ML17201Q546

From kanterella
Revision as of 16:55, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2017 Point Beach Nuclear Plant Initial License Examination Forms ES-D-1 Revision 0
ML17201Q546
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Jesse Seymour
Operations Branch III
To:
Point Beach
Shared Package
ML16319A342 List:
References
Download: ML17201Q546 (4)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____

Scenario No.: _1___________

Op-Test No.: _2017____

Examiners: ___________________________ Operators:

Initial Conditions: _Unit 1 is at approximately 100%. 1PT-950, Loop B Containment Pressure has ___

been removed from service. Repairs are expected to be complete during the upcoming refueling____

outage. 1W-3B, Control Rod Shroud Fan is OOS due to imminent motor failure. ________________

Turnover: Normal Shift routine. Lower power utilizing OP 3A, Power Operation to Hot Standby at _

30%/hr in preparation for refueling outage _______________________________________________

Event No.

Malf. No. Event Type*

Event Description 1

XMT1CNM014A I-BOP I-SRO TS-SRO 1PT-947, Loop A Containment Pressure Transmitter fails low 2

CNH1CFW003F I-BOP I-SRO 1PC-2273, Feedwater Heater Emergency Bypass Valve Controller oscillates in automatic 3

XMT1AFW005A TS-SRO 0LT-4040, T-24A CST Level Transmitter fails low 4

ANN-C02D-A09 R-RO N-BOP R-SRO 1X01, Main Transformer loss of cooling (rapid down power) 5 CNH1PCS004F C-RO C-SRO 1P-2A, Auto Charging Pump controller oscillation failure 6

MAL1RCS001 M-ALL Large Break LOCA 7

BKR1RHR001 MOT1RHR002 C-BOP 1P-10A, RHR pump fails to start in Auto 1P-10B, RHR pump trips upon starting 8

RLY1PPL020 RLY1PPL021 C-BOP Containment Spray fails to actuate (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____

Scenario No.: _2___________

Op-Test No.: _2017____

Examiners: ___________________________ Operators:

Initial Conditions: _Unit 1 is in OP 1C, Startup to Power Operation, at approximately 29% post _

chemistry hold coming out of a forced outage. Chemistry has requested a bump of Main Feed and _

Condensate pumps for iron flushing in accordance with Step 5.31. 1W-3B, Control Rod Shroud Fan _

is OOS due to imminent motor failure. 1PT-950, Loop B Containment Pressure has been removed _

from service. Repairs are expected to be complete during the upcoming refueling outage.__________

Turnover: Start 1P-28B, SGFP and 1P-25B, Condensate Pump then secure 1P-28B SGFP, and _

1P-25B Condensate Pump after 5 minutes for iron flushing. Raise power to 50%. ________________

Event No.

Malf. No. Event Type*

Event Description 1

N-BOP N-SRO Bump SG Feed Pump and Condensate Pump 2

R-RO N-BOP R-SRO Raise power to 50%

3 XMT1SGN001A I-BOP I-SRO TS-SRO 1FI-464, SG Steam Flow fails slowly high 4

XMT1MSS009A I-BOP I-SRO TS-SRO 1PT-486, Turbine First Stage Pressure fails low 5

MAL1RCP001B C-RO C-SRO 1P-1B, RCP Seal leak develops, which degrades requiring reactor trip 6

MAL1RCS003F M-ALL Small Break LOCA from RTD Bypass Line occurs on reactor trip 7

MAL1PPL001A MAL1PPL001B C-RO Reactor fails to trip (CSP-S.1, Response to Nuclear Power Generation/ATWS) 8 MOT1SIS001 BKR1SIS002 C-BOP 1P-15A, SI Pump trips upon starting 1P-15B, SI Pump fails to start in Auto (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____

Scenario No.: _3___________

Op-Test No.: _2017____

Examiners: ___________________________ Operators:

Initial Conditions: _Unit 1 was lowered to approximately 75% at the request of MISO/ATC due to grid stability issues. Grid stability has been restored and the unit is ready to be returned to full power in__

accordance with OP 1C, Startup to Power Operations. 1P-2B, Charging Pump is OOS and isolated _

per OI 50, Charging Pump Isolation for pump repairs. 1W-3B, Control Rod Shroud Fan is OOS due_

to imminent motor failure. 1PT-950, Loop B Containment Pressure has been removed from service._

Repairs are expected to be complete during the upcoming refueling outage. ____________________

Turnover: Commence raising power to 100% _

Event No.

Malf. No. Event Type*

Event Description 1

BKR1SWS001 C-BOP C-SRO TS-SRO P-32A, Service Water Pump trip with reduced head capacity on two running SW pumps 2

XMT1RMS076A C-BOP C-SRO 1RE-219, SG Blowdown Monitor fails high off scale 1MS-2083, HX-1A SG Sample Isolation Control Valve fails open 3

MAL1RCS008A R-RO N-BOP R-SRO TS-SRO SG A Tube Leak approximately 10 gpm (rapid down power) 4 MAL1CCW002A C-BOP C-SRO TS-SRO Running CCW Pump seal leak, lowering surge tank (Pumps need to be shifted) 5 MAL1GEN006 M-ALL Voltage Regulator Trouble leading to a Main Generator Lockout 6

MALCRF001-B6 MALCRF001-B8 MALCRF001-C5 MALCRF001-C7 C-RO Multiple (4) Stuck Rods post trip 7

MAL1RCS008A C-RO SGTL turns into SGTR 8

CNH1PCS007B CNH1PCS008B C-RO Spray valves fail causing use of the PORV for RCS depressurization (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____

Scenario No.: _4___________

Op-Test No.: _2017____

Examiners: ___________________________ Operators:

Initial Conditions: _Unit 1 is at approximately 100%. 1LT-112 VCT Level Transmitter has failed low, _

I&C expect repairs to be completed within the hour and returned to service by the end of shift. 1W-3B, Control Rod Shroud Fan is OOS due to imminent motor failure._______________________________

Turnover: Start 1P-27A, Heater Drain Tank Pump, and secure 1P-27C Heater Drain Tank Pump____

per OP 2A, Normal Power Operations, Attachment M, in preparations for maintenance. Lower power utilizing OP 3A, Power Operation to Hot Standby, in preparation for TS 3, Main Turbine Stop and Governor Valve with Turbine Trip_(Biannual)

Event No.

Malf. No. Event Type*

Event Description 1

N-BOP N-SRO Shift Heater Drain Tank Pumps, start 1P-27A, secure 1P-27C 2

R-RO N-BOP R-SRO Down Power for TS-3 3

MAL1NIS007C I-RO I-SRO TS-SRO NI-43, PR NI fails low fast enough to cause outward rod motion near 12-15 steps/min.

4 XMT1SGN012A I-BOP I-SRO TS-SRO 1LT-471, SG Level fails low slowly (Manual SG level control) 5 XMT1CVC020A I-RO I-SRO TS-SRO 1LT-141, VCT Level Transmitter fails low (Causing an auto shift to the RWST. Manual reactor trip required) 6 MAL1SGN003B M-ALL Steam Generator Fault in Containment on Reactor Trip 7

See SEG C-RO The first set of Reactor Trip push buttons fails to cause a reactor trip, but the second set used is successful 8

PMP1AFW004 PMP1AFW002 C-BOP 1P-53, Motor Driven Auxiliary Feedwater Pump sheared shaft and 1P-29, Turbine Driven Auxiliary Feedwater Pump trips on over speed (CSP-H.1, Response to Loss of Secondary Heat Sink)

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor