ML20003C799

From kanterella
Revision as of 14:21, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revision 2 to 90-day Response to Suppl 3 of IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Safety Relief Valve Position Indication Is Only TMI Action Plan Equipment Installed at Brunswick
ML20003C799
Person / Time
Site: Brunswick, Robinson  Duke Energy icon.png
Issue date: 01/30/1981
From: Furr B
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003C800 List:
References
IEB-79-01B, IEB-79-1B, NO-81-152, NUDOCS 8103180410
Download: ML20003C799 (2)


Text

r

[ ~f Q January 30, 1981

'l FILE: NG-3513 (b)

SERIAL:

NO-81-152 to r

Mr. James P. O'Reilly, Director v[7 A

United States Nuclear Regulatory Commission 2

I f

f,IA/Q

  • IO8/ a.

C Region II Z

f' %

101 Marietta Street, Suite 3100 k %rQ a, Atlanta, GA 30303

,b o

I=

6 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. M 25 AND 30 3243 REVISION 2 TO IE BULLETIN 79-01B NINETY-DAY REPORT

Dear Mr. O'Reilly:

Attached you will find Revision 2 to our Ninety-day Report on Environmental Qualification of Safety-Related Electrical Equipment.

This report contains information only on installed TMI Action Plan equipment, since, due to the nature of BWR systems, the equipment necessary to achieve cold shutdown has already been listed in previous submittals.

The attached data deals with the SRV position indication system which is the only TMI Action Plant equipment currently installed at Brunswick. Additional equipment to be installed later will be dealt with under the requirements of Parts 2b, c, and d of Supplement 3 to IE Bulleting 79-01B.

'810318 0@O

4 James P. O'Reilly

.2-January 30, 1981 If you have aaf questions, please do not hesitate to contact my staff.

7 Yours very troty, QJ g/b' 1

B.'

. Furr 4

Vice President Nuclear Operations CSB:kbb*

,,yc.,,:

r-,'

achment btntoandsubscribedbeforemethis YO

-( })([ i UI4RP

,,, m

,=1981.

day of o

My Commission Expires /n // 9 fRS'_

h)

OLf

  • 0, a z Y

wm _

n,

?>gy p.,

.' /

L-~

N/tary Public

/

/

vous p

'u.*"

cc:

Mr. Zoltan Rosztoczy, ONRR

'b ec : Messrs.

D. L. Bensinger' 4-A. B. Cutter J. M.'-Johnson

, ~

L. H. Martin (w/o attachment)-

i S. McManus E Messu.t, NPPE-BSEP (w/o attachment)

A. C. Tollison, Jr.

J.-Waldorf, NPPE BSEP (w/o attachment) 4 C. W. Woods T

+

W b:

/

3 m-4 r

,y.y

-g

-,