MONTHYEARML20244A6451979-05-22022 May 1979 Requests Change to Tech Spec,App a to Ol,Modifying Surveillance Requirement 4.9.D Due to Incorporation of Redundant Breaker on Output of Reactor Protection Sys Motor Generator Sets Project stage: Other ML19274F0331979-06-0404 June 1979 Forwards Addl Info Re Trip Setpoints,Time Delay & Alternate Power Supply,Requested at 790110 NRC Meeting of NRC & Util in Bethesda,Md Project stage: Meeting ML19225B0111979-06-19019 June 1979 Summary of 790613 Meeting W/Util in Bethesda,Md Re Proposed Instrumentation on Changes to Be Completed Prior to Cycle 4 Operation Project stage: Meeting ML19224D0331979-06-25025 June 1979 Summarizes Actions Taken Re Alternate Power Supply to Reactor Protection Sys,In Light of NRC 790613 Meeting. Installation of Protective Breakers on Alternate Power Supply Cannot Be Assured by End of Refueling Outage Project stage: Meeting ML19207C2451979-08-0606 August 1979 Forwards Effluent Monitoring Results for Jan-June 1979 for License SNM-1168 Project stage: Other ML20008D8941980-10-15015 October 1980 Proposed Tech Specs 4.9,3.8 & 4.8 Re Reactor Protection Sys Electric Power Monitoring for Unit 1 & Operability & Surveillance of Ac Distribution Sys for Unit 2.Proposed Fee Determination Encl Project stage: Other ML20008D8761980-10-15015 October 1980 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Reactor Protection Sys Electric Power Monitoring for Unit 1 & Operability & Surveillance of Ac Distribution Sys Unit 2.Class III Fee Encl Project stage: Request ML19339C4701980-11-11011 November 1980 Responds to Verbal Requests for Info Re Reactor Protection Sys Motor Generator Set Power Monitoring Sys.Logic Is of Same Design Previously Reviewed on Unit 1.Collection of Data Re Setpoint Drift Underway Project stage: Other ML19350B0371981-03-0606 March 1981 Amend 23 to License NPF-5,adding Limiting Conditions for Operation & Surveillance Requirements for Sys Monitoring Output of Power Supply for Reactor Protection Sys Project stage: Other ML19350B0421981-03-0606 March 1981 Notice of Issuance & Availability of Amend 23 to License NPF-5 Project stage: Other ML19350B0411981-03-0606 March 1981 Safety Evaluation Supporting Amend 23 to License NPF-5 Project stage: Approval 1979-06-04
[Table View] |
Text
.,.
Babcock &Wilcox eo.e,ceme,Ena,ou, P.O. Box 1260, Lynchburg, Va. 24505 Telephone: (804) 384-5111 August 6, 1979 s
G
f'EIV
\\
b z,
Director, Inspection and Enforcement 2
UOl
% 0 ;079 L
United States Nuclear Regplatory Commission
{
3h^/
4
,C Washington, D. C.
20555
~_
SUBJECT:
Effluent Report
- ~
'~
Reference:
SNM-1168, Docket 70-1701 Gentlemen:
In accord with the nrovisions of 10 CFR 70.59, we are transmitting the following effluent monitoring results for the first six months of 1979.
Sincerely, 3ABC0CK S WILCOX COMPANY COSMERCIAL NUCLEAR FUEL PLANT
$"Y W. Zeff, Ma e r f
Safety, Licensibg, and Safeguards DWZ: cum Attachment b-fD T
9 DOCKETED
'O g
USN,1C AUG 10 ',979 > 3^
,j y{.
s I/
MAIL SECTIOTI /<s N:::s g
DOCKET CLERK
!)3CllG1
\\
~('
'l-l[7 rr_
13743 790910057f
/
Babcock &\\Nilcox Attachnent Gaseous Effluent January 1979 through June 1979 Quantity Nuclid?s pCi U-234 6.73E+02
.U-235 3.00E+01 U-236 3.03E+00 U-238 1.57E+02 Liquid Effluent Januaiy'1979 through June 1979 Quantity Nuclides pCi U-234 2.83E+00 U-235 1.26E-01 U-236 1.28E-02 U-238 6.63E-01 D. W. Icff Babcock 5 Wilcox Company Commercial Nuclear Fuel Plant August 6, 1979 SNM-1168, Docket 70-1201