ROP-14 2013 Peach Bottom Atomic Power Station Annual Assessment Letter, Report 05000277/2013001 and 05000278/2013001, and Inspection Plan
ML14058A409
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/2014
From: Fred Bower
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
BOWER, FL
References
IR-13-001 IR-13-001
Download: ML14058A409 (6)


Text

March 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013001 AND 05000278/2013001)

Dear Mr. Pacilio:

On February 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station, Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Peach Bottom Atomic Power Station, Units 2 and 3, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Peach Bottom Atomic Power Station, Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised beginning in calendar year (CY) 2014. New cross-cutting aspects identified in CY 2014 will be coded under the latest revision to IMC 0310. Cross-cutting aspects identified in the last six months of 2013 using the previous terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310. The revised cross-cutting aspects will be evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305 starting with the CY 2014 mid-cycle assessment review.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 49001, EC/FAC Power Uprate - Inspection of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Program, IP 71003, Unit 3, Post-Approval Site Inspection for License Renewal, and IP 71004, Power Uprate. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects

Docket Nos.: 50-277, 50-278 License Nos.: DPR-44, DPR-56

Enclosure: Inspection Plan

cc w/encl: Distribution via ListServ

ML14058A409 SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME mmt SHansell/ GSB for SBarber/ GSB FBower/ FLB

DATE 02/26/14 02.26/14 02/26/14

Page 1 of 3 02/13/2014 08:59:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Peach Bottom Inspection / Activity Plan 01/10/2014 - 06/30/2015 EP

- EP ANNUAL REPORT

2, 3 IP Drill Evaluation 7111406 01/01/2014 12/31/2014 UPRATE

- 71004 - POWER UPRATE

2, 3 IP Power Uprate 71004 01/01/2014 12/31/2014 71124

- HP

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/13/2014 01/17/2014 2, 3 IP Occupational ALARA Planning and Controls 71124.02 01/13/2014 01/17/2014 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/13/2014 01/17/2014 2, 3 IP Occupational Dose Assessment 71124.04 01/13/2014 01/17/2014 71003

- U3 LR COMMITMENTS PHASE 2

3 IP Post-Approval Site Inspection for License Renewal 71003 01/21/2014 01/24/2014 CDBI

- CDBI

2, 3 IP Component Design Bases Inspection 7111121 03/03/2014 03/07/2014 2, 3 IP Component Design Bases Inspection 7111121 03/17/2014 03/21/2014 2, 3 IP Component Design Bases Inspection 7111121 03/31/2014 04/04/2014 EP EXER

- EP EXERCISE INSPECTION

2, 3 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 04/07/2014 04/11/2014 71124

- HP

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/19/2014 05/23/2014 2, 3 IP Occupational ALARA Planning and Controls 71124.02 05/19/2014 05/23/2014 2, 3 IP Radiation Monitoring Instrumentation 71124.05 05/19/2014 05/23/2014 TI-182

- DEGRAD UNDERGROUND PIPING - PHASE 2

2, 3 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/09/2014 06/13/2014 2561

- SAFSTOR

1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 07/28/2014 07/30/2014

IP Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 37801 07/28/2014 07/30/2014

IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 40801 07/28/2014 07/30/2014

IP Maintenance And Surveillance At Permanenly Shutdown Reactors 62801 07/28/2014 07/30/2014

IP Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 71801 07/28/2014 07/30/2014

IP Occupational Radiation Exposure 83750 07/28/2014 07/30/2014

IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring 84750 07/28/2014 07/30/2014

IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 86750 07/28/2014 07/30/2014 71124

- RETS

2, 3 IP Radiation Monitoring Instrumentation 71124.05 09/08/2014 09/12/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 02/13/2014 08:59:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Peach Bottom Inspection / Activity Plan 01/10/2014 - 06/30/2015 71124

- RETS

2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 09/08/2014 09/12/2014 71124

- HP

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/27/2014 10/31/2014

IP Occupational ALARA Planning and Controls 71124.02 10/27/2014 10/31/2014 7111108G

- U2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - BWR 7111108G 10/27/2014 10/31/2014 IP49001

- EC/FAC POWER UPRATE

2 IP Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 49001 11/03/2014 11/07/2014 3/23EXAM

- PEACH BOTTOM INITIAL EXAM

2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM U01911 02/23/2015 02/27/2015

FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM U01911 03/23/2015 04/03/2015 EP

- EP ANNUAL REPORT

2, 3 IP Drill Evaluation 7111406 01/01/2015 12/31/2015 71124

- HP

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/23/2015 02/27/2015 2, 3 IP Occupational ALARA Planning and Controls 71124.02 02/23/2015 02/27/2015 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/23/2015 02/27/2015 PI&R

- PI&R - BIENNIAL

2, 3 IP Problem Identification and Resolution 71152B 03/02/2015 03/06/2015 2, 3 IP Problem Identification and Resolution 71152B 03/16/2015 03/20/2015 TRI FI

- TRIENNIAL FIRE PROTECTION INSPECTION

2, 3 IP Fire Protection [Triennial]

7111105T 03/16/2015 03/20/2015 2, 3 IP Fire Protection [Triennial]

7111105T 03/30/2015 04/03/2015 7111111B

- PB REQUAL INSP W/ P/F RESULTS

2, 3 IP Licensed Operator Requalification Program 7111111B 03/16/2015 03/20/2015 71124.07

- REMP

2, 3 IP Radiological Environmental Monitoring Program 71124.07 06/22/2015 06/26/2015 2561

- SAFSTOR

1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 06/27/2015 06/30/2015

IP Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 37801 06/27/2015 06/30/2015

IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 40801 06/27/2015 06/30/2015

IP Maintenance And Surveillance At Permanenly Shutdown Reactors 62801 06/27/2015 06/30/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 02/13/2014 08:59:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Peach Bottom Inspection / Activity Plan 01/10/2014 - 06/30/2015 2561

- SAFSTOR

1 IP Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 71801 06/27/2015 06/30/2015

IP Occupational Radiation Exposure 83750 06/27/2015 06/30/2015

IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring 84750 06/27/2015 06/30/2015

IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 86750 06/27/2015 06/30/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.