NRC Security Baseline Inspection Report 05000315/2019410 and 05000316/2019410 (DRS-M.Ziolkowski)
ML19227A339
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/15/2019
From: Diana Betancourt-Roldan
Plant Support Branch II
To: Gebbie J
Indiana Michigan Power Co
References
IR 2019410
Download: ML19227A339 (8)


Text

August 15, 2019

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2NRC SECURITY BASELINE INSPECTION REPORT 05000315/2019410 AND 05000316/2019410

Dear Mr. Gebbie:

On July 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. S. Lies and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2019410 and 05000316/2019410

Enterprise Identifier: I-2019-410-0048

Licensee:

Indiana Michigan Power Company Nuclear Generation Group

Facility:

Donald C. Cook Nuclear Power Plant, Units 1 and 2

Location:

Bridgman, MI

Inspection Dates:

June 3, 2019, to July 12, 2019

Inspector:

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Diana Betancourt-Roldan, Acting Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more-than-minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the security access control program. The following elements were

===evaluated from this IP.

Access Control===

(1)

  • Tier I: All
  • Tier II: 02.06 (a, c-d), 02.07, 02.08 (d-f, I)
  • Tier III: 02.09

71130.06 - Protection of Safeguards Information

The inspector evaluated the safeguards information protection program. The following elements were evaluated from this IP:

Protection of Safeguards Information (1 Sample)

(1)

  • Tier I: All
  • Tier II: 02.04.b, 02.05 (a-b), 02.07.c
  • Tier III: 02.08, 02.09 (a-b)

71130.07 - Security Training

The inspector evaluated the nuclear Security Training Program. The following elements were

===evaluated from this IP.

Security Training===

(1)

  • Tier I: All
  • Tier II: 02.05 (a-b), 02.06b, 02.09 (a-b)
  • Tier III: 02.12 (a-b), 02.13 (a-c)

===71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)

(10.01/2018 - 3/30/2019)

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On July 11, 2019, the inspector presented the security baseline inspection results to Mr. S. Lies and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

PMP-2060-

SEC-006

Security Requirements for Plant

Personnel

SPP-2060-

SFI-209

Protected Area Access/Exit

Requirements

SPP-2060-

SFI-214

Security Core, Key and Lock

Program

71130.06

Miscellaneous

Safeguards Information Access

List

06/24/2019

Procedures

DTG-SPS-

073

SGI Retained Memory

Verification

PMP-2030-

SIC-001

Protection of Nuclear Security

Documents/Records

Self-

Assessments

2019-4198-1

NRC Inspection Quick Hit Self

Assessment - Protection of

Safeguards Information

71130.07

Corrective

Action

Documents

Resulting from

Inspection

AR 2019-

6417

TAC Fire Basis Document

06/26/2019

Miscellaneous

National Rifle Association

Endorsement - Tactical

Qualification Course

2/07/2017

Procedures

DTG-SPS-

066

Practical Physical Fitness Test

SE-C-AR018

Suspected Tampering

SE-C-AR028

Deadly Force

SE-C-AR049

Response Activities

SE-C-AR063

Bomb Threats and Search

SE-Q-

FOF01-1

(Initial)

Force-on-Force 40 Hr.

Qualification Card

SE-Q-

FOF01-2

Force-on-Force 40 Hr.

Qualification Card

SPP-2060-

SFI-105

Site Protective Services Security

Organization and

Responsibilities

TPD-600-

SEC

Security Training Program

Description

Self-

Assessments

GT 2018-

10514

NRC Inspection Quick Hit Self

Assessment - Security Training

0