IR 05000003/1976006

From kanterella
Revision as of 18:39, 19 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Matl Meeting Repts 50-003/76-06,50-247/76-10 & 50-286/76-12 on 760414.No Noncompliance Noted.Major Areas Discussed:Licensee Health Physics & Physical Protection Programs
ML20042B070
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/20/1976
From: Davis A, Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20042B068 List:
References
50-003-76-06, 50-247-76-10, 50-286-76-12, 50-3-76-6, NUDOCS 8203240527
Download: ML20042B070 (3)


Text

.... - - - - - - -. -

.

e

.

.

.

..

v)

140TICE j

A3 CF S2E E O UI3 REG:0N I HAS NOT 03fAINED FR0hif1MY

,

CLIARANCE IN ACCORDANCE WITH 10 Ct A 2700 U. S. !!UCI.IL*.R RECUL\\ TORY CC:1:11SSIO:1 0FFICE OF I:;SPECTIO:t A:!D E !FORCC!E !T REGIO:1 I 50-003/76-06 50-247/76-10

.

Inspection Report ?!o: QU 286/76-123

.

Docket I;o:

_50-286 DPR-5 consce:

Consolidated Edison Coispany of New York, Inc.

License No:

DPR-26 DPR-64

-

4 Irving Place Priority:

c New York, New York 10003 Category:

C

,

_

Safeguards Group:

a tion:

Buchanan. New York PWR, 615 MWt (B&W)

-

>c of Licensec:

PWR, 2758 MWt (W)

'

PWR, 3025 MWt (W)

se of Inspection:

Management Meeting

cs of Inspection:

April 14, 1976

.

Unit 1 April 6-9, 1976

cs of Previous Inspection: Unit 2 Anril 6-9.

1976 nit 3 April 5-7, 1976 terting Inspector:

rLN

'//M/74

"

eV J. F. Streeter, Reactor Inspector DATE

'

ot2panying Inspectors:

nng<nn 7 4, c n n,.,. n,..., n a,,,., n., n n,., n n,.

personnel participating in this meeting DATE are indicated in the attached Summary of Findings DATE

,

DATE cr Accompanying Personnel:

annm A

DATE L}

icwed By:

.I h'

V!' e / 7 C A. B. Davis, Section Chief, Reactor Project Section No. I DATT~

'

Reactor Operations and Nuclear Support Branch 8203240527 760420

'

PDR ADOCK 05000003

.

G PDR

-

- -

,

.... - -

e

-

.

.

_ SUMMARY OF FINDINGS Enforcement _ Action No enforcement action was taken as a direct result of this meetin ever, items discussed are related to concerns identified during Region I g; how-Inspecticas 50-003/76-02, 50-003/76-05, 50-247/76-04, 50-247/76 08 50-286/76-07.

will be documented in the associated inspection reports.Any enfo

, and

-

Other Significant Findings Managemer*._ Meeting

.

The managet Region I Office on AprilTt meeting requested by Region I was conducted at the NRC 14, 1976.

dance:

The following personnel were in atten-

_ Consolidated Edison Company of New York, Incorporated Mr. W. J. Cahill, Vice President - Quality Assurance, Reliability and Special Assistant Nuclear

,

Licensing Mr. S. Salay, Plant ManagerMr. E. F. Kessig, Assistant Vice Preside a ons Mr. W. Stein, Manager - Nuclear Power Generation Department Mr. R. W. Van Wyck, Nuclear Services Manager

_ Region I, Office of Inspection and Enforcement, USNRC Mr. J. W. Devlin, Section Chief - Security and Investig ranch Mr. P. J. Knapp, Section Chief - Radiation Support Section on Mr. D. R. Neely, Radiation Specialist - Radiation Support Section

!

Mr. J. P. O'Reilly,. Regional Director

'

Mr. J. F. Streeter, Reactor Inspector - Reactor Projects Section N Mr. W. J. Tobin, Physical Security Inspector - Security and Investi o.

gation Section Purpose and Scope s

The meeting with Consolidated Edison Company of New York Health Physics Program and Physical Protection Programagem

,

i s

.

!

,

..

...-- -

-.,

e

-

.

..

-2-Discussion Items

.

The Regional Director stated the purpose of the meeting was to discuss with corporate and plant management certain areas of concern to Region I to assure that (1) the licensee was aware of the nature and extent of these concerns, and (2) the licensee had either completed or initiated associated corrective action.

Specific topics discussed were as follows:

1.

Summary discussion of inspection findings during recent inspec-tions in the areas of Health Physics and Physical Protection.

2.

Overexposure (10 Rem) of an individual at Unit 2 on April 5, 1976.

.

3.

Adherence to health physics procedures and management of the Health Physics Pro 8 ram.

4.

Management of the Physical Protection Program.

.

l

!

l

.

,

i l

l I

l l

l l

l

,_

-

.

- - -.