ML18176A259

From kanterella
Revision as of 18:09, 5 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2019 GNFA Inspection Schedule (Non-Safeguards)
ML18176A259
Person / Time
Site: 07001113
Issue date: 06/25/2018
From: Eric Michel
NRC/RGN-II/DFFI
To: Beard B
Global Nuclear Fuel
References
Download: ML18176A259 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 25, 2018 Mr. Brad Beard Plant Manager Global Nuclear Fuel-Americas, L.L.C.

P.O. Box 708, Mail Code J20 Wilmington, NC 28402

SUBJECT:

GLOBAL NUCLEAR FUEL-AMERICAS, L.L.C. - CALENDAR YEAR 2019 INSPECTION SCHEDULE

Dear Mr. Beard:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Global Nuclear Fuel-Americas, L.L.C (GNF-A) facility in Wilmington, NC for calendar year 2019. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that inspections related to Safeguards are not included in this schedule. In addition, any regional initiative or other reactive inspection is not included. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Tom Vukovinsky at (404) 997-4622 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-1113 License No. SNM-1097

Enclosure:

2019 GNF-A Inspection Schedule cc: (See page 2)

B. Beard 2

cc:

Scott Murray, Manager Facility Licensing Global Nuclear Fuels - Americas, L.L.C.

Electronic Mail Distribution W. Lee Cox, III, Chief North Carolina Department of Health and Human Services Division of Health Service Regulation Radiation Protection Section Electronic Mail Distribution

ML18176A259 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI SIGNATURE

/RA/

/RA/

NAME MRuffin TVukovinsky DATE 6/22/2018 6/22/2018 6/ /2018 6/ /2018 6/ /2018 6/ /2018 6/ /2018 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Enclosure GLOBAL NUCLEAR FUEL-AMERICAS, L.L.C.

2019 INSPECTION/ACTIVITY PLAN CALENDAR NRC Inspection 1 Dates March 4 - 8 Number of Inspectors 3

Inspection Procedures (IPs)

IP 88015 Nuclear Criticality Safety IP 88020 Operational Safety IP 88025 Maintenance and Surveillance of Safety Controls NRC Inspection 2 Dates June 17 - 21 Number of Inspectors 3

Inspection Procedures (IPs)

IP 86740 Inspection of Transportation Activities IP 88030 Radiation Protection IP 88045 Effluent Control and Environmental Protection NRC Inspection 3 Dates July 29 - August 2 Number of Inspectors 4

Inspection Procedures (IPs)

IP 88050 Emergency Preparedness IP 88055 Fire Protection Triennial NRC Inspection 4 Dates October 21 - 25 Number of Inspectors 3

Inspection Procedure (IP)

IP 88015 Nuclear Criticality Safety IP 88020 Operational Safety IP 88025 Maintenance and Surveillance of Safety Controls