Regulatory Guide 1.188
| ML052200165 | |
| Person / Time | |
|---|---|
| Issue date: | 08/08/2005 |
| From: | Garrity P A NRC/RES/PMPDAS |
| To: | |
| jxd | |
| References | |
| DG-1140 RG-1.188, Rev 1 | |
| Download: ML052200165 (10) | |
The U.S. Nuclear Regulatory Commission (NRC) issues regulatory guides to describe and make available to the public methods that the NRC staff considers acceptable foruse in implementing specific parts of the agency's regulations, techniques that the staff uses in evaluating specific problems or postulated accidents, and data that the staff needin reviewing applications for permits and license Regulatory guides are not substitutes for regulations, and compliance with them is not require Methods and solutions thatdiffer from those set forth in regulatory guides will be deemed acceptable if they provide a basis for the findings required for the issuance or continuance of a permit or licenseby the Commission.This guide was issued after consideration of comments received from the publi The NRC staff encourages and welcomes comments and suggestions in connection withimprovements to published regulatory guides, as well as items for inclusion in regulatory guides that are currently being develope The NRC staff will revise existing guides,as appropriate, to accommodate comments and to reflect new information or experienc Written comments may be submitted to the Rules and Directives Branch,Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.Regulatory guides are issued in 10 broad divisions: 1, Power Reactors; 2, Research and Test Reactors; 3, Fuels and Materials Facilities; 4, Environmental and Siting; 5, Materialsand Plant Protection; 6, Products; 7, Transportation; 8, Occupational Health; 9, Antitrust and Financial Review; and 10, General.Requests for single copies of draft or active regulatory guides (which may be reproduced) should be made to the U.S. Nuclear Regulatory Commission, Washington, DC 20555,Attention: Reproduction and Distribution Services Section, or by fax to (301) 415-2289; or by email to Distribution@nrc.go Electronic copies of this guide and other recentlyissued guides are available through the NRC's public Web site under the Regulatory Guides document collection of the NRC's Electronic Reading Roomat http://www.nrc.gov/reading-rm/doc-collections/ and through the NRC's Agencywide Documents Access and Management System (ADAMS)at http://www.nrc.gov/reading-rm/adams.html, under Accession No. ML05073028 Note, however, that the NRC has temporarily limited public access to ADAMS so that theagency can complete security reviews of publicly available documents and remove potentially sensitive informatio Please check the NRC's Web site for updates concerningthe resumption of public access to ADAMS.U.S. NUCLEAR REGULATORY COMMISSIONRevision 1August 2005REGULATORY GUIDEOFFICE OF NUCLEAR REGULATORY RESEARCH PrepublicationREGULATORY GUIDE 1.188(Draft was issued as DG-1140, dated January 2005)STANDARD FORMAT AND CONTENTFOR APPLICATIONS TO RENEWNUCLEAR POWER PLANT OPERATING LICENSES INTRODUCTIONThe issuance of renewed operating licenses for nuclear power plants is governed by Title 10, Part 54,of the Code of Federal Regulations (10 CFR Part 54), "Requirements for Renewal of Operating Licensesfor Nuclear Power Plants" (commonly known as the license renewal rule). As such, 10 CFR Part 54 specifiesthe information that a nuclear power plant applicant must include as part of an application to renew an operating licenseissued by the U.S. Nuclear Regulatory Commission (NRC). As discussed in this regulatory guide, the applicationshould include (1) general information, (2) an integrated plant assessment (IPA), (3) an evaluation of time-limitedaging analyses (TLAAs), (4) a supplement to the plant's final safety analysis report (FSAR), (5) any necessary changesto the plant's technical specifications (along with related justifications), and (6) a supplement to the plant'senvironmental repor The FSAR supplement should provide a summary description of the programs and activitiesthat the applicant will use to manage the effects of aging for the period of extended operation, which is determinedby the IPA and the evaluation of TLAAs.The following general provisions, with the corresponding regulations, apply to filing an applicationfor a renewed operating license:*The application must be filed in accordance with Subpart A of 10 CFR Part 2, 10 CFR 50.4,and 10 CFR 50.3 [10 CFR 54.17(a)]*The applicant may not submit the application to the Commission earlier than 20 years before the expirationof the operating license currently in effec [10 CFR 54.17(c)]
1Regulatory issue summaries are available through the NRC's public Web siteat http://www.nrc.gov/reading-rm/doc-collections/gen-comm/reg-issues/.RG 1.188, Rev. 1, Page 2*For the timely renewal provisions of 10 CFR 2.109(b) to apply, the applicant must file a sufficientapplication at least 5 years prior to the expiration of the existing licens [10 CFR 2.109(b)]*The application for a renewed license may be combined with applications for other kindsof license [10 CFR 54.17(d)]*The application may incorporate by reference information contained in previous applicationsfor licenses or license amendments, statements, correspondence, or reports filed withthe Commission, provided that the references are clear and specifi [10 CFR 54.17(e)]This regulatory guide applies to license renewal applications or portions thereo The requirementsfor filing a license renewal application are specified in 10 CFR 54.1 Applicants may submit theirlicense renewal applications to the NRC in either paper format or electronically, as described inRegulatory Issue Summary (RIS)01-005, "Guidance on Submitting Documents to the NRC by ElectronicInformation Exchange or on CD-ROM."1 The RIS provides general guidance on acceptable formatsfor electronic submittals and references detailed instructions, which are available through the NRC'spublic Web site at http://www.nrc.gov/site-help/eie.html.This regulatory guide contains information collections that are covered by the requirementsof 10 CFR Part 54, which the Office of Management and Budget (OMB) approved under OMB controlnumber 3150-015 The NRC may neither conduct nor sponsor, and a person is not required to respondto, an information collection request or requirement unless the requesting document displays a currentlyvalid OMB control numbe Copies are available at current rates from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC20402-9328 (telephone (202) 512-1800); or from the National Technical Information Service at 5285 Port Royal Road,Springfield, VA 22161; http://www.ntis.gov; or (703) 487-465 Copies are available for inspection or copyingfor a fee from the NRC's Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing addressis USNRC PDR, Washington, DC 20555; telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; or emailPDR@nrc.go These documents are also available electronically through the NRC's public Web site athttp://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/.3Copies are available for inspection or copying for a fee from the NRC's Public Document Room at 11555 RockvillePike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone (301) 415-4737or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.go Revision 5 of NEI 95-10 is also available through theNRC's license renewal Web page at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html#nuclear,and through the NRC's Agencywide Documents Access and Management System (ADAMS)at http://www.nrc.gov/reading-rm/adams.html, under Accession No. ML05028011 Note, however, that the NRChas temporarily limited public access to ADAMS so that the agency can complete security reviews of publicly availabledocuments and remove potentially sensitive informatio Please check the NRC's Web site for updates concerningthe resumption of public access to ADAMS.RG 1.188, Rev. 1, Page 3 DISCUSSIONThis revised guide provides guidance on the information that applicants must submit in theirapplications for renewal of nuclear power plant operating licenses, as well as the uniform formatthat the NRC staff considers acceptable for structuring and presenting the required information. Conformance with this guide is not required, but its use facilitates both an applicant's preparationof a license renewal application and the NRC staff's timely and consistent revie The NRC staff willconsider different formats if they provide an adequate basis for approval of the application for license renewal.The NRC initially issued Regulatory Guide 1.188 in July 2001, after soliciting and resolvingpublic comments on three draft regulatory guides (DG-1104 in August 2000, DG-1047 in August 1996,and DG-1009 in December 1990). As such, Regulatory Guide 1.188 incorporated lessons learned fromthe review of license renewal applications and Owners Group topical report The guide alsoincorporated relevant information from the development of the "Standard Review Plan for the Reviewof License Renewal Applications for Nuclear Power Plants" (SRP-LR) (NUREG-1800),2and "Generic Aging Lessons Learned (GALL) Report" (NUREG-1801),2 as well as a summary ofpublic comments received on those documents (NUREG-1832, "Analysis of Public Comments on theRevised License Renewal Guidance Documents."2)Since the NRC initially published Regulatory Guide 1.188 in July 2001, the staff proposed to updateboth the SRP-LR (NUREG-1800) and GALL Report (NUREG-1801) based on experience gained fromnumerous license renewal application reviews and other insights identified by industr Consequently,the staff also decided to revise Regulatory Guide 1.188 to reflect the proposed updates to the guidancedocument Toward that end, the staff prepared DG-1140, in which the NRC endorsed (with two exceptions)Revision 5 of NEI 95-10, "Industry Guidelines for Implementing the Requirements of 10 CFR Part 54 -The License Renewal Rule," which the Nuclear Energy Institute (NEI) published in January 2005.3 Specifically, the staff took exception to the use of a portion of Appendix F to Revision 5 of NEI 95-10,from the unnumbered paragraph following paragraph 4.4 through the end of Section 4, "Non-Safety SSCsDirectly Connected to Safety-Related SSCs." In addition, the NRC staff took exception to the useof paragraph 5.2.3.1, "Exposure Duration."
4Copies are available for inspection or copying for a fee from the NRC's Public Document Room at 11555 RockvillePike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone (301) 415-4737or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.go Revision 6 of NEI 95-10 is also availablethrough the NRC's Agencywide Documents Access and Management System (ADAMS)at http://www.nrc.gov/reading-rm/adams.html, under Accession No. ML05186040 Note, however, that the NRChas temporarily limited public access to ADAMS so that the agency can complete security reviews of publicly availabledocuments and remove potentially sensitive informatio Please check the NRC's Web site for updates concerningthe resumption of public access to ADAMS.5Copies are available at current rates from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC20402-9328 (telephone (202) 512-1800); or from the National Technical Information Service at 5285 Port Royal Road,Springfield, VA 22161; http://www.ntis.gov; or (703) 487-465 Copies are available for inspection or copyingfor a fee from the NRC's Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing addressis USNRC PDR, Washington, DC 20555; telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; or emailPDR@nrc.go These documents are also available electronically through the NRC's public Web site athttp://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/.RG 1.188, Rev. 1, Page 4Subsequently, in response to the exceptions stated in DG-1140, NEI issued Revision 6 of NEI 95-10in June 20054 to accept the NRC staff's position with respect to each of those issues, thereby renderingthe staff's two exceptions unnecessar Having reviewed this latest revision of NEI 95-10, the NRC stafffinds Revision 6 acceptable for use in implementing the license renewal rule, without exceptions,as discussed in this revised regulatory guid Applicants may meet the intent of the license renewal ruleusing methods other than those provided in Revision 6 of NEI 95-10; however, the NRC staffwill determine the acceptability of such methods on a case-by-case basi For additional informationconcerning the preparation of acceptable license renewal applications, applicants should refer tothe SRP-LR (NUREG-1800).5 RG 1.188, Rev. 1, Page 5 REGULATORY POSITIONThis section discusses the NRC staff's regulatory position on the standard format and contentof applications for renewal of operating licenses for commercial nuclear power plant As such,the guidance provided in this section is expected to ensure that applicants have identified and taken(or will take) actions to ensure plant safety throughout the period of extended operatio Specifically,such actions relate to (1) managing the effects of aging on the functionality of plant structures, systems,and components that the NRC staff has identified as requiring aging management, and (2) evaluatingTLAAs that the NRC staff has identified as requiring such revie Following this guidance providesreasonable assurance that the applicant will continue to conduct the activities authorized by the renewedlicenses, in accordance with the plant's current licensing basis (CLB).1.Contents of an ApplicationTo renew a nuclear power plant operating license, an applicant must meet the requirementsdelineated in 10 CFR Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants." This license renewal rule establishes the procedures, criteria, and standards governing renewalof an operating licens Figure 1 provides a summary of the contents of a license renewal application.The information that an applicant develops and submits or retains for license renewal should permitthe NRC staff to determine that the applicant has met the requirements of 10 CFR Part 5 The standardformat in which the applicant presents this information should allow optimum use of the applicant's resources,while facilitating the NRC staff's review of the license renewal applicatio As required by 10 CFR Part 54,an application shall consist of general information concerning both the applicant and the plant,technical information referenced or contained in the IPA and the evaluation of TLAAs, a supplementto the FSAR, any technical specification change(s) and their associated justification(s), and a supplementto the plant's environmental report.The technical information that an applicant submits should focus on identifying structures, systems,and components within the scope of 10 CFR Part 54, and on reviews of aging management, TLAAs,and the activities necessary to ensure that the applicant will maintain the plant's CLB throughout the periodof extended operatio The technical content of a license renewal application should be sufficient to allowNRC reviewers to understand (1) the methodologies used to determine the structures, systems,and components that are subject to aging management review, and (2) the actions taken (or to be taken)to manage the effects of aging during the period of extended operatio The NRC staff will reviewthese areas to (1) determine whether the methodology is acceptable and whether the lists of structures,systems, and components and TLAAs are comprehensive; (2) assess the effectiveness of actions taken(or to be taken) to manage aging during the period of extended operation; and (3) determine whetherTLAAs will remain valid for the period of extended operation or have been acceptably resolvedor dispositioned for the purposes of license renewal.The FSAR supplement should contain a summary description of the TLAA evaluationand the programs and activities that the applicant will use to managing the effects of agin The regulatorycontrols associated with placing a summary description of these evaluations and activities into the FSAR,along with the existing regulatory process, should ensure that future program changes that could decreasethe overall effectiveness of the TLAA evaluation and aging management activities will receiveappropriate review by the applican RG 1.188, Rev. 1, Page 6 6Single copies of regulatory guides, both active and draft, and draft NUREG documents may be obtained free of chargeby writing the Reproduction and Distribution Services, USNRC, Washington, DC 20555-0001, or by fax to(301) 415-2289, or by email to DISTRIBUTION@nrc.go Active guides may also be purchased from the NationalTechnical Information Service on a standing order basi Details on this service may be obtained by writing NTIS,5285 Port Royal Road, Springfield, VA 22161; telephone (703) 487-4650; online at http://www.ntis.go Copies ofactive and draft guides are also available for inspection or copying for a fee from the NRC's Public Document Roomat 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555;telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.gov.7Copies are available for inspection or copying for a fee from the NRC's Public Document Room at 11555 RockvillePike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone (301) 415-4737or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.go This document is also available through the NRC'sAgencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html,under Accession No. ML05186040 Note, however, that the NRC has temporarily limited public access to ADAMSso that the agency can complete security reviews of publicly available documents and remove potentially sensitiveinformatio Please check the NRC's Web site for updates concerning the resumption of public access to ADAMS.RG 1.188, Rev. 1, Page 7The license renewal application must also incorporate the general information required by10 CFR 54.17 and 54.1 This information should include any conforming changes to the indemnityagreement to account for the expiration term of the proposed renewed license [10 CFR 54.19(b)]and any restricted data agreements [10 CFR 54.17(f) and (g)]. In addition, the IPA, the TLAA evaluation,and/or the FSAR supplement should contain or reference the technical information required by10 CFR 54.21 and 54.22.The license renewal application should also include or reference any technical specification changesor additions that are necessary to manage the effects of aging during the period of extended operation. The applicant should identify technical specification changes or additions when additional regulatory controlis warranted to ensure that the applicant will manage the effects of aging, such that the necessary qualityof systems, structures, and components will continue to be maintained, facility operation will continueto be within safety limits, and limiting conditions for operation will continue to be me As such,the application should include justifications for the proposed changes or additions, and the justificationsmust comply with the requirements of 10 CFR Part 5 The NRC staff may also include conditionsor limitations on the renewed license, in accordance with 10 CFR 54.33(b), when the staff determinesthat additional regulatory control is warranted to ensure that the applicant will adequately managethe effects of aging.In addition, the applicant should provide environmental information in a supplement to the plant'senvironmental report, and such information must comply with the requirements of Subpart Aof 10 CFR Part 51, as required by 10 CFR 54.2 For additional guidance concerning the formatand content of the environmental report, applicants should refer to Supplement 1 to Regulatory Guide 4.2,"Preparation of Supplemental Environmental Reports for Applications To Renew Nuclear Power PlantOperating Licenses," dated September 2000.62.Endorsement of NEI GuidelinesRevision 6 of NEI 95-10, "Industry Guidelines for Implementing the Requirements of 10 CFR Part 54 -The License Renewal Rule," dated June 2005,7 provides methods that the NRC staff considers acceptablefor complying with the requirements of 10 CFR Part 54 for preparing a license renewal applicatio Regulatory issue summaries are available through the NRC's public Web siteat http://www.nrc.gov/reading-rm/doc-collections/gen-comm/reg-issues/.RG 1.188, Rev. 1, Page 83.Formatting SpecificationsThe filing requirements for a license renewal application are specified in 10 CFR 54.17. Applicants may submit applications to the NRC in electronic or paper format, as described in RIS 2001-05,"Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on CD-ROM."8 This guidance applies to license renewal applications or portions thereof.3.1Graphical PresentationsApplicants should employ graphical presentations (such as drawings, maps, diagrams, sketches,and tables) if such means may convey the information more adequately or convenientl In so doing,applicants should ensure that all information so presented is legible, symbols are defined, no essentialinformation is lost when colored drawings are printed in black on white paper, and scales are not reducedto the extent that visual aids are necessary to interpret pertinent informatio Such graphical presentationsshould appear in the section where they are primarily discusse References used may be citedeither as footnotes on the page where they are discussed, or as endnotes at the end of the chapterin which they are discussed.3.2Physical Specifications3.2.1Paper Size*Text pages: 81/2 x 11 inches.*Drawings and graphics: 81/2 x 11 inche A larger size is acceptable, provided that the finished copy,when folded, does not exceed 81/2 x 11 inches.3.2.2Paper Stock and InkUse suitable quality in substance, paper color, and ink density for handling and reproductionby microfilming or image-copying equipment.3.2.3Page MarginsMaintain a margin of no less than 1 inch on the top, bottom, and binding side of all pages submitted.3.2.4Printing*Composition: Text pages should be single-spaced.*Type Face and Style: Use type faces and styles that are suitable for reproductionby microfilming or image-copying equipment.*Reproduction: Copies may be mechanically or photographically reproduced. All text pages should be printed on both sides, with the image printed head-to-hea RG 1.188, Rev. 1, Page 93.2.5BindingPages should be punched for standard 3-hole looseleaf binders.3.2.6Page NumberingPages should be numbered with digits corresponding to the chapter and section, followed bya hypen and a sequential page number (e.g., the third page of Section 4.1 of Chapter 4 should benumbered 4.1-3). Do not number the entire report sequentially.3.2.7Table of ContentsProvide a table of contents and index of key terms for the renewal application.3.3Procedure for Updating or Revising PagesText and graphical presentations should be revised by providing replacement page The newor modified portion of each page should be highlighted by a "change indicator," consisting of a boldvertical line drawn in the margin opposite the binding margi The line should be of the same lengthas the new or modified portion of the page.All pages submitted to update, revise, or add pages to the report should show the date of the change,as well as the change or amendment numbe A guide page listing the pages to be inserted and pagesto be removed should accompany each submission of revised page In addition, when making majorchanges or additions, the applicant should provide a revised table of content RG 1.188, Rev. 1, Page 10 IMPLEMENTATIONThe purpose of this section is to provide information to applicants regarding the NRC staff's plansfor using this regulatory guid Except in those cases in which an applicant proposes or has previouslyestablished an acceptable alternative method for complying with specified portions of the NRC'sregulations, the methods described in this guide reflect public comments and will be used in evaluatingapplications to renew nuclear power plant operating licenses.REGULATORY ANALYSISThe NRC staff did not prepare a separate regulatory analysis for this regulatory guide. The regulatory analysis prepared for the final license renewal rule also provides the regulatory basisfor this guide and examines the costs and benefits of implementing the rul A copy of that regulatoryanalysis, "Nuclear Power Plant License Renewal - 10 CFR Part 54," dated February 1995, is availablefor inspection and copying for a fee at the NRC's Public Document Room, located at 11555 Rockville Pike,Rockville, Maryland.BACKFIT ANALYSISThis regulatory guide proposes NRC staff guidance on complying with the final license renewal rule,10 CFR Part 54, which became effective on June 7, 199 Accordingly, publication of this regulatory guidedoes not constitute a backfit under 10 CFR 50.109, and no backfit analysis is necessary or has been preparedfor this regulatory guide.