IR 05000269/2017403

From kanterella
Revision as of 11:23, 9 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000269/2017403, 05000270/2017403 and 05000287/2017403
ML17067A269
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/01/2017
From: James Shehee
NRC/RGN-II/DRS/PSB2
To: Rasmey Robinson
Duke Energy Corp
References
IR 2017403
Download: ML17067A269 (4)


Text

March 1, 2017

SUBJECT:

OCONEE NUCLEAR STATION - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000269/2017403, 05000270/2017403, AND 05000287/2017403

Dear Mr. Robinson:

On February 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Oconee Nuclear Station Units 1, 2 and 3 and, the NRC inspector discussed the results of this inspection with Mrs. C. Dunton and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/

reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

James C. Shehee, Acting Chief Plant Support Branch 2 Division of Reactor Safety

Docket Nos. 50-269, 50-270 and 50-287 License Nos. DPR-38, DPR-47 and DPR-55

Enclosure:

NRC IR 05000269/2017403, 05000270/2017403 and 05000287/2017403 w/Attachment: Supplemental Info (OUO)

cc: (See page 3) cc:

Mark McNeely Duke Energy Corporation 526 S. Church Street Charlotte, NC 28202-1802

________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE RLP5 FJE JCS3

NAME R. PATTERSON F. EHRHARDT J. SHEHEEI

DATE 2/22/2017 2/23/2017 3/1/2017

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO