ML19282B980
| ML19282B980 | |
| Person / Time | |
|---|---|
| Site: | 05000471 |
| Issue date: | 03/14/1979 |
| From: | Heinemann J FEDERAL ENERGY REGULATORY COMMISSION |
| To: | Regan W Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7903190200 | |
| Download: ML19282B980 (1) | |
Text
FEDERAL ENERGY REGULATORY COMMISSION WAS H INGTON, D.C.
20426 IN REPLY REFER TO:
March 14, 1979 Mr. William H. Regan Division of Site Safety and Environmental Analysis Nuclear Regulatory Coninissior Washington, D. C. 20555
Dear Mr. Regan:
I am replying to your request of February 28, 1979 to the Federal Energy Regulatory Commission for conments on the Draft Environmental Impact Statement for the Pilgrim Nuclear Power Station, Unit 2.
This Draft EIS has been reviewed by appropriate FERC staff components upon whose evaluation this response is based.
The staff concentrates its review of other agencies' environmental impact statements basically on those areas of the electric power, natural gas, and oil pipeline industries for which the Commission has jurisdiction by law, or where staff has special expertise in evaluating environmental impacts involved with the proposed action.
It does not appear that there would be any significant impacts in these areas of concern nor serious conflicts with this agency's responsibilities should this action be undertaken.
Please note that on page 1 of the DEIS, the unit (Fahrenheit or Centigrade) of the cooling water to be raised by 12 degrees after passing through the condenser was not given.
Also, it is desirable to include a plan and location map of the selected site (Rock Point or Pilgrim) in the DEIS.
Thank you for the opportunity to review this statement.
Sincerely, (s
l n.ttjitw h e '
/dack$.Heinemann
%dvisor on Environmental Quality b
7903190200 L
D