IR 05000321/2013403
| ML13347A901 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/13/2013 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Madison D Southern Nuclear Operating Co |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR-13-403 | |
| Download: ML13347A901 (4) | |
Text
December 13, 2013
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000321/2013403 AND 05000366/2013403
Dear Mr. Madison:
On December 5, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Hatch Nuclear Plant Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. G. Johnson and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos: 50-321 and 50-366 License Nos: DPR-57 and NPF-5
Enclosure:
Inspection Report 05000321, 366/2013403 w/Attachment: Supplementary Information (OUO)
cc: Distribution via Listserv
ML13347A901 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR6 RII:DRS/PSB2
SIGNATURE JDG1 KXD ICH JOB2 FJE BBD
NAME J.D. Graham K. Davis I. Hall J. Brown F. Ehrhardt B. Desai
DATE 12/ 10 /2013 12/ 10 /2013 12/ 10 /2013 12/ 11 /2013 12/ 11 /2013 12/ 12 /2013
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO