Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Report 05000334/2016006 and 05000412/2016006) with Report 22
ML17058A277
Person / Time
Site: Beaver Valley
Issue date: 03/01/2017
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Richey M
FirstEnergy Nuclear Operating Co
Kennedy S
References
IR 2016006
Download: ML17058A277 (6)


Text

March 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2016006 AND 05000412/2016006)

Dear Mr. Richey:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Unit Nos. 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Beaver Valley Power Station, Unit Nos. 1 and 2, during the most recent quarter was within the Licensee Response Column because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Unit Nos. 1 and 2.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants and TI-192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

Docket Nos 50-334 and 50-412 License Nos DPR-66 and NPF-73

Enclosure:

Beaver Valley Power Station Inspection/Activity Plan

ML17058A277

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME MHenrion/MH SKennedy/SK

DATE 2/24/17 2/27/17

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 1 of 3 01/31/2017 08:34:43 71124

- RAD SAFETY INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/06/2017 03/10/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/06/2017 03/10/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/06/2017 03/10/2017 1, 2 IP Occupational Dose Assessment 71124.04 03/06/2017 03/10/2017 71124

- HP INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/01/2017 05/05/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/01/2017 05/05/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/01/2017 05/05/2017 1, 2 IP Occupational Dose Assessment 71124.04 05/01/2017 05/05/2017 7111108P

- U2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 05/01/2017 05/12/2017 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 06/19/2017 06/23/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/19/2017 06/23/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/19/2017 06/23/2017 1, 2 IP Performance Indicator Verification 71151 06/19/2017 06/23/2017 71152B

- PI&R BIENNIAL

1, 2 IP Problem Identification and Resolution 71152B 06/05/2017 06/09/2017 1, 2 IP Problem Identification and Resolution 71152B 06/19/2017 06/23/2017 10/8EXAM

- BEAVER VALLEY 2 INITIAL EXAM

2 FY18-BV2 INITIAL OPERATOR LICENSING EXAM U01938 10/09/2017 10/13/2017

FY18-BV2 INITIAL OPERATOR LICENSING EXAM U01938 11/06/2017 11/17/2017 7111111B

- BV2 REQUAL INSP WITH P/F RESULTS

2 IP Licensed Operator Requalification Program - Annual Review 7111111A 08/14/2017 08/18/2017

IP Licensed Operator Requalification Program 7111111B 08/14/2017 08/18/2017 71124

- HP INSPECTION

1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/07/2017 08/11/2017 1, 2 IP Occupational Dose Assessment 71124.04 08/07/2017 08/11/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/07/2017 08/11/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 08/07/2017 08/11/2017 ISFSI

- ISFSI LOADING CAMPAIGN INSPECTION

1, 2 IP Operation Of An ISFSI 60855 09/25/2017 09/29/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 2 of 3 01/31/2017 08:34:43 ISFSI

- ISFSI LOADING CAMPAIGN INSPECTION

1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/25/2017 09/29/2017 71124

- HP INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/16/2017 10/20/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/16/2017 10/20/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/16/2017 10/20/2017

IP Occupational Exposure Control Effectiveness 71151-OR01 10/16/2017 10/20/2017

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/16/2017 10/20/2017 7111121M

- DESIGN BASES ASSURANCE INSPECTION

1, 2 IP Component Design Bases Inspection (Teams)

7111121M 10/30/2017 11/03/2017 1, 2 IP Component Design Bases Inspection (Teams)

7111121M 11/13/2017 11/17/2017 71124

- RAD SAFETY INSP

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/22/2018 01/26/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 01/22/2018 01/26/2018 7111111B

- BV1 REQUAL INSP W/ P/S RESULTS

1 IP Licensed Operator Requalification Program - Annual Review 7111111A 04/09/2018 04/13/2018

IP Licensed Operator Requalification Program 7111111B 04/09/2018 04/13/2018 8/13EXAM

- BEAVER VALLEY 1 INITIAL EXAM

1 FY18-BEAVER VALLEY 1 INITIAL OPERATOR LICENSING EXAM U01961 07/16/2018 07/20/2018

FY18-BEAVER VALLEY 1 INITIAL OPERATOR LICENSING EXAM U01961 08/13/2018 08/24/2018 71124

- RAD SAFETY INSP

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/23/2018 04/27/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/23/2018 04/27/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/23/2018 04/27/2018 1, 2 IP Occupational Dose Assessment 71124.04 04/23/2018 04/27/2018 U1 ISI

- UNIT 1 INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/23/2018 05/04/2018 EP

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation 7111401 06/11/2018 06/15/2018 71124.06

- REMP

1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/09/2018 07/13/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 07/09/2018 07/13/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 3 of 3 01/31/2017 08:34:43 7111105X

- TRIENNIAL FIRE PROTECTION

1, 2 IP Fire Protection - NFPA 805 (Triennial)

7111105X 07/23/2018 07/27/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)

7111105X 08/06/2018 08/10/2018 U2 ISI

- UNIT 2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 10/08/2018 10/19/2018 71124

- RAD INSTRUMENTATION

1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/29/2018 11/02/2018 71124.08

- RADWASTE

1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/05/2018 11/09/2018 71124

- RAD SAFETY INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/10/2018 12/14/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/10/2018 12/14/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/10/2018 12/14/2018 1, 2 IP Occupational Dose Assessment 71124.04 12/10/2018 12/14/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/10/2018 12/14/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.