Text
~
~
80 05X 3 Q97V I -
g OPERATliVG STATUS OPERATlNG DATA REPORT DOCKET NO.
50 244 DATE Ma 8
1980 COMPLETED BY Andrew E. McNamar TELFPIIONE 1-315-524-4446 Ext. 293, at Ginna I. Ilnit Name:
GiiVNA STATION UN 2
Reporting Pcr;od. ~Aril 1980
,5. I.icenscd Thermal Power (hfWt):
- f. Namcplatc Rating (Gross MWc):
'i. 1)csign I'.Icctrical Rating (Nct MWe):
- 6. hfaximum Dcpcndable Capacity (Gross hfWe):
. hfaximum Dependable Capacity (Net hfWc):
90 Notes Annual Refueling and Maintenance Shutdown continued.
- 8. lfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
'). Power Level to Which Restricted, If Any (Nct MWc):
It). Reasons For Restrictions, If Any:
This hfonth Yr.-to-Date Cumulative I I. Ilours In Reporting Period
- 12. Number of Hours Reactor Was Critical I I Reactor Rescrvc Shutdown Hours I 'i. Ilours Generator On-Line IS. IInit Rc>>ervc Shutdown Hours I 6. Gross Thermal Energy Genera(cd (hfWH)
I'. Gross Electrical Energy Generated (MWkl)
III. iVet Flcctrical Energy Generated (hfWH)
I 9 Unit bcfvlcc Factor 719 0
0 po 2 903 2 114.75 2 114.50 3 118 656 1 021 026 970,811 72.83/
91 415 69 794.52 1,621.57
- 68 071.13 8.5 Yr 91 394 458 29 706 997 28,132,359 74.46%
2i). Iinit Availability Factor 2l. Unit Capacity I actor (Using hfDC Net)
- 22. Unit Capacity Factor (Using,DER Nct) 2.$. Unit Forced Outage Rate 2 f. Shutdowns Scheduled Over Next 6 hfonths (Type, 00 0%
0/
0%
72.83%
71.15%
71.15%
0%
Date and Duration of Each):
74.47%
67.85%
67.85%
- 9. 63%
2>. If Shut Down At End Of Report. Period, Estimated Date of Startup:
May 17, 1980
- 26. Units In Test Status (Prtor to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPERATION Achieved
"< Cumulative Total Commencing January 1, 1975 49 18
- iRKV, IjTii)
~ r
0 AVERAGE DAILYUNIT POWER UNIT A ril 1980 DOCKET NQ. -50 244 UNIT O'I pinna Statio May 8, 1980 COMPLETED BY Andrew E.
McNamara TELEPHONE 1-315 524-444-6 Ext. 293, at Ginna REFUELING AND MAINTENANCE SHUTD(NN CONTINUED DAY AVERAGE DAILYPOWER LEVEL (MWe-N et)
DAY,AVERAGE DAlLYPOWER LEVEL'M We-Net) 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 21 28 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, Compute to the nearest whole megawatt.
49 87 (RKV 1/789
V
UNIT SHUTDOWN AND POWER REDUCTIONS DO(:KI:.T NO.
llNll'NAhlE Nl Ginna Station DATI'.M E9
(:OhlPLETI'.D IIY tt'~~
ndrew E. McNamaha 1 I'.LI'.P)lONE 1-315-2 -
6 Ext. 293, at Ginna No.
Date 0
4 0
~
0 0 X.'-
P4 C0 00 01 ~0 C u 0
0EA C
0n Licensee Event Report II Em 0
IA (J C0 II1 C00 0 Eo lJ Cause & Corrective Action to Prevent Recurrence Annual Refueling and Maintenance Shutdown continued.
I F:
Forced St Scheduled 49 99 1Ravo 1/791 Reason:
A-Etluipmcnt Failure (Explain) ll-hlaintenancc or 1'cst C-Refueling D-Regulatory Restriction E-Operator Training 8: Liccnsc Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) hlethod:
I -hfanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnscc Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
c 5
aa
4-NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
0-2 UNIT Ginna Stat on DATE COMPLETED BY Andrew E. McNamar MONTH A ril 1980 TELEPHONE I."315-524-4446 Ext. 293, at Ginna Annual Refueling and Maintenance Shutdown continued.
49 123 (1/7$ )
~.r-~