Responds to NRC Re Violations Noted in Insp Rept 50-316/92-02 on 921203-18.Corrective Actions:Lube Oil Restored to Proper Level Prior to Declaring EDG Operable on 921005
ML17331A058
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/26/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Lieberman
NRC OFFICE OF ENFORCEMENT (OE), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1175D, NUDOCS 9303020079
Download: ML17331A058 (15)


Text

ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM (Ii REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSIOI'; NBR:9303020079 DOC.DATE: 93/02/26 NOTARIZED: YES DOCKET

~FACIL:56-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E; Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION LIEBERMAN Ofc of Enforcement (Post 870413)

SUBJECT:

Responds to NRC 930208 ltr re violations noted in insp rept 50-316/92-02 on 921203-18.Corrective actions:lube oil restored to proper level prior to declaring EDG operable on operable on 921005.

DISTRIBUTION CODE:

IE14D COPIES RECEIVED:LTR

/ ENCL 2 SIZE:

TITLE: Enforcement Action Non-2.790-Licensee

Response

NOTES:

RECIPIENT, ID CODE/NAME PD3-1 LA DEANPW INTERNAL: AEOD/DOA DEDRO NRR/PMAS/ILRB12 OE D

G FI 02 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

=-

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB11 NUDOCS-.ABSTRACT OE FILE 01 RGN3 FILE 03 NSIC COPIES LTTR ENCL 1, 1 1

1 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 15

Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 INDIANA NICHIGAN POWER

~'4 ice Donald C.

Cook Nuclear Plant Unit 2 Docket No. 50-316 License No.

DPR-74 NRC INSPECTION REPORT NO. 50-316/92022 REPLY TO NOTICE OF VIOLATION Director, Office of Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attn:

Document Control Desk AEP:NRC:1175D 10 CFR 2.201 February 26, 1993'ear Mr. Lieberman:

This letter is in response to your letter dated February 8,

1993, which forwarded a Notice of Violation and proposed imposition of a civil penalty in the amount of $37,500.

The Notice of Violation and associated civil penalty resulted from a special safety inspection conducted by J.

A., Isom and D.

J.

Hartland on December 3

through 18, 1992.

The violations are associated with the trip of the Unit 2 AB emergency diesel generator on September 28, 1992 due to low lube oil level.

Our reply to the Notice of Violation is provided in the attachment to this letter.

The

$37,500, civil penalty will be remitted electronically on March 8, 1993.

This letter is submitted pursuant to 10 CFR 50.54(f)

and, as such, an oath statement is enclosed.

Sincerely,

~

EF~pwj E. E. Fitzpatrick Vice President dr Enclosure Attachment egg gpppp79

~ o PDR ADOCK P o PDR 8

Mr. J.

Lieberman AEP:NRC!1175D cc:, A. A. Blind Bridgman J.

R. Padgett G. Charnoff A. B. Davis Region III NRC Resident InsPector Bridgman NFEM Section Chief

Mr. J.

Lieberman AEP:NRC:1175D bc:

S. J.

Brewer D. H. Malin/K. J. Toth M. L. Horvath - Bridgman J.

B. Shinnock W. G. Smith, Jr.

W. M. Dean, NRC Washington, D.C.

AEP:NRC:1175D DC-N-6015.1

~ STATE OF OHIO)

COUNTY OF FRANKLIN)

E. E. Fitzpatrick, begin duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power

Company, that he has read the forgoing response to NRC INSPECTlON REPORT NO.

50-316/92022 and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.

PE~ ~i Subscribed and sworn to me before this ~~~

I day of 19~.

NOTARY PUBLIC RITA D. HILL f(OTAPY PU~UC STAlf OF OHIO

ATTACHMENT TO AEPtNRC!1175D REPLY TO NOTICE OF VIOLATION

Attachment to AEP:NRC:1175D Page

1 Background

On September 28, 1992, with Unit 2 in Mode 5 (Cold Shutdown),

the Unit 2 AB Emergency Diesel Generator (EDG) was started for a routine surveillance test.

Twenty four seconds after the start, the EDG tripped due to low lube oil pressure.

The lube oil level indicator for the

EDG, a simple pressure
gauge, indicated that there was 309 gallons in the lube oil tank.

A level check of the lube oil tank, via tape measure, indicated 127 gallons.

(The minimum lube oil tank level necessary for operability of the Unit 2

AB EDG was later determined to be 212 gallons.)

The low level alarm, which operates at -a setpoint corresponding to approximately 395 gallons, failed

.to'ctuate.

The low lube oil condition was attributable to a leak that had developed in the EDG Before and After (B&A) pump.

This pump provides a

small (60 gpm) amount of oil flow both during EDG operation and at standby so that the EDG components are constantly lubricated.

The leak had been reported on May 9,

1992, during a

material condition walkdown.

The leak rate at the time of the EDG trip was approximately 3 gallons per day, and -i.s believed to have remained relatively constant from the date of discovery through the

date, following the trip event, that the pump was repaired.

Attachment to AEP:NRC:1175D Page 2

NRC Violation Z "Technical Specification 3.8.1.1 requires that two emergency diesel generators (EDGs).'be operable for operation in Modes 1

through 4.

With one EDG inoperable, the inoperable EDG is required to be restored 'to an operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the unit must be put in at least Hot Standby (Mode 3) within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Cold Shutdown

'(Mode 5) within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Contrary to the above, on or about September 10,

1992, AB EDG became inoperable with the unit in Modes 3 and 4, the EDG was not restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and the unit was not put in cold shutdown (Mode 5) within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

This is a Severity Level ZZZ violation."

Response

to Violation Z Prior to the EDG trip on September 28, the EDG was thought to be operable.

Thus, operation. of Unit 2 for a period in excess of the time allowed by the EDG T/S was not intentional, but rather resulted from a failure to recognize that the EDG was inoperable due to a low lube oil condition.

Subsequent to the EDG trip, the EDG was immediately declared inoperable and corrective and preventive actions were initiated.

All T/S requirements were satisfied subsequent to the trip.

The minimum lube oil tank level necessary for EDG operability has been determined to be 212 gallons.

This amount includes the minimum tank level at which the engine-driven lube oil pump can maintain suction (135 gallons) plus engine drawdown which was determined through measurement to be 77 gallons.

Based on this information, and the average B&A pump leak, the EDG could have become inoperable as early as September 2 f 1992.

This differs slightly from the date of September 10/

1992, mentioned in the violation.

Our calculated date was based on actual drawdown measurements on the Unit 2 AB EDG.

The NRC value was based on drawdown measurements taken on a

different EDG, during the special inspection.

(The Unit 2 AB diesel was not in a condition during the inspection that allowed drawdown data to be taken.)

The EDG trip was of significant concern to Cook Nuclear Plant management.

Zmmediate actions were taken to ensure that similar problems did not exist on the other

EDGs, and to ensure that damage had not been done to the Unit 2 AB diesel due to the low lube oil condition.

The Plant Manager set up a Multidisciplinary Task Force to look at the event, determine root and contributing

causes, and determine necessary corrective and prevengive actions.

The Operations Superintendent also established a

task force that was chartered to review the operations tour and data gathering processes for improvements that could help prevent an event of this nature in the future.

The corrective and preventive actions taken as a result of the trip will be discussed in more detail below.

Attachment to AEP:NRC:1175D Page 3

Although the Unit 2 AB diesel was rendered inoperable by the low lube oil condition, the event is believed to have low safety significance.

This is based on the fact that offsite power (both preferred and reserve) was available continuously throughout the time period that the EDG was, inoperable.

Additionally, the redundant Unit 2

CD EDG was operable throughout the period (with the exception of approximately 10 minutes during a surveillance run.)

An analysis of the impact of this event on the probabilistic risk assessment analyses performed for the Cook Nuclear Plant indicated that the increase in core melt frequency was only approximately 3%.

This small impact is due to the reliability of the offsite power sources as well as the reliability of the iedundant EDG.

Admission or Denial of the Alle ed Violation Indiana Mich5.gan Power admits to the violation as cited in the NRC Notice of Violation.

2 ~

Reasons for the Violation The actual cause of the EDG trip was a low level in the lube oil tank.

The cause of the low lube oil level was a leak that had developed in the B&A pump seal.

The root cause of the event has been determined to'e our failure to identify an adverse lube oil level trend.

Contributing factors included our failure to recognize that the lube oil level was below the acceptance criteria for this parameter, as well as failure of the level alarm to actuate and failure of the level indicator to provide an accurate reading.

The root and contributing causes will be discussed in. more detail below.

3.

Corrective Actions Taken and Results Achieved Immediately following the EDG trip on September 28, it was determined through measurement of the tank level with a tape measure that the cause of the trip was low lube oil level in the lube oil tank.

The lube oil level in the lube oil tanks for the other 3 EDGs were checked that same day.

Prior to restoration of the Unit 2 AB EDG to operable status on October 5,

the following actions were completed:

a 0 The lube oil tank level was restored to the normal operating range.

b.

c ~

All.visible bearing surfaces were visually inspected for abnormal wear.

A lift check was performed for two of the EDG bearings.

The bearings that were lift checked were bearing no. 4, since it is the most heavily

loaded, and bearing no.

7, since it is at the furthest end of the lube oil header.

A

Attachment to AEP:NRC:1175D Page 4

e.

Bearing no.

4 was pulled and inspected.

Some deterioration was evident and was attributable to normal wear.

The bearing lower half was replaced as a precautionar'y measure.

The defective BRA pump seal was

replaced, eliminating the lube oil leak.

The lube oil'sump tank low level alarm switch was disassembled and

cleaned, to restore proper operation.

go The level indicator's calibration was checked and determined to be adequate.

The gauge was vented and returned to service.

4.

Corrective Action Taken to Avoid Further Violations Daily dip measurements of lube oil tank level were initiated on September 28, and still continue.

Additionally, the surveillance test procedure for the monthly EDG operability test has been revised to require recording of lube oil level prior to EDG start.

5.

Date When Full Com liance will be Achieved At the time of the EDG trip, Unit 2 was in Mode 5.

T/Ss only require one EDG to be operable in this mode.

This function was performed by the redundant Unit 2 CD EDG.

The Unit 2

AB EDG was restored to operable status on October 5, 1992.

Attachment to AEP:NRC:1175D Page 5

NRC Violation II A "10 CFR Part 50, Appendix B, Criterion V., requires, in part/

that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with those instructions, procedures, or drawings.

Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.

Contrary to the

above, Test No.

73A of Attachment No.

2 of licensee procedure "Preventative Maintenance and Performance Monitoring Surveillance Testing for Non Technical Specification Equipment," Revision 10, April 19, 1990, which monitored the lube oil inventory and is a

surveillance activity affecting quality, did not contain minimum acceptance criteria for the EDG lube oil volume.

This is a Severity Level ZV violation."

Response

to Violation IZ A I

Although the acceptance criteria was not included in OHI-5030 (which recorded lube oil level on a

weekly basis),

the administrative limit was included in the shiftly Operations Department tour

guide, OHI-4030 STP.001.001.

The

issue, therefore, was not failure to have acceptance criteria in plant procedures, but rather one of maintaining the acceptance criteria in a

location consistent with human factors considerations.

Because the level gauge was not seismically qualified, the gauge was isolated during normal operations by a

manual. valve.

In order to read the level

gauge, the operator had to valve it into service, and valve position had to be independently verified after. restoration.

The level gauge is located in an area that is now considered to be a

confined space, per OSHA regulations.

Entry into this area requires special air monitoring equipment, for personnel protection.

With these considerations, the lube oil level was monintored during the weekly surveillance rather than during the shiftly operator tour.

The ability of the operators to recognize that lube oil tank level was below the administrative limit was hampered by instrumentation failures as well as inadequacies in the lube oil level trending process.

These issues are discussed in the response to Violation ZZ B, below.

Admission or Denial of the Alle ed Violation Indiana Michigan Power admits to the violation as cited in the NRC Notice of Violation.

Attachment to AEP:NRC:1175D Page 6

2 ~

Reasons for the Violation As discussed

above, acceptance criteria was provided to the operators, but in a location that did not adequately consider human factors considerations.

3.

Corrective Actions Taken and Results Achieved On October 30, procedure OHI-5030 was revised to include the administrative limit of 400 gallons on the data sheet.

The revision also modified the data sheet such that 7 consecutive lube oil level (daily) readings are recorded.

4 ~

Corrective Action Taken to Avoid Further Violations The corrective actions taken to avoid further violations are discussed in the response to Violation II B, below.

5.

Date When Full Com liance will be Achieved Full compliance was achieved on October 30,

1992, when procedure OHI-5030 was modified to include the administrative limit of 400 gallons on the lube oil data sheet.

Attachment to AEP:NRC:1175D Page 7

NRC Violation II B "10 CFR Part 50, Appendix B, Criterion XVZ, requires, in part, that measures shall be established to assure that conditions adverse to

quality, such as
failures, malfunctions, deficiencies, deviations, defective material and equipment, are promptly identified and corrected.

Contrary to the above, on May 9, 1992, the licensee identified.

that a

pump seal on the Unit 2 "AB" EDG "Before and After" pump was leaking lube oil, a condition adverse to quality, but failed to promptly correct the constantly dropping proper level of oil in the EDG lube oil tank or maintain a proper level until after September 24, 1992.

This is a Severity Level ZV violation."

Response

to Violation ZZ B The failure to maintain a proper level of lube oil in the tank was due to the failure of the Operations Department to recognize the adverse trend of decreasing lube oil level.

The level recorded by Operations during the weekly surveillances decreased from an indicated 737 gallons on April 29 to an indicated 309 gallons on September 28.

The weekly lube oil readings are provided to the Unit Supervisors for review.

This review is intended to identify adverse trends.

However, at the time of the event the Unit Supervisors would only have had available in the control room the present week' surveillance results and the results from the previous week.

Due to data scatter two consecutive weekly data points would not necessarily have been a

good indicator of an adverse trend.

Although the overall trend during the period from late April through late September was clearly downward, there were weeks where the level readings actually increased from the previous week.

Corrective actions discussed below address improvements we are making to the Operations trending process.

The failure of the Operations Department to maintain the proper level in the tank was complicated by equipment failures.

At the time of the trip, the level gauge was reading 309 gallons, versus the actual level in the tank of 127 gallons.

The error in the reading has been attributed to the presence of air in the sensing line.

The present level gauges were installed in April

1991, to replace level instrumentation that had become obsolete.

In order to avoid adding new penetrations to the lube oil tank, the decision was made to install the level gauges on an existing sample line.

The design as originally specified called for the level gauge to be installed horizontal to the sample piping, which would have precluded an air problem.

Due to obstructions, the final design installed the gauge on a riser, approximately one foot above the sample pipe.. Appropriate reviews and approvals were obtained for the change to the original design.

However, it was not recognized by the personnel involved that the change introduced the possibility of air., entering the sensing line during operation of the sample valve.

Subsequent to the trip, the level indicator's calibration was checked and determined

Attachment to AEP:NRC:1175D Page 8

to be adequate.

However, the gauges are currently considered to be inoperable due to the design deficiency.

The design is considered to be non-standard in that it is not our normal practice to have level instrumentation installed on sample lines.

The lube oil low level alarm, which should have alarmed once level reached approximately 395 gallons in the tank, failed to actuate.

During diagnostic

testing, the alarm operated intermittently.

This suggested that some foreign matter may have been in the pivots of the alarm switch, although none was observed.

The low level alarm switch mechanism was cleaned and the intermittent operation could no longer be duplicated.

The level alarms receive an inspection every four years as part of our preventive maintenance program.

We reviewed the vendor recommended maintenance practices for these devices, as well as our maintenance history and the industry operating experience (INPO's Nuclear Plant Reliability Data System) for these devices.

The available information indicated no deficiencies in our level alarm maintenance program.

Nevertheless corrective actions we willbe taking to preclude recurrence are discussed below.

Admission or Denial of the Alle ed Violation Indiana Michigan Power admits to the violation as cited in the NRC Notice of Violation.

2.

Reasons for the Violation As discussed above,'he violation resulted from the

, failure of the Operations Depaitment to recognize an adverse trend'f decreasing lube oil level.

Contributing factors included failure of the lube oil level alarm to actuate, and the failure of the level indicator to provide an accurate.

reading.

Also contributing to the event was the fact that the administrative limit.of 400 gallons for lube oil tank inventory was not included on the data sheet used for the weekly lube oil level surveillance.

(See Violation II A.)

3 ~

Corrective Actions Taken and Results Achieved Lube oil level was restored to its proper level prior to declaring the EDG operable on October 5, 1992.

4 ~

Corrective Action Taken to Avoid Further Violations The following corrective actions address both Violations ZI A and ZI B.

Attachment to AEP:NRC:1175D Page 9

Within two days of the EDG trip, the Operations Department Superintendent issued a memo to the operating shifts informing them of the issues and establishing a

task force to review Operations tour and data gathering processes for possible improvements.

The following corrective actions arose from that task force:

a ~

b.

A review of the tour procedures will be conducted to determine appropriate critical parameters that should be monitored during the tours.

The review will also examine acceptance

criteria, communication
methods, and trending methods for these critical parameters.

This review will be completed by June 30, 1993.

A tour assignment policy was issued to require, whenever possible, that an operator be assigned a

plant tour-for a long enough period to establish a sense of personal ownership of that tour.

This pol'icy was issued January 22, 1993.

C ~

All tour operators will complete a review of the tour procedures, including plant walkthroughs.

This activity will be completed by March 31, 1993.

A tour guide, sized to fit in a pocket, to be used for reference only by the tour operators will be issued by March 31, 1993.

Regarding the level alarm

failure, we verified proper operation of the Unit 1

AB diesel generator lube oil tank level alarm on February 9,

1993.

We -will verify proper operation of the level alarms on the other three EDG lube oil tanks during the next scheduled outages for those EDGs.

We also will increase the frequency of level alarm operational checks from once every four years to every refueling outage, and increase the scope such that it includes a full operational check.

Regarding the issue of level gauge inaccuracies due to air in the sensing

line, we will review other level gauge installations for similar deficiencies.

This review will be completed by March 15, 1993.

5.

Date When Full Com liance will be Achieved Full compliance was achieved on October 5,

1992, when the Unit 2 AB EDG was declared operable with adequate lube oil level.