Qualification Tests of Electric Cables, Field Splices, and Connections for Light-Water-Cooled Nuclear Power Plants (for Comment)
ML003740128
Person / Time
Issue date: 08/31/1977
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.131
Download: ML003740128 (4)


U.S. NUCLEAR REGULATORY COMMISSIONREGULATORY GUIDE OFFICE OF STANDARDS DEVELOPMENT REGULATORY GUIDE 1.131 QUALIFICATION TESTS OF ELECTRIC CABLES, FIELD SPLICES, AND CONNECTIONS FOR LIGHT-WATER-COOLED NUCLEAR POWER PLANTSA. INTRODUCTION Criterion III, "Design Control," of Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to 10 CFR Part 50, "Licensing of Production and Utilization Facilities," requires that, where a test program is used to verify the adequacy of a specific design feature, it include suitable qualification testing of a prototype unit under the most adverse design conditions. This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification testing of electric cables, field splices, and connections for service in light-water-cooled nuclear powe~r plants to ensure that the cables, field splices, and connections can perform their safety-related functions.' The fire test provisions of this guide dothe Insulated Conductors Committee of the Power Engineering Society of the Institute of Electrical and Electronics Engineers, Inc. (IEEE), approved by the IEEE Nuclear Power Engineering Committee, and subsequently approved by the IEEE Standards Board on February 28,1974. It was agooved as an ANSI standard, ANSI N41.10-1975 1hpril 30, 1975. The standard delineates proce e developing a program for qualificatio festingg cables, field splices, and It plements IEEE Std 323-1974, "IEEE St; ioualifying Class IE Equipment for N aear , enerating Stations," which describe as' re ements for equipment qualification. I d'td 23-1974 is endorsed, with certain Regulatory Guide 1.89, "Qualificati' C s IEE Equipment for Nuclear PowerAtlntLnot apply to quanttication for an installed contlgura- rtl' te-' IEEE Std 383-1974 was issued, tion. s ab atories and cable testing facilities exr% c difficulty in producing a consistent flame by using the burner and flame source B. DISCUSSION cedures specified in the standard. An IEEE task IE S 3e investigation into the problem was eventually IEEE Std 383-1974, "IEEE Standard for pe expanded to include an evaluation of various flame Test2 of Class IE Electric Cables, Field e sources to determine if the 70,000 Btu/hr flame Connections for Nuclear Power eera i source specified in the standard was correct for use in Stations,"3 was prepared by Working G p1 of fire qualification testing. The investigation found that inconsistencies in the flame source were traceable to 'Regulatory Guide 1.29, "Seismic Design Classification, provides the inadvertent use of incorrectly sized burners durguidance with regard to identifying electric cables, field splices, ing certain test and connections to which the desi rification requirements of Appendix B to 10 CFR Part 50 1 ..A 2As used in this regulatory guide' t alification test" and A series of tests to determine if the correct flame "type test" are synonymous. source had been selected was conducted, and the 3Copies may be obtain he I titute of Electrical and results, as evaluated by the IEEE task force and the Electronics Engineers, nited neering Center, 345 East 47th NRC staff, indicated no basis for changing the 70,000 Street, New York, 0017. Btu/hr. Investigation into fire testing is continuing by TORY GUIDES Comments should be sent to the Secretary of the Commission, US. Nuclear Regu Regulatory Guides a L d to describe and make available to the public methods latory Commission, Washington, D.C. 20555, Attention:' Docketing and Service acceptable to the NR q .of implementing specific parts of the Commission's Branc r e g u l a t i o n s , to d e l i n~ e a t e N l u e s u s e d b y t h e s t a f f i n e v a l u a t i n g s p e c i f i c p r o b l e m sT h g u d s u e i u d i n t e f l o n g e n b a d i v i n or postulated accidents, or provide guidance to applicants. Regulatory Guides The guides e issued in the following ten broad divisions are not substitutes for regulations, and compliance with them is not required. 1. Power Reactors 6. Products Methods and solutions different from those set out in the guides will be accept- 2. Research and Test Reactors 7. Transportation able if they provide a basis for the findings requisite to the issuance or continuance 3. Fuels and Materials Facilities 8. Occupational Health of a permit or license by the Commission. 4. Environmental and Sitina o Anti , .. ...MComments and suggestions for improvements in these guides are encouraged at all Materials and Plant Protection e times, and guides will be revised, as appropriate, to accommodate comments and Requests for single copies of issued guides which may be reproduced) or for place to reflect new information or experience. However, comments on this guide,if meet on an automatic distribution list for single copies of future guides in specific received within about two months after its issuance, will be particularly useful in divisions should be made in writing to the US. Nuclear Regulatory Commission, evaluating the need for an early revision. Washington, D.C. 20555, Attention: Director, Division of Document Control.August 1977 IEEE and NRC, and significant results will be incorporated in future revisions of this guid The flame tests covered by Section 2.5 of the standard provide a test primarily of the self-extinguishing tendency of the cable insulation material. These tests are conducted with cables in a specific configuration and subjected to a defined fire source. However, the fire resistance of cables may vary significantly under different environmental conditions, cable configurations, and fire sources. It should be recognized that the objective of the flame test is to provide guidance for the selection of fire-resistant cables rather than to establish the adequacy of the installation of cables in a nuclear power plant. Adequacy of cables as installed depends on many factors. Morever, the adequacy of the cable system as installed depends on other factors in addition to the properties of the cables. For example, cable separation criteria are delineated in Regulatory Guide 1.75, "Physical Independence of Electric Systems," and fire protection guidelines are delineated in Regulatory Guide 1.120, "Fire Protection Guidelines for Nuclear Power Plants." IEEE Std 383-1974 is concerned with cables both inside and outside the containment and establishes procedures for simulating operating conditions so that type testing will be adequate for the intended service conditions. It covers normal operating and design basis event conditions, except that the fire test is a reference configuration and flame rather than the design basis configuration and flam C. REGULATORY POSITION Conformance with the requirements of IEEE Std 383-1974, "IEEE Standard for Type Test of Class IE Electric Cables, Field Splices, and Connections for Nuclear Power Generating Stations," is acceptable for qualifying electric cables, field splices, and connections as components (Fite test provisions do not apply to qualification for an installed configuration) for service in light-water-cooled nuclear power plants to ensure that the cables, field splices, and connections can perform their safety-related function subject to the following: 1. In lieu of Section 1.3.4.2.3, "Other Design Basis Events," -the following should be used: "The remainder of the complete spectrum of design basis events (e.g., events such as a steam line break) shall be considered in case theyrepresent different types or more severe hazards to cable operation." 2. In lieu of Section 1.3.5.3, "Test Design Basis Event," the following should be used: ""Type tests for design basis event conditions shall consist of subjecting non-aged and aged cables, field splices, and connections to a se-quence of environmental extremes that simulate the most severe postulated conditions of a design basis event and specified conditions of installation. Type tests shall demonstrate margin by application of multiple transients, increased level, or other justifiable mean Satisfactory performance of the cable will be evaluated by electrical and physical measurements appropriate to the type of cable during or following the environmental cycle, or both. The factors for margin given in Section 6.3.1.5 of IEEE Std 323-1974 shall be used where applicabl "The values of pressure, temperature, radiation, chemical concentrations, humidity, and time in IEEE Std 323-1974 do not represent acceptable limits for all nuclear power station The user of this standard shall ensure that the values used in the required type tests represent acceptable limits for the service conditions in which the cable or connections will be installed." 3. In lieu of Section 2.1, "Introduction," the following should be used: "Type tests deqcribed in this document are methods that shall be used to qualify electrical cables, field splices, and connections for use in nuclear power generating stations. Tests of the cable or connection assembly, as applicable, shall then supplement the cable tests in order to qualify the connections and other aspects unique to planned usag "The values of pressure, temperature, radiation, chemical concentrations, humidity, and time indicated in IEEE Std 323-1974 do not represent acceptable limits for all nuclear power generating station "The user of this guide shall ensure that the values used in the required type tests represent acceptable limits for the service conditions in which the cable, or connections, or both, will be installe "Results of prior tests that are being used as the bases for the present tests shall be referenced in the documentation." 4. In lieu of Section 2.3.2, "Long-Term Physical Aging Properties," the following should be used: "Aging data shall be submitted to establish long-term performance of the insulation. Data may be evaluated using the Arrhenius technique. A minimum of 3 data points, including 136°C and two or more others at least 10°C apart in temperature, shall be use "If there is not sufficient evidence that accelerated aging techniques can reliably produce1.131-2I_

end-of-life conditions, the following ongoing qualification procedure should be used: "Ongoing Qualification Procedure-Some types of cables, field splices, and connections (hereafter referred to only as cables) may not respond in a representative manner to accelerated aging techniques to establish end-ofdesign-life conditions. Consequently, the qualified life would be less than the required design life. There are two suggested methods of achieving long-term (design life) qualification: (a) After a planned period less than the qualified life of the cable has been reached, representative cables should be replaced with new cables and the removed cables subjected to a qualification test similar to that performed prior to installation. This test should include additional accelerated aging. Successful completion of this test extends the qualified life of the installed cables. This procedure should be repeated until the qualified life equals or exceeds the required design life. (b) Additional identical cables should be installed in a nuclear power generating station location where power loading and service conditions equal or exceed those of the cable to be qualified. A cable should be removed after a planned period less than the previously qualified life and subjected to a qualification test similar to that performed prior to installation. This test should include accelerated aging. Successful completion of this test extends the qualified life of the installed cable. Sufficient additional identical cables should be initially installed in order that the above procedure can be repeated until the qualified life 'equals or exceeds the required design lif "If the above methods demonstrate that the qualified life is less than the design life, a periodic replacement plan should be instituted." 5. The radiological source term and exposure rate simulating LOCA conditions referred to in Section 2.4.2, "Radiation Exposure-Total," should be obtained from Regulatory Guide 1.89 rather than from IEEE Std 323-197 . In lieu of Section 2.5.1, "General," the following should be used: "This section describes the method for type testing of grouped cables via the vertical tray flame test to determine their relative selfextinguishing tendencies. Testing shall include both aged and unaged cable specimens." 7. In lieu of Section 2.5.2.2, the following should be used:"The fire test provisions of the standard are useful in screening out cable insulation materials that are inadequately selfextinguishing, but they shall not be construed as qualification of any installed cable system configuration. If field splices are to be used in cable trays, special provisions -shall be made to demonstrate that the fire retardant properties of the cable are not altered unacceptably in an adverse way by the field splice." 8. Section 2.5.4.2-Vertical tray configuration should be used and understood to mean perpendicular to the plane of the horizo . In lieu of Section 2.5.4.4, the following should be used: "The gas burner flame source shall consume propane gas so as to release approximately 70,000 Btu per hour at an air-gas ratio of 5 to Natural grade propane shall be used. The procedure detailed below shall be followed:" 10. In lieu of the first sentence of Section 2.5.4.4.1, the following should be used: "The ribbon gas burner' shall be mounted horizontally such that the flame impinges on the specimen midway between the tray rungs and so that the burner face is in front of and 4 inches from the cable and approximately 2 feet above the bottom of the tray." 11. In lieu of Section 2.5.4.4.3, the following should be used: "Flame size will normally be achieved when the propane flow is 27.8 standard ft3 per hour and the air flow is 139 standard ft' per hour." 12. Section 2.5.4.5 is not endorsed by this regulatory guid . The recommendations indicated by "should" and the options indicated by "may" in the sections of IEEE Std 383-1974 indicated below have sufficient importance to be treated the same as requirements of the standard: a. Section 1.3.1, "Cable Description" b. Section 1.3.2, "Field Splices or Connection Description" c. Section 1.3.4.1, "Meeting Service Conditions"; the first sentenc 'An American Gas Furnace Co. 10-in, 11-55 drilling, ribbon-type, catalog no. 10X 11-55 with an air-gaq Venturi mixer, catalog n (2 lbf/in2 max. gauge pressure) is the only presently available model that has been found satisfactory for purposes of these tests.1.131-3 d. Section 1.3.4.2.1, "Design Basis EventLOCA" e. Section 1.4.1, "General" f. Section 1.4.3, "Test Results" g. Section 1.4.4, "Test Evaluation" h. Section 2.2, "Type Test Samples" i. Section 2.3.3, "Thermal and Radiation Exposure" j. Section 2.3.3.3 k. Section 2.3.3.4 i. Section 2.4.3, "LOCA Simulation" m. Section 2.4.3.1 n. Section 2.4.3.2 o. Section 2.4.4, "Post LOCA Simulation Test" p. Section 2.5.2.1 q. Section 2.5.4.3 r. Section 2.5.4.4.2 s. Section 2.5.5, "Evaluation" t. Section 2.5.6, "Instrument Cable and Single Conductors from Multiconductor Assembly"; the recommendation that the tested cable pass aflame resistance test in accordance with ASTM D2220-6 . Section 3, "References," of IEEE Std 383-1974 lists additional applicable IEEE standards. The specific applicability or acceptability of these referenced standards has been or will be covered separately in other regulatory guides, where appropriat D. IMPLEMENTATION The purpose of this section is to provide information to applicants and licensees regarding the NRC staff's plans for utilizing this regulatory guid Except in those cases in which the applicant proposes an acceptable alternative method, the method described herein for complying with specified portions of the Commission's regulations will be used by the staff in evaluating all construction nermit applications docketed after May 1, 1978.UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555FIRST CLASS MAIL POSTAGE & FEES PAID USNRC PERMIT No. G-67OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $3001.131.4