ML20004B729
| ML20004B729 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 03/17/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rich Smith VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20004B722 | List: |
| References | |
| NUDOCS 8105290386 | |
| Download: ML20004B729 (2) | |
See also: IR 05000271/1980022
Text
__
.
,
t
h
k
UNITED STATES
,f
g
NUCLEAR REGULATORY COMMISSION
5
l
REGION l
Q
g
831 PARK AVENUE
KING OF PRUSAM. PENNSYLVANIA 19400
g*****
Docket No. 50-271
NAR 17 1981
Vemont Yankee Nuclear Power Corporation
ATTN: Mr. Robert L. Smith
Licensing Engineer
1671 Worcester Road
Framingham, Massachusetts 01701
Gentlemen:
Subject:
Inspection 50-271/80-22
This refers to the routine inspection conducted by Mr. W. Raymond of this
office on November 17, 1980 to January 3,1981, at Vermont Yankee Nuclear
Power Station, Vernon, Vemont, of activities authorized by NRC Licensee
No. DPR-28 and to the discussions of our findings held by Mr. Raymond with
Mr. J. Pelletier and other members of your staff at the conclusion of the
inspection.
Areas examined dering this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
In accordance with Section 2.790 c' the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, e copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any informa-
tion that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the infarmation, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790. The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
8105290 3 86
.
-.
-
--
..
-
9
I
.-
,
MAR 171981
Vermont Yankee Nuclear
Power Corporation
2
.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Ojh-
q
g,
Eldon J. Brunner, Chief
Reactor Projects Branch #1, DRPI
Enclosures:
1.
Appendix A Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report No. 50-271/80-22
.
cc w/encls:
Mr. Warren P. Murphy, Plant Superintendent
Mr. W. F. Conway, Vice President and Manager of Operations
Mr. J. E. Griffin, President
Mr. L. H. Heider, Vice President
,
t
4
'
.-
- -
__
_.
- _ .
. . _ . . . . _ , . . _ _
, , _ . , . . . , . _ . . _
. . _ , , . . - . _ . , _ , _
_ ___..