ML17083A898
| ML17083A898 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/11/1981 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML17083A899 | List: |
| References | |
| NUDOCS 8106080509 | |
| Download: ML17083A898 (4) | |
See also: IR 05000275/1981008
Text
I1
a
. i'~~ "<<uC
~Gi
Wp
+>>*+~
Docket Nos.
50-275
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94595
May 11,
1981
Pacific
Gas
and Electric Company
P. 0.
Bo:c 7442
San Francisco,
California 94106
JUN 05 >981'
Attention:
Hr. Philip A. Crane, Jr.
Assistant
General
Counsel
Gentlemen:
Subject:
hRC Inspection of Diablo Canyon Units
1 & 2
This refers to the routine monthly inspection conducted
by Hr;-H;-Ba'gagli.o-
and Hr. H. Hendonca of this office on April 1-30,
1981, of activities
authorized
by NRC Construction Permit Nos.
CPPR-39
and CPPR-69,
and to
the discussion of our findings held by Hr. Bagaglio
and Hr. Hendonca
with Hr. Thornberry and other metnbers of your st:aff at the concl'usion
of
t:he inspect:ion.
Areas
examined during this inspection are described
in the enclosed
inspection report:.
4'ithin these" ax'eas,
the inspection consisted of
selective
examinations oi procedures
and representative
records, inter-
views
1 it:h personnel,
and observations
by the inspect:ors.
No items of noncompliance with NRC reruirements
were identified within
the scope
of. thi,s inspection.
In accordance
I ith Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this let:ter and the
enclosed
inspect:ion report vill be placed in the NRC's Public Document
Room. If I:his report contains
any information that you believe to be
proprietary, it is necessary
t:hat you submit
a 1tritten application to
this office, vit:hin 20 days of the date of this letter, recuesting
that
such information be withheld from public disclosure.
The application
must include
a full stat:cment of t:he reasons
why i.t is claimed that
t:he
information is proprietary.
The application should
be prepared
so that
any proprietary information identified is contained in an enclosure
to
t:he application,
since
t:he applicat:ion without
t:he enclosure will also
be placed in the Public Document:
Room. If we do not hear from you in
t:his x'egard wit:hin the specified period,
the report vill be placed in
the Public Document
Room.
8 xoooso O'Dg
1I
I
II "
'I
)>
/
Ir
Pacific
Gas
and Hlectric Company
-.2-
May 11,
1981
Should you have any ruestions
concerning this inspection,
ve t,"ill be
lad to discuss
them c'ith you.
Sincerely,
J, L, Crews, Acting Director
Division of Resident
Reactor
Projects
and Engineering Inspection
Enclosure:
IH Inspection Report
Nos. 50-275/31-08
50-323/81-08
cc'4'/0
J. 0.
J.
D.
[. A.
R.
C.
enclosure:
Schuyler,
PG6Z
Shiffer,
PGGZ
Raymond,
PGGE
Thornberry (Diablo Canyon)