ML16341G679

From kanterella
Revision as of 17:25, 9 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-275/92-21 & 50-323/92-21.No Violations or Deviations Noted
ML16341G679
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/18/1992
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G680 List:
References
NUDOCS 9209040207
Download: ML16341G679 (6)


See also: IR 05000275/1992021

Text

'+n

+

+a*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CALIFORNIA84596-5368

ggG 18

1992

Docket Nos. 50-275

and 50-323

Pacific Gas and Electric Company

Nuclear Power'Generation,

B14A

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco,

California 94177

Attention:

Mr. Gregory M. Rueger,

Senior Vice President

and General

Manager,

Nuclear Power Generation

Business

Unit

SUBJECT:

NRC INSPECTION OF DIABLO CANYON UNITS 1

AND 2

(REPORT NO. 50-275,

50-323/92-21)

This refers to the routine announced

inspection

conducted

by Mr. D. Acker of

this, office on June

29 through July 2,

and our review of procedures,

in the

Region V office, from July 20 through July 29,

1992.

This inspection

examined

certafn of your activities authorized

by NRC license

numbers

DPR-80 and

DPR-

82.

A telephone

discussion of the findings was held with members of your

staff at the conclusion of the inspection

on July 29,

1992.

Areas examined during this inspection

are described

fn the enclosed

inspection

report.

MitMn these

areas,

the inspection consisted of selective

examinations, of procedures

and ~epresentatfve

records,

interviews with

personnel,

and observations

by the inspector.

No violations or deviations of NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~ /k'/

Lewis Miller, Chief

Reactor Safety Branch

9209040207

920818

PDR

ADOCN 05000275

8

PDR

0

Enclosure:

Inspection

Report Nos. 50-275/92-21

and 50-323/92-21

cc w/enclosure:

J. A. Sexton,

PGKE

C. J. Marner, Esq.,

PG&E

J.

D. Townsend,

Vice President/Plant

Manager,

PGKE

D. A. Taggart, Director, guality Support,

PGKE

B. Thomas,

Hews Services,

POKE

T. L. Grebel, Regulatory Compliance Supervisor,-PGKE

State of California

R. Hendrix, County Administrator

Sandra Silver (Report Dnly)

bcc w/enclosure:

P.

Johnson

.

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

Docket File

bcc w/o enclosure:

M. Smith

J. Zollicoffev

J.

Bianchi

/

D. Acker,

~~,.

M. Roya

k

< //g. /92 pi'

//i/92

gUEST

COPY] ~CQUPST

COPY]

/YES /

NO

++YES

/

NO

]

P. Johnson

g /i~/92

+s

js'o'"]

[REQUEST COPY]

[REQUEST COPY]

[REQUEST COPY]

[YES /

NO

]

[YES /

NO

]

[YES /

NO

]

[SEND TO,PDR

[YES /

NO