CATEGORY 1 REGULATO+INFORMATION DISTRIBUTION +TEN (RIDE)
ACC"SSION NBR:9708180264 DOC.DATE: 97/07/31 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester AUTH.NAME AUTHOR AFFILIATION NORTON,B.A.
Rochester Gas s Electric Corp.
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET G
05000244
SUBJECT:
Monthly operating rept for Jul 1997 for Ginna Station.
W/970813 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
/ENCL g SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 E
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 EXTERNAL LITCO BRYCE F J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 3.
1 1
1 1
RECIPIENT ID CODE/NAME VISSING,G.
FILE CENTER 01 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 Y
D U
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
g ZZZZZZZ "/ll(IIISZ/
~ 1 -. II" '
ZZig)ge PiVSWZ uuN(E liZZZiZZ Q
foal QAlk&
MEM 8P ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 7l6 546.2700 August 13, 1997 US Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for July, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Vissing:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1997.
Very truly yours, cL d.
J s
h A. Wida a t Manager xc:
U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.
NRC Ginna Senior Resident Inspector Attachments
~Q vQ Q~Q 9708i80264 97073i PDR ADQCK 05000244 R
'DR
'IIIIIIIIIII!IIIIIIIII!IIIIIIIIIIIIIIIIj
I
~f I
eS !
l a I'
50-244 COMPLETED BY:
Benjamin A. Norton TELEPHONE (716) 771-3653 Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Ju 1997 3.
Licensed Thermal Power (MWI):
1520 4.
Nameplate Rating (Gross MWe):
517 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
480 8.
IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report. Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe):
- 10. Reason For Restrictions, IfAn:
This Month Yr.-to.Date Cumulative"
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 744.0 0.0 744.0 0.0 1128410.0 380900.0 362656.0 100.0 100.0 101.6 103.7 0.0 508?.0 5087.0 0.0 5087.0 0.0 7678398.0 2621594.0 2496939.0 100.0 100.0 102.3 104.4 0.0 242639.0 195001.3 1687.6
- 192013.5 8.5
- 273554668.0 90731903.0 86142805.8 79.1 79.1 76.5 76.6 5.6
- 24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Therefuelin andmaintenanceouta eisscheduledforOctober20 1997. The lanneddurationis22da s.
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 "CUMUlATIVETOTALCOMMENCINGNOVEMBER 8, 1969
I CI
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE:
Au ust 13 1997 MONTH Jul 1997 COMPLETED BY:
. ~~~
Benjamin A. Norton TELEPHONE:
716 771-3653 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 489 17.
485 490 18.
482 3.
489 19.
482 486 20.
483 5.
487 21.
483 6.
486 22.
486 7.
487 23.
491 8
~
490 24.
497 9.
491 25.
497 10.
490 26.
498 487 27.
495 12.
488 28.
491 13.
489 29.
484 14.
487 30.
483 15.
487 31.
482 16.
487 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
~
I 1
I 4 I 4
t
DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY:
Benjamin A. Norton N
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH ~Jul 1997 No.
Date Type Duration
. (hours)
Reason'ethod of shuting down reactors'icensee Event Report ¹ System Code'omponent Code'ause
& Corrective Action to Prevent Recurrence 1
F: Forced S:
Scheduled 2
Reason:
A-Equipment (Explain)
B-Maintenance or Test C-Refueling D-Regulatory E-Operator Training &
Lecensee Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1-Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:
Au ust 13 1997 COMPLETED BY:
TELEPHONE:
Benjamin A. Norton 716 771-3653 MONTH Jul 1997 The unit operated at full power for the entire month of July.
The average power level was 99.8'%
RG&E GINNASTATION OPERATING
SUMMARY
July, 1997 Page1 of 2 OPERATIONS RECORDS Category 3.4.8 Reviewed by GROSS GENERATION
¹11 TRANSFORMER
¹12A TRANSFORMER
¹12B TRANSFORMER MWH MWH MWH MWH
¹11 AND¹12 TRANSFORMER, ON LINE MWH NET GENERATION ON LINE
¹11 TRANSFORMER, OFF LINE MWH MWH
¹12A TRANSFORMERS, OFF LINE MWH
¹12B TRANSFORMER, OFF LINE MWH AVERAGEGENERATION/HR GROSS MW TOTALSTATION SERVICE / GROSS GENERATION ON LINE HOURS OFF LINE HOURS TOTALHOURS UNIT RESERVE SHUTDOWN HOURS "Cumlative Total Commencing January 1, 1975 MONTH 380900.0 16721.0 562.0 961.0 18244.0 362656.0 0.0 0.0 0.0 512.0 0.0 744.0 0.0 744.0 0.0 YEAR 2621594.0 115613.0 3519.0 5523.0 124655.0 2496939.0 0.0 0.0 0.0 515.4 0.0 5087.0 0.0 5087.0 0.0 TO DATE 90731903.0 4241560.0 283931.4 63605.8 4589097.2 86142805.8 3958.0 264301.8 47324.0 472.5 0.1 192013.5 50625.4 242639.0 8.5
'ross Plant Efficiency Gross Plant Heat Rate Unit Operating Factor Unit Service Factor UnitAvailabilityFactor Unit Capacity Factor BTU/KWH 33.8 10111.0 99.8 100.0 100.0 101.6 34.1 9996.4 99.3 100.0 100.0 102.3 33.2 10290.1 75.8 79.1 79.1 76.5
4
~ ~
l'
RG8 E GINNASTATION OPERATING
SUMMARY
July, 1997 Page2of2 OPERATIONS RECORDS Category 3.4.8 Reviewed by NUCLEAR NUCLEAR PLANTOPERATION (HOURS)
NUCLEAR PLANT SHUTDOWN (HOURS)
REACTOR RESERVE SHUTDOWN (HOURS)
NUCLEAR PLANTTOTAL (HOURS)
NUMBER OF CRITICALITIES NUMBER OF SHUTDOWNS a) Normal b)Trips c)Total MONTH 744.0 0.0 0.0 744.0 0.0 0.0 0.0 0.0 YEAR 5087.0 0.0 0.0 5087.0 0.0 0.0 0.0 0.0 TO DATE 195001.3 46352.6 1687.6
'43041.5 385.0 279.0 105.0 384.0 GROSS THERMAL EQUIVALENTFULL POWER (HOURS)
Cumulative Total Commencing January 1, 1975 MWTh 1128410.0 742.4 7678398.0 5050.6 273554668 181908.0 Reactor Service Factor Reactor AvailabilityFactor UNITFORCED OUTAGES Unit Forced Outage (Hours)
Unit Forced Outage Rate 100.0 100.0 0.0 0.0 100.0 100.0 0.0 0.0 80.2 80.9 11446.7 5.6 NOTE: This form has been revised to be consistent with U.S. Nuclear Regulatory Guide 1.6, Appendix A, Rev. 4, Aug. 1975 Titled "Reporting of Operating Information"- Technical Specifications
100 JULY 1997 Q~~N~R~Q 8N~
R0%~I S %~~~%
80 gO 60 0
40 20 0
e 3
5 7
9 11 13 15 17 19 21 23 25 27 29 31 Date
.L S
~
7 Jl P
'l e