d.
.o POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMaus CIMcLE NEW YORK. N. Y. loo 19 1212) 397 6200 GEoR,o,E t eERRv opsnatsuo opticsa TRUSTEES -
JOHN W. SOsTON JOHN S.OYSON Pas ogNT mocsounge erearonMANCE GEORGE 6.INGALLS JOSEPH R. SCMMIEDER veC S Ces as a ss aN es. Damt e CNiar CICH ARD M. FLYNN ROBERT 1. MILLON26 LERO W.
INCLA
.c aF FIN ANCaa.
P R E D E RIC E R. CLARK
'"****L',".'........,
..a
......u June 22, 1981 JPN-81-45 l @A
/f%
- O ','
p,~ t 9
Director of Nuclear Reactor Commission f
b U.S.
Nuclear Regulatory Commission U
c.
i [
scll 0 9 793j w k Washington, D.C.
20555 Attention:
Mr. Thomas A.
Ippolito, Chief va. me:4 uc, wen U
/
c0=ssicN
<;/7 Operating Reactors Branch No. 2
',/
/
Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Fire Protection Requirements of 10CFR50 and Appendix R to 10CFR50
Reference:
PASNY Letter dated March 19, 1981 (JPN-81-21)
J.
P.
Bayne to N.
R.
Denton In accordance with the referenced letter, the Authority submits herewith: (a) Plans and schedules for the implementation of Appendix R Section III.J, " Emergency Lighting"; and (b) An action plan to meet the Appendix R requirement of Section III.G, " Fire Protection Safe Shutdown Capability".
Item (a above is included in Attachment I.
The modifications recommended in Attachment I will be completed by June 31, 1982.
Item (b is included in Attachment II.
As indicated in the referenced letter, plans and schedules and/or exemption requests in accordance with Section 50.48.6 (c), to comply with Section III.G of Appendix R, were tentatively scheduled for submittal on December 28, 1981 pending completion of the Action Plan. The Action Plan indicates that plans and schedules for implementation of Section III.G will be provioed on December 11, 1981.
[\\
810630O D l
a
. o.
~
We trust that this systematic method of complying with the Fire Protection Rcquirements of 10CFRSO.48 and Appendix R to 10CFR50 meets with your approval and serves,to assure you that the Power Authority is committed to provide the optimum tire protection at its FitzPatrick facility..
Should you have any questions, please do not hesitate to contact me.
Very truly yours, hkl b VCG r!J.P.
Bayne
/
Senior Vice President Nuclear Generation 9