ML17083A898

From kanterella
Revision as of 11:06, 9 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/81-08 & 50-323/81-08 on 810401-30.No Noncompliance Noted
ML17083A898
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/11/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083A899 List:
References
NUDOCS 8106080509
Download: ML17083A898 (4)


See also: IR 05000275/1981008

Text

I1

a

. i'~~ "<<uC

~Gi

Wp

+>>*+~

Docket Nos.

50-275

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94595

May 11,

1981

Pacific

Gas

and Electric Company

P. 0.

Bo:c 7442

San Francisco,

California 94106

JUN 05 >981'

Attention:

Hr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

hRC Inspection of Diablo Canyon Units

1 & 2

This refers to the routine monthly inspection conducted

by Hr;-H;-Ba'gagli.o-

and Hr. H. Hendonca of this office on April 1-30,

1981, of activities

authorized

by NRC Construction Permit Nos.

CPPR-39

and CPPR-69,

and to

the discussion of our findings held by Hr. Bagaglio

and Hr. Hendonca

with Hr. Thornberry and other metnbers of your st:aff at the concl'usion

of

t:he inspect:ion.

Areas

examined during this inspection are described

in the enclosed

inspection report:.

4'ithin these" ax'eas,

the inspection consisted of

selective

examinations oi procedures

and representative

records, inter-

views

1 it:h personnel,

and observations

by the inspect:ors.

No items of noncompliance with NRC reruirements

were identified within

the scope

of. thi,s inspection.

In accordance

I ith Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this let:ter and the

enclosed

inspect:ion report vill be placed in the NRC's Public Document

Room. If I:his report contains

any information that you believe to be

proprietary, it is necessary

t:hat you submit

a 1tritten application to

this office, vit:hin 20 days of the date of this letter, recuesting

that

such information be withheld from public disclosure.

The application

must include

a full stat:cment of t:he reasons

why i.t is claimed that

t:he

information is proprietary.

The application should

be prepared

so that

any proprietary information identified is contained in an enclosure

to

t:he application,

since

t:he applicat:ion without

t:he enclosure will also

be placed in the Public Document:

Room. If we do not hear from you in

t:his x'egard wit:hin the specified period,

the report vill be placed in

the Public Document

Room.

8 xoooso O'Dg

1I

I

II "

'I

)>

/

Ir

Pacific

Gas

and Hlectric Company

-.2-

May 11,

1981

Should you have any ruestions

concerning this inspection,

ve t,"ill be

lad to discuss

them c'ith you.

Sincerely,

J, L, Crews, Acting Director

Division of Resident

Reactor

Projects

and Engineering Inspection

Enclosure:

IH Inspection Report

Nos. 50-275/31-08

50-323/81-08

cc'4'/0

J. 0.

J.

D.

[. A.

R.

C.

enclosure:

Schuyler,

PG6Z

Shiffer,

PGGZ

Raymond,

PGGE

Thornberry (Diablo Canyon)