Forwards IE Insp Rept 50-271/81-01 on 810103-05.No Noncompliance Noted
ML20003C733
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/30/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20003C734 List:
References
NUDOCS 8103180092
Download: ML20003C733 (2)


See also: IR 05000271/1981001

Text

WW

.

.

M

4t

UNITED STATES

q

g

~*4

NUCLEAR REGULATORY COMMISSION

f

REClONI

  • * .

f

631 PARK AVENUE

E

s,

MING OF PRUS$l A. PENNSYLVANI A 39406

+...*

/h

Docket No. 50-271

/0/

NA

g",#eR[/h%

Vermont Yankee Nuclear Power Corporation

E4

'

'

/

% *6 %

c!

ATTN:

Mr. Robert L. Smith

~

&

/

Licensing Engineer

ekjg,d 's

{

1671 Worcester Road

M

'

Framingham, Massachusetts 01701

ODjp

h

Gentlemen:

Subject:

Inspection No. 50-271/81-01

-

This refers to the routine inspection conducted by Mr. S. D. Reynolds, Jr. of

this office on January 3-5, 1981, at Vermont Yankee Nuclear Power Station,

Vernon, Vermont of activities authorized by NRC License No. DPR-28 and to the

discussions of our findings held by Mr. S. D. Reynolds, Jr. with Mr. Warren

Murphy of your staff at the conclusion of the inspection.

.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your centractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affi; davit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

i

Section 2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

'

you in this regard within the specified period, the report will be placed in the

Public Document Room.

!

I

i-

L

8.10318009L

Q

.

r

L

.

.

Vermont Yankee Nuclear Power Corporation 2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

[/

w.

2

-

Robert . Carlson, blef

Reactor Constructica and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report No. 50-271/81-01

cc w/ enc 1:

Mr. Warren P. Murphy, Plant Superintendent

Mr. W. F. Conway, Vice President and Manager of Operations

Mr. J. E. Griffin, President

Mr. L. H. Heider, Vice President

l

l

.