May 3, 2017, Summary of Annual Assessment Meeting for Peach Bottom Atomic Power Station Held
ML17153A105
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/02/2017
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To:
Schroeder D
References
Download: ML17153A105 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 2, 2017 MEETING

SUMMARY

LICENSEE:

EXELON GENERATION CO., LLC FACILITY:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING On May 3, 2017, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 for 2016.

A notice of the open house was issued on April 5, 2017, and was posted on the NRCs external (public) Webpage. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17090A128. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of PBAPS Units 2 and 3 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession No. ML17055B661). The NRC poster boards presented included background on the Reactor Oversight Process and PBAPS performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of PBAPS Units 2 and 3 can be found on the NRC's web site at:

https://www.nrc.gov/reactors/operating/oversight.html.

Members of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding PBAPSs performance and the role of the agency in ensuring safe plant operations.

________/RA/______________

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

Attendee List (ML17128A016)

ML17153A105 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin DSchroeder DATE 6/1/17 6/2/17