Part 21 Rept Re Defective Diesel Generator Governor Mfg by Woodward Governor Co Initially Reported 820226.Lock Washer & Nut Missing from Shutdown Solenoid & Broken Nut Found Inside Assembly.Governor Replaced & Returned for Repair
ML20041F191
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/03/1982
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82-594-000 PT21-82-594, PT21-82-594-000, NUDOCS 8203160278
Download: ML20041F191 (3)


Text

_

~

Consumers L

POW 8T e

David J VandeWalle Company um um.. m w,,~,.,

oeneres offmes: 1945 West Parnell Floed. Jackson. MI 49201 e (517) ?88-1636 March 3, 1982 g cn cp

.cp E

j - q-Dh u

g RECEIVED 5))L J' D g unn;ggw get-)m'

=

1-1

~

James G Keppler, Administrator B r%g gup_

U u1 r Regulatory Commission k*

b

/

799 P.oosevelt Road 4

Glen Ellyn, IL 60137 f0 g

l DOCKET 50-255 - LICENSE DPR PALISADES PLANT - 10 CFR 21 REPORT DEFECTIVE DIESEL GENERATOR GOVERNOR The attached 10 CFR 21 Report provides information of a Diesel Generator

(

Governor found to be defective. As a result of an evaluation of the deviation, it was determined that this occurrence is reportable in accordance I

with 10 CFR 21, " Reporting of Defects and Noncompliances".

l Another Governor, which meets applicable specifications and Quality Assurance requirements, has been installed in the Diesel Generator. Additional corrective actions planned call for the return of the defective Governor to the vendor for repair. The vendor, Woodward Governor Company, has and will cooperate fully with Consumers Power Company to comply with proper inspection l

procedures and technical requirements to obviate recurrence.

l l

This correspondence confirms a telecon report made to Mr Dwane Boyd of your staff on February 26, 1982 and, thus, conforms with the notification criteria of 10 CFR 21.21(b2).

q doih db David VandeWalle Nuclear Licensing Administrator CC Director, Of fice of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector-Palisades Attachment oc0382-0002a142 g

l9 8203160278 820303 S@

rem $t \\

PDR ADOCK 05000255 S

PER Y- '

n -

O 10 CFR 21 REPORT The following information provided below as required by 10 CFR 21:

1) Hame and Address of Individual informing the URC:

D J VandeWalle Consumers Power Company 1945 West Parnall Road Jackson, Michigan h9201

2) Facility identification, activity or basic component which fails to comply or contains defects is:

Facility: Palisades Plant Basic Component:

Governor for 1-1 Diesel Generator

3) The firm constructing facility or supplying the basic component which failed to comply or contained defect is:

Woodward Governor Company Box 1519 Fort Collins, Colorado 80522 h)

A.

Nature of defect or failure to comply is:

Woodward Governor (serial #9h708) had the following defects:

(1) A lock washer and nut were missing from the shutdown solenoid.

(2) A broken brass nut was found inside the governor assembly.

This condition is believed to have caused an overspeed trip of the diesel which occurred on February 16, 1982.

B.

The safety hazard which was or could be created is:

The following scenario could have transpired:

In the event of loss of offsite power, loss of all AC power could result if governors with this defect were installed in the Diesel Generators.

If a governor containing this defect vere installed in one diesel, loss of all AC power could occur if the other diesel were inoperable and a loss of offsite power occurred.

5) The date when information of defect or failure to comply was obta1ned:

o The defect was identified on February 16, 1982.

The information of deviation was obtained on February 2h,1982.

oo The determination that the condition is reportable under 10 CFR 21 was made on February 26, 1982.

6) Are similar parts used in other systems and equipment?

The same type of governor is used for both Diesel Generators.

r e

10 CFR 21 REPORT 2

7)

A.

State the corrective actions planned or taken:

The governor will be returned to the vendor for repair Prior to installing the replacement governor, it was tested and found to be free from similar defect.

B.

The name of the individual / organization responsible is:

Consumers Power Company C.

Estimate the length of time required to complete the corrective action:

The length of time required to repair the defective governor is not known. Another governor has been installed in the diesel.

8) Any advice related to the defect of failure to comply about the facility, activity, or basic component that has been, is being, or will be given to the purchasers or licensees:

None.

9) Attach a copy of other appropriate information (i.e. DR, NR, ER, etc)

None.

I' DATE PREPARED BY:

U/

c/

APPROVED: YES N0 o,,

h d/ t<</b _

'DATE March 3, 1982 Nuclear Licensing Administrator

(

l l

l

-, -