IR 05000272/1980030

From kanterella
Revision as of 05:05, 6 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Insp Repts 50-272/80-30 & 50-311/80-21 on 801117-21. Noncompliance Noted:Failure to Equip All Security Force Members W/Communications & Record Entry Into Vital Areas. Details Withheld (Ref 10CFR2.790)
ML18086A616
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/23/1981
From: Bailey R, Devlin J, Mckeown L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18086A611 List:
References
50-272-80-30, 50-311-80-21, NUDOCS 8106040081
Download: ML18086A616 (2)


Text

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

- 50-272/80-30 Report No.-:; :S0-311/80-21

-

50-272 Docket No.;,. *:

50-311 License N DPR-70 DPR-75 Safeguards Group __

I_V_

Licensee:

Public Service Electric and Gas Company 80 Park Plaza Newark, New Jersey 07101 Facility Name:

Salem Nuclear Generating Station, Units 1 and 2 Inspection At:

Hancocks Bridge, New Jersey Inspection Conducted:

November 17-21, 1980 Date of Last Physical Security Inspection Visit:

July 14-18, 1980 Type of Inspecti Security 1-l-c!:1 -RO date

/-II/- 'l</

Lisa M. McKeown, Physical Security Inspe~tor date date 1 /2s. /?1 Approved by~~c~~~

Investigation I date'

'

  • ( James W. Devlin, Chief, Security and

~Section, Safeguards Branch Inspection Summary:

Ins ection on November 17-21, Nos. 50-272/80-30 and 50-311/80-21 1980 Combined Ins ection Re ort Areas* Inspected: Implementation and compliance with the accepted physical security*

plan relative to the Security Program Audit, Security Organization, Physical Barriers (PA)(VA), Lighting, Access Controls, (Identification), (Search), (Escorting), and (Vital Areas)~ Alarm Stations, Detection Afds, Assess.ment Aids, Corrununications, Test-ing and Maintenance, Compensatory Measures, Power Supply, Response, Locks, Keys and Combinations and Records and Reports, I&E Bulletin 79-16, and I&E Circular 80-0 Followup on licensee action on previously identified items of noncompliance related to physical.security. The inspection involved 68 inspector-hours onsite by two NRC regional ~a~ed inspectors and commenced during regular hour *

Results: The licensee was found to be in compliance with NRC requirements within 21 areas examined during the inspection except *for the following seven items:

Region I Form 167 (August 1979)

Security Organization - Failure to equip all security force members with corranuni-cations; EhY-sical Barriers (PA) - Failure to maintain the isolation zones free of structures _and materials; Access Control - [Identification) - Failure to collect all photo~ ~dentification badges; Access Control (_Vital Area) - Failure to control access to:-V3tal Area; Access Control (_Authorization) - Failure to have a bullet resistant enclosure for the last person who grants access to the Protected Area; Records - Failure to document the test of detection aids; and Access Control -

Failure to record the name, badge number, time and date of entry and reason for entry to Vital Areas *

r