t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER
& LIGHT COMPANY et al.
DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
67 License No. NPF-63 2.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power
& Light Company, (the licensee),
dated July 19,
- 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:
96i0080435 96i003 PDR ADOCK 05000400 P
3.
(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No. 67, are hereby incorporated into this license.
Carolina Power
& Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE N CLEAR REGULA RY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 3, 1996 Eugene V. Imbro, Director Project Directorate II-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO.
67 FACILITY OPERATING LICENSE NO.
NPF-63 DOCKET NO. 50-400 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised area is indicated by a marginal line.
Remove Pa e
3/4 6-11 Insert Pa e
3/4 6-11
CONTAINMENT SYSTEHS 3/4. 6. 2 OEPRESSUROl'ION ANO COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent Containment Spray Systems shall be OPERABLE with each Spray System capable of taking suction from the RWST and transferring suction to the containment sump.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With one Containment Spray System inoperable, restore the inoperable Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable Spray System to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Refer also to Specification 3.6.2.3 Action.
SURVEILLANCE REQUIREHENTS 4.6.2.1 Each Containment Spray System shall be demonstrated OPERABLE:
a.
b.
C.
d.
At least once per 31 days by verifying that each valve (manual, power-operated.
or automatic) in the flow path that is not locked, sealed.
or otherwise secured in position. is in its correct position:
By verifying that, on an indicated recirculation flow of at least 1832 gpm. each pump develops a differential pressure of greater than or equal to 186 psi when tested pursuant to Specification 4.0.5:
At least once per 18 months during shutdown, by:
1.
Verifying that each automatic valve in the flow path actuates to its correct position on a containment spray actuation test signal and 2.
Verifying that each spray pump starts automatically on a containment spray actuation test signal.
3.
Verifying that. coincident with an indication of containment spray pump running, each automatic valve from the sump and RWST actuates to its appropriate position following an RWST Lo-Lo test signal.
At least once per 10 years by performing an air or smoke flow test
)
through each spray header and verifying each spray nozzle is unobstructed.
SHEARON HARRIS - UNIT 1 3/4 6-11 Amendment No.