ML20003H244

From kanterella
Revision as of 12:05, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/81-05 on 810309-13 & Notice of Violation
ML20003H244
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/25/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20003H245 List:
References
NUDOCS 8105050397
Download: ML20003H244 (2)


See also: IR 05000346/1981005

Text

7IC

['ga ng#

UNITED STATES

0"

NUCLEAR REGULATORY COMMISSION

.,.,

3

r

REGION ill

1

b[

799 ROOSEVELT ROAD

$

GLEN ELLYN. ILLINOIS 60137

o

MAR 2 51981

j

j

//

F

~

Docket No. 50-346

IO

Toledo Edison Company

APR '6b S8f.g

'

I

O

  • . a.

ATTN:

Mr. Richard P. Crouse

Vice President

gg 7

-

Nuclear

g

Edison Plcza

300 Madison Avenue

42

D

'

Toledo. OH 43652

Gentlemen:

This refers to the routine inspection conducted by Messrs. K. A. Connaughton

and L. Reyes of this office on barch 9-13, 1981, of activities at Davis-Besse,

Unit 1, authorized by NRC Operating License No. hTP-3 and to the discussion

of our findings with Mr. Murray and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A,

and a written response is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will oc placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

such information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

.

.

.

MAS 2 5 1981

Toledo Edison Company

-2-

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~ b . :n,(. )

ne . S

[.

T ~>

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-346/81-05

cc w/ encl:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State of Ohio