ML16257A098

From kanterella
Revision as of 20:20, 9 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
09 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.6
ML16257A098
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A098 (1)


Text

WSES-FSAR-UNIT-3 13.6-1 Revision 308 (11/14)

(LBDCR 13-015, R308) 13.6 PLANT SECURITY The program for ensuring the physical security of the Waterford 3 station has been reviewed by the NRC and found acceptable. The fully implemented security plan provides the protection needed to meet the general performance requirements of 10 CFR 73.55(a) and the objectives of the specific requirements of 10 CFR 73.55, paragraphs (b) through (r), without impairing the ability to operate the plant safely. The approved plant security program, titled Waterford 3, Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI, is addressed in the facility operating license. The approved security plan documents and the NRC Security Plan Evaluation Report have been withheld from public disclosure pursuant to 10 CFR 2.790(d).

(LBDCR 13-015, R308)