ML19326B569
| ML19326B569 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/09/1976 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19326B558 | List: |
| References | |
| NUDOCS 8004160351 | |
| Download: ML19326B569 (2) | |
See also: IR 05000313/1976005
Text
.
. _ - _ _ -
-
- _ _ _ _ _ _ _ _ _ _ _ - -
.'
'O
-
-
. . .
..
' . ' ,
. ,'
IEFILE COPX
.
.
-
.
=
.
.
O ,_
UNITEo STATES
.
NUCLEAR REGULATORY CoMMISSloN
'
OFFICE of INSPECTloN ANo ENFORCEMENT
REGloN IV
)
611 RYAN PLAZA DRIVE, SUITE 1000
ARLINGTON, TEXAS 76012
April 9, 1976
-
Arkansas. Power and Light Company
Docket No. 50-313
ATTN:
Mr. J. D. Phillips
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
Gentlemen:
This refers to the inspections conducted by Messrs. D. G. Anderson,
E. H. Johnson, and R. Smith of this office on March 23-25, 1976, of
activities authorized by NRC Operating License No. DPR-51 for the
Arkansas Nuclear One, Unit 1 facility, and to the discussion of our
\\
.
findings held with Mr. J. W. Anderson and other members of your staff
'
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
>
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities were
not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Enclosure (1). This
noi: ice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you, and the
results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be
achieved.
,
.
.
s
j
i
'
800416o.95[
.
- -
-
-.
- - - . .
. . , - . . - , - - , , _ . . ,
-
, - - - , . -
-
,. ,
..
,-
.
.
.
.
..
..
..
.,
,
,
.
. . .
,
.
.
.
-
V
.
Arkansas Power & Light Company
-2-
April 9, 1976
Also based on the results of this inspection, it appears that one of
your activities was not conducted in accordance with your FSAR commitment
to the Commission, as set forth in Section V of the summary of the
enclosed report. You are requested to submit to this office within 20
days of your receipt of this notice, a written statement in reply includ-
ing:
(1) actions which you plan to take to satisfy your FSAR co=mitment;
and (2) the date when the above actions will be complete.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you or your contractors
,
believe to be proprietary, it is necessary that you make a written applica-
tion within 20 days to this office to withhold such information from
public disclosure. Any such application must include a full statement of
the reasons on the basis of which it is claimed that the information is
proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
s
period, the report will be placed in the Public Docur.ent Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
!
N "Y
/
,
G. L. Madsen, Chief,
Reactor Operacions and
Nuclear Support Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
IE Inspection Report No. 50-313/76-05
bec:
.
/
IE Chief, FC&EB
f
II Chief, APD
f
IE Chief, TAB
PDR:HQ
l
II:IV Reg. Coord.
Local PDR
/
II Files'
Arkansas State Board of Health /
Central Files
'
Standards Development
DEL (12)
._- -.
-
.
_ _ _ . .
- . .
-.
- -
- . _ .
.
-
..-