ML18193A307

From kanterella
Revision as of 17:42, 5 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Louisiana Energy Services, L.L.C., Urenco USA Facility, Docket Number 70-3103, Authorization to Introduce Uranium Hexafluoride Into Cascade 6.4
ML18193A307
Person / Time
Site: 07003103
Issue date: 07/11/2018
From: Lesser M
NRC/RGN-II
To: Cowne S
URENCO USA
References
Download: ML18193A307 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 11, 2018 Stephen Cowne, Chief Nuclear Officer and Compliance Manager URENCO USA P.O. Box 1789 Eunice, NM 88231

SUBJECT:

LOUISIANA ENERGY SERVICES, L.L.C., URENCO USA FACILITY, DOCKET NUMBER 70-3103, AUTHORIZATION TO INTRODUCE URANIUM HEXAFLUORIDE INTO CASCADE 6.4

Dear Mr. Cowne:

On July 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) received your letter requesting authorization to initiate feed inlet and commence operation of Assay 6, Cascade 4 (Cascade 6.4) at the Louisiana Energy Services, URENCO USA Facility located in Eunice, New Mexico. This letter confirms the U.S. NRCs authorization (provided verbally on July 11, 2018) to introduce uranium hexafluoride into Cascade 6.4 for normal operations. This authorization is pursuant to the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 70, Paragraph 70.32(k) and 10 CFR 40.41(g) that states, No person may commence operation of a uranium enrichment facility until the Commission verifies through inspection that the facility has been constructed in accordance with the requirements of the license.

This NRC authorization is based on the results of construction and quality assurance inspections of various aspects of Assay 6 in Separation Building Module (SBM)-1005, previous operational readiness reviews performed for other cascades in SBM-1005, and the review of testing results to support operation of Cascade 6.4 completed on July 11, 2018. The results of construction and quality assurance inspections, and previous operational readiness reviews for other cascades in SBM-1005, are documented in several inspection reports listed in the enclosure to this letter (Enclosure). The inspection results for the operational readiness review of Cascade 6.4 will be documented in NRC Inspection Report 70-3103/2018-003, which should be issued no later than July 30, 2018.

The NRC staff determined that the systems, structures, and components designed to support safe operation of Cascade 6.4 were constructed in accordance with the requirements of your license. Specifically, our inspections verified that there was reasonable assurance that: (1) the design, construction, and implementation of items relied on for safety (IROFS) will protect against natural phenomena and the consequences of potential accidents; (2) the Quality Assurance Program was adequately implemented during construction; and (3) the construction of the IROFS was completed in accordance with the documents comprising the license and the Integrated Safety Analysis Summary.

S. Cowne 2

Please note that this authorization does not apply to any Cascades other than Cascade 6.4, and it does not apply to processes or components associated with future phases of facility operations.

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this letter, please contact Mr. Robert E. Williams Jr.,

at 404-997-4664.

Sincerely,

/RA/

Mark S. Lesser, Director Division of Fuel Facility Inspection Docket No. 70-3103 License No. SNM-2010

Enclosure:

List of Inspection Reports for the Construction, Quality Assurance, and Operational Readiness Reviews Supporting the Authorization of Cascade 6.4 cc: (See page 3)

S. Cowne 3

cc:

Butch Tongate, Cabinet Secretary New Mexico Department of Environment Office of the Secretary 1190 St. Francis Drive P.O. Box 26110 Santa Fe, NM 87502-0157 Billy Hobbs, Mayor City of Eunice P.O. Box 147/1106 Ave J Eunice, NM 88231 The Honorable Sam D. Cobb, Mayor City of Hobbs 200 E. Broadway Hobbs, NM 88240 Stephen Aldridge, Mayor City of Jal P.O. Drawer 340 Jal, NM 88252 Chair Ron R. Black Lea County Board of County Commissioners Lea County Courthouse 100 North Main Avenue, Suite 4 Lovington, NM 88260 Daniel F. Stenger, Counsel Hogan Lovells VP LLP 555 13th Street, NW Washington, DC 20004 Santiago Rodriguez, Chief Radiation Controls Bureau NM Environment Department PO Box 5469 Santa Fe, NM 87502-5469 cc: (Contd on page 4)

S. Cowne 4

(cc: contd)

David Sexton, Managing Director UUSA, President and Chief Executive Officer Louisiana Energy Services, LLC URENCO USA P.O. Box 1789 Eunice, NM 88231 Dave.Sexton@Urenco.com Lisa Hardison, Manager of Communications and Public Relations Communications and Public Relations Louisiana Energy Services, LLC URENCO USA P.O. Box 1789 Eunice, NM 88231 Lisa.Hardison@urenco.com Richard Goorevich, Director of Government Affairs Government Affairs Louisiana Energy Services, LLC URENCO Ltd.

1560 Wilson Blvd. Suite 300 Arlington, VA 22209 Richard.Goorevich@urenco.com Perry Robinson, Outside General Counsel URENCO USA P.O. Box 1789 Eunice, NM 88231 Perry.Robinson@urenco.com Richard A. Ratliff, PE, LMP Radiation Program Officer Bureau of Radiation Control Department of State Health Services Division for Regulatory Services 1100 West 49th Street Austin, TX 78756-3189

ML18193A307 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI RII:DFFI SIGNATURE

/RA/

/RA/

/RA/

NAME KKirchbaum JRivera RWilliams DATE 7/11/2018 7/11/2018 7/11/2018 E-MAIL COPY YES NO YES NO YES NO

Enclosure List of Inspection Reports for the Construction, Quality Assurance, and Operational Readiness Reviews Supporting the Authorization of Cascade 6.4 Report Number ADAMS Accession Number Inspection Area(s) 2006001 ML070190661 Quality Assurance Program and Geotechnical/Foundation Activities 2007001 ML071440430 Quality Assurance 2007002 ML072280647 Quality Assurance, Geotechnical/Foundation Activities, and Structural Concrete Activities 2007003 ML073060571 Quality Assurance, Structural Concrete Activities, 10 CFR Part 21 Inspection-Facility Construction, and Safety Function Interfaces 2007004 ML080670475 Quality Assurance 2008001 ML081160345 Quality Assurance, 10 CFR Part 21 Inspection-Facility Construction, Structural Concrete Activities (SBM), and Structural Steel and Support Activities (SBM) 2008002 ML081930118 Quality Assurance, Safety Function Interfaces, Geotechnical and Foundation Activities (SBM), Structural Concrete Activities (SBM-1001),

Structural Steel and Support Activities, and Structural Welding 2008003 ML083040618 Quality Assurance (SBM-1001), 10 CFR Part 21-Facility Construction, Geotechnical and Foundation Activities, Structural Concrete Activities, Structural Steel and Support Activities (SBM), Structural Welding (SBM-1001) 2008004 ML083540709 Quality Assurance (SBM) 2008005 ML090610203 Quality Assurance 2008006 ML090790642 Quality Assurance 2009001 ML090850669 Quality Assurance 2009002 ML091770643 Nuclear Welding General (SBM), Structural Welding General, Geotechnical and Foundation Activities, Structural Concrete Activities (SBM), Structural Steel and Support Activities, and Quality Assurance (SBM-1001) 2009003 ML092730612 Quality Assurance, Structural Concrete Activities, and Structural Steel and Support Activities 2009004 ML093511013 Electrical Components and Systems 2009006 ML092820188 Quality Assurance (SBM) 2009007 ML100271177 Quality Assurance (SBM) 2010001 ML101810503 Quality Assurance, Geotechnical and Foundation Activities, Structural Concrete Activities, Structural Steel and Support Activities, and Instrumentation and Control Systems 2010002 ML102700390 Quality Assurance (SBM), Geotechnical and Foundation Activities (SBM-1003), Structural Concrete Activities (SBM-1001 and SBM-1003), and Mechanical Components (Cascades 5 and 6) 2010003 ML103510562 Quality Assurance, 10 CFR Part 21-Facility Construction, and Structural Concrete Activities (SBM-1001) 2010004 ML110130336 Maintenance Observations (Cascade 2) 2010005 ML100850424 Quality Assurance, Electrical Components and Systems (SBM-1001),

Geotechnical and Foundation Activities (SBM-1001), Structural Concrete Activities (SBM-1001), and Structural Concrete Activities (SBM-1001) 2010007 ML100900329 Quality Assurance (SBM-1001), Mechanical Components (SBM-1001)

2 Report Number ADAMS Accession Number Inspection Area(s) 2010008 ML101170813 Quality Assurance (SBM-1001, Cascade 1) 2010009 ML101300087 Reactive inspection to evaluate the Commercial Grade Dedication Program 2010010 ML101480080 Quality Assurance (Cascades 2 and 3 in SBM-1001) 2010012 ML102020385 Quality Assurance (Cascades 2 and 3 in SBM-1001) 2010013 ML102320298 Quality Assurance (Cascades 3 in SBM-1001) 2010015 ML103560272 Quality Assurance (Cascades 1,2, and 3), Geotechnical and Foundation Activities (SBM-1003), Structural Concrete Activities (SBM-1003),

Mechanical Components (Cascade 3), and Electrical Components and Systems (Assay Line 2) 2011002 ML111190268 Quality Assurance (SBM-1003 and SBM-1001 Extension), Structural Steel and Supports Activities (SBM-1003), and Mechanical Components 2011003 ML112070634 Quality Assurance (Assay 2) 2011004 ML11301A218 Quality Assurance, Structural Concrete Activities (SBM 1003) and Instrumentation and Control Systems 2011005 ML12030A239 Quality Assurance, Safety Function Interfaces and 10 CFR Part 21 Inspection - Facility Construction 2011006 ML11090A037 Quality Assurance (Cascade 3, SBM-1001) Mechanical Components (Cascade 3) 2011008 ML111660886 Quality Assurance (Cascade 4 in SBM-1001) and Mechanical Components (Cascade 4) 2011009 ML11342A131 Quality Assurance (Cascades 1.5 and 1.6 in SBM-1001), Structural Concrete Activities (SBM-1003), and Mechanical Components (Cascades 1.5, 1.6, 1.7, 1.8, 2.1, and 2.5) 2011011 ML11263A098 Quality Assurance (Cascades 3 and 4) 2011012 ML113410075 Quality Assurance (Cascades 1.7 and 1.8) and Mechanical Components (Cascades 1.7, 1.8, 2.1, 2.2, 2.3, and 2.4) 2011013 ML12025A286 Quality Assurance (Cascade 1.6 and 1.7 in SBM-1001) and Structural Steel Welding and Mechanical Components (Cascades 1.7 and 1.8) 2012002 ML12121A579 Safety Operations (Review of Item Relied on for Safety (IROFS) C23 for Cascade 1.8, and 2.1 thru 2.8) and Construction (Cascade 1.7) 2012003 ML12188A105 Safety Operations (Review of IROFS C23 for Cascade 1.9, 1.10 and 1.11) and Geotechnical/Foundation (SBM-1003) 2012004 ML12304A009 Safety Operations (IROFS C23 Review for TC 21 centrifuges in Cascade 3.1) and Structural Steel (SBM-1003) 2012005 ML13030A027 Quality Assurance and Safety Operations (IROFS C23 Review for Cascades 3.3, 3.4, 3.5, and 3.6) 2013002 ML13116A175 Safety Operations (IROFS C23 Review of TC 12 for Cascades 1.1 through 1.7), Safety Operations (IROFS C23 Review of TC 21 for Cascades 3.7, 3.8, and 3.9), and Geotechnical Foundation (SBM-1005) 2013003 ML13210A291 Safety Operations (IROFS C23 Review of TC 21 for Cascades 3.10, 3.11, 3.12, and 4.1) and Structural Concrete (SBM-1005) 2013004 ML13305A074 Safety Operations (IROFS C23 Review of TC 21 for Cascades 4.2, 4.3 and 4.5)

3 Report Number ADAMS Accession Number Inspection Area(s) 2013005 ML14031A285 Safety Operations (IROFS C23 Review of TC 21 for Cascades 4.6, 4.7 and 4.8), Structural Concrete (SBM-1005), and Structural Steel and Support Activities (SBM-1005) 2013006 ML13214A141 Quality Assurance (SBM-1005) and Safety Function Interfaces (SBM-1005) 2014002 ML14115A022 Safety Operations (IROFS C23 Review of TC 21 for Cascades 4.9, 4.10, and 4.11) 2014003 ML14202A003 Safety Operations (IROFS C23 Review of TC 21 for Cascade 4.12) 2014005 ML15029A031 Quality Assurance (SBM-1005) and Safety Operations (Operational Readiness Review for SBM-1005) 2015002 ML15111A280 Plant Operations of SBM-1005 and Safety Operations (IROFS C23 Review of TC 21 for Cascades 5.1 through 5.4) 2015003 ML15210A003 Safety Operations (IROFS C23 Review of TC 21 for Cascades 5.5 through 5.8) 2015004 ML15301A020 Safety Operations (IROFS C23 Review of TC 21 for Cascades 5.9, 5.10, and 6.1) 2015006 ML15058A712 Structural Concrete Activities (SBM-1005) 2017002 ML17115A005 Safety Operations (IROFS C23 Review of TC 21 for Cascade 5.12) 2018003 Pending Safety Operations (IROFS C23 Review of TC 21 for Cascades 6.3 and 6.4)