NRC Security Inspection Report 05000416/2018404
ML19007A243
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/07/2019
From: David Holman
Plant Support Branch-1
To: Emily Larson
Entergy Operations
References
IR 2018404
Download: ML19007A243 (8)


Text

January 7, 2019

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000416/2018404

Dear Mr. Larson:

On November 26, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Grand Gulf Nuclear Station, Unit 1. The NRC inspectors discussed the results of this inspection with Mr. Greg Hawkins, Director Regulatory and Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

David A. Holman, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No.: 50-416 License No.: NPF-29

Enclosure:

Inspection Report 05000416/2018404

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000416

License Number:

NPF-29

Report Number:

05000416/2018404

Enterprise Identifier: I-2018-404-0003

Licensee:

Entergy Operations, Inc.

Facility:

Grand Gulf Nuclear Station, Unit 1

Location:

Port Gibson, Mississippi

Inspection Dates:

October 15, 2018 to November 26, 2018

Inspectors:

M. Chambers, Physical Security Inspector

C. Jewett, Physical Security Inspector

N. Day, Resident Inspector

Approved By:

David A. Holman

Chief, Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security inspection at Grand Gulf Nuclear Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

Additional Tracking Items

No Additional Items

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security testing and maintenance program. The following elements were evaluated:

Tier I: all requirements Tier II: all requirements Tier III: all requirements

71130.07 - Security Training

The inspectors evaluated the nuclear security training program. The following elements were evaluated:

Tier I: all requirements Tier II: all requirements Tier III: all 5 requirements except 2.14

71130.14 - Power Reactor Target Sets

The inspectors evaluated the power reactor target set program. The following elements were evaluated:

All requirements

EXIT MEETINGS AND DEBRIEFS

On October 18, 2018, the inspectors presented the Equipment, Testing and Maintenance and Security Training inspection results to Mr. Greg Hawkins, director Regulatory and Performance Improvement, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On November 26, 2018, the inspectors presented the Power Reactor Target Set inspection results to Mr. Greg Hawkins, director Regulatory and Performance Improvement Director, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71130.04 - Equipment Performance, Testing, and Maintenance

Condition Reports

2018-06686

2018-05980

2018-06863

2018-10399

2018-10400

2018-10401

2018-11374

2016-00792

Procedures

Number

Title

Revision

or Date

07-S-22-C83-1

Mag Switch Tamper Alarms

004

EN-NS-200

Security Reporting Requirements

013

EN-NS-210

Security Impact Review Program

010

EN-NS-212

Weapons Maintenance Accountability Program

005

EN-NS-214

Managing the Safety/Security Interface

004

EN-NS-220

Camera Controls for Access and Use

009

EN-NS-224

SOCA Access Controls

2

EN-NS-227

Security Department Challenge Testing

2

EN-NS-230

Security Equipment Accountability

000

EN-NS-231

Primary Access Control

001

ENS-NS-213

Use and Maintenance of Security Respiratory Protection

Equipment

000

11-S-01-4

Weapons Accountability, Issuance, and Use

033

11-S-11-2

Security Lock & Key Program

019

01-S-11-10

GGNS Employees Security Responsibilities

055

11-S-21-5

Operation and Use of Search Equipment

010

11-S-22-8

Security Equipment Testing, Inspection and

Maintenance

036

11-S-22-4

Intrusion Detection, Surveillance, and Access Control

Equipment

016

11-S-51-3

Personnel, Package, and Vehicle Searches

036

11-S-51-4

Duties of Personnel At the Primary Access Point

019

11-S-51-5

Duties of CAS/SAS Personnel

27

11-S-31-1

Telephone, Intercom and Radio Use, Maintenance and

Control

016

04-1-03-L62-1

Inverter Transfer Functional Test

2

Miscellaneous

Documents

Number

Title

Revision

or Date

Security Events Log

February 2018-

October 2018

Smart Sample of Intrusion Alarm Testing Records

September 2018

Weapons Maintenance and Accountability Records

January 2017 -

October 2018

Vendor Manual 460004253, Walk Through

Explosives Detector

ES4

Weekly Maintenance of Explosive Detector Devices

ES4

Monthly Maintenance of Explosive Detector Devices

SECFM 127A.6

Zone/Equipment Testing Schedule

October, 2018

SECFM 139

Weapons and Ammunition Supplement for R(SAS)

Corrective Action WT-GGN-2014-00224

QA-16-2016-

GGNS-1

Security Audit, Grand Gulf Nuclear Station

October 2016

QA-16-2017-

GGNS-1

Security Audit, Grand Gulf Nuclear Station

October 2017

9100 246-4VE

Rapiscan Metor 200HS Installation and Operating

Manual

2.21

LO-GLO-2017-

00048

Focused Self-Assessment on Security Equipment

Performance, Testing and Maintenance

August, 24, 2018

Installation Acceptance Testing for the Admin Wall

Cameras

August, 2, 2018

71130.07 - Security Training

Condition Reports

2017-10506

2018-07136

2018-08328

2018-09710

2018-10244

2018-10245

2018-10278

2018-11337

2018-11339

2018-11341

Procedures

Number

Title

Revision

or Date

EN-NS-300

Security Training Program

EN-NS-301

Security Systematic Approach to Training (SAT)

Process

EN-NS-303

Security Training Oversight Program

EN-NS-304

Security OJT, TPE, and Training Exemptions

EN-NS-304

Security OJT, TPE, and Training Exemptions

Miscellaneous

Documents

Number

Title

Revision

or Date

GJPM-SEC-7.0

Perform Vehicle/Material Escort Functions

GJPM-SEC-10.0

Communicate with Duress System

GJPM-SEC-12.0

Test Intrusion Detection Equipment and Special

Purpose Detectors

GLP-SECI-

PATROL

Patrol and Alarm Response

GLP-SEC-

DFORCE

Use of Force Training

GOJT-ST-SST07

GGNS Security Annual Exams A and B

LO-GLO-2017-

00047

Focused Self-Assessment on Security Training

August 2018

NA

GGNS Tactical Course of Fire

October 2018

NA

Lowlight Semi-Automatic Handgun Qualification

December 2017

NA

Lowlight Semi-Automatic Rifle Qualification

May 2018

NA

Semi-Automatic Rifle Daylight Qualification

May 2017

NA

Semi-Automatic Daylight Handgun Qualification

May 2018

NA

Semi-Automatic Rifle Thermal Optic Qualification

May 2017

QA-16-2016-

GGNS-1

Security Audit

October 2016

QA-16-2017-

GGNS-1

Security Audit

October 2017

71130.14 - Power Reactor Target Sets

Condition Reports

201812308

201811027

201605797

Procedures

Number

Title

Revision

or Date

EN-NS-306

Development and Maintenance of Target Sets

ML19007A243

SUNSI Review: ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: MLC Yes No

Publicly Available Sensitive

OFFICE

PSI:PSB1

PSI:PSB1

PBC

C:PSB1

C:PBC

C:PSB1

NAME

MChambers

CJewett

NDay

DHolman

JKozal

DHolman

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

2/04/18

2/04/18

2/17/18

2/20/18

1/03/19

1/07/19