Assessment
ML13211A060
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/29/2013
From: Christine Lipa
NRC/RGN-III/DRP/B1
To:
References
Download: ML13211A060 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 29, 2013 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Clinton Power Station

SUBJECT:

SUMMARY

OF THE JULY 2, 2013, PUBLIC MEETING TO DISCUSS NRC OVERSIGHT ACTIVITIES, AND CLINTON POWER STATION 2012 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 2, 2013, a public meeting was held at the Vespasian Warner Public Library, 301 North Quincy Street in Clinton, IL, between the U.S. Nuclear Regulatory Commission (NRC) and the Clinton Power Station management and staff. The purpose of the public meeting was to provide an opportunity for the public to hear about NRC oversight activities and the Clinton Power Station performance for the period of January 1, 2012, through December 31, 2012. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13162A110 and ML13162A292 respectively. A list of the public meeting attendees who signed the attendance sheet is attached.

The NRCs presentation at the public meeting led off with an overview of the NRCs Mission and Performance Goals, the Reactor Oversight Process (ROP), and national ROP results. The NRC also provided discussions related to the NRCs assessment of the Clinton Power Station performance, which was documented in the March 4, 2013, End-of-Cycle Assessment Letter (reference ADAMS Accession Number ML13060A108.) Slides used to describe the NRC's ROP process and Clinton Power Station 2012 performance can be found in ADAMS under ML13184A315.

/RA/

Christine Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

As stated cc w/encl: Distribution via ListServTM

Enclosure NRC REGION III July 2, 2013 PUBLIC MEETING ATTENDEES Nuclear Regulatory Commission C. Lipa B. Kemker W. Schaup D. Lords G. Stauffer Illinois Emergency Management Agency S. Mischke Exelon Employees K. Baker B. Harris K. Lopykinski T. Stoner K. Taber Members of the Public None

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 29, 2013 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Clinton Power Station

SUBJECT:

SUMMARY

OF THE JULY 2, 2013, PUBLIC MEETING TO DISCUSS NRC OVERSIGHT ACTIVITIES, AND CLINTON POWER STATION 2012 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 2, 2013, a public meeting was held at the Vespasian Warner Public Library, 301 North Quincy Street in Clinton, IL, between the U.S. Nuclear Regulatory Commission (NRC) and the Clinton Power Station management and staff. The purpose of the public meeting was to provide an opportunity for the public to hear about NRC oversight activities and the Clinton Power Station performance for the period of January 1, 2012, through December 31, 2012. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13162A110 and ML13162A292 respectively. A list of the public meeting attendees who signed the attendance sheet is attached.

The NRCs presentation at the public meeting led off with an overview of the NRCs Mission and Performance Goals, the Reactor Oversight Process (ROP), and national ROP results. The NRC also provided discussions related to the NRCs assessment of the Clinton Power Station performance, which was documented in the March 4, 2013, End-of-Cycle Assessment Letter (reference ADAMS Accession Number ML13060A108.) Slides used to describe the NRC's ROP process and Clinton Power Station 2012 performance can be found in ADAMS under ML13184A315.

/RA/

Christine Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

As stated cc w/encl: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Clinton EOC Mtg Summary CY 2012.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE RIII E RIII N RIII RIII NAME RElliott:te/rj CLipa DATE 0725/13 0729/13 OFFICIAL RECORD COPY

Letter to Exelon Generation Company from C. Lipa dated July 29, 2013

SUBJECT:

SUMMARY

OF THE JULY 2, 2013, PUBLIC MEETING TO DISCUSS NRC OVERSIGHT ACTIVITIES, AND CLINTON POWER STATION 2012 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov