ML14364A385
| ML14364A385 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/24/2014 |
| From: | Mcneil D NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Shared Package | |
| ML14344A990 | List: |
| References | |
| ES-401-3 50-456/OL-14, 50-457/OL-14 | |
| Download: ML14364A385 (1) | |
Text
ES-401 Generic Knowledge and Abilities Outline (Tier 3)
Form ES-401-3 Facility Name:Braidwood Date of Exam:11/10/2014 IR IR 2.1. 27 Knowledge of system purpose and/or function.
3.9 1
2.1. 13 Knowledge of facility requirements for controlling vital/controlled access.
2.5 1
2.1. 36 Knowledge of procedures and limitations involved in core alterations.
4.1 1
2.1. 43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.
4.3 1
2.1.
2.1.
Subtotal 2
2 2.2. 18 Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc.
2.6 1
2.2. 40 Ability to apply Technical Specifications for a system.
3.4 1
2.2. 12 Knowledge of surveillance procedures.
3.7 1
2.2. 05 Knowledge of the process for making design or operating changes to the facility.
3.2 1
2.2.
2.2.
Subtotal 3
1 2.3. 07 Ability to comply with radiation work permit requirements during normal or abnormal conditions.
3.5 1
2.3. 14 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
3.4 1
2.3. 05 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
2.9 1
2.3. 11 Ability to control radiation releases.
4.3 1
2.3.
2.3.
Subtotal 2
2 2.4. 17 Knowledge of EOP terms and definitions.
3.9 1
2.4. 29 Knowledge of the emergency plan.
3.1 1
2.4. 13 Knowledge of crew roles and responsibilities during EOP usage.
4.0 1
2.4. 18 Knowledge of the specific bases for EOPs.
4.0 1
2.4. 16 Knowledge of EOP implementation hierarchy and coordination with other support procedures or guidelines such as, operating procedures, abnormal operating procedures, and severe accident management guidelines 4.4 1
2.4.
Subtotal 3
2 10 7
ES-401, Page 26 of 33 RO SRO-Only Tier 3 Point Total
- 3.
Radiation Control
- 4.
Emergency Procedures /
Plan
- 2.
Equipment Control Category Topic
- 1.
Conduct of Operations K/A #