Forwards Insp Rept 50-455/93-14 on 930921-1020.No Violations Noted
ML20059K586
Person / Time
Site: Byron Constellation icon.png
Issue date: 11/09/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20059K589 List:
References
NUDOCS 9311160105
Download: ML20059K586 (2)


See also: IR 05000455/1993014

Text

.

g*ga Coq [g

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

i

{

j .r. (

g

REGION 111

.: c

799 ROOSEVELT ROAD

o,

[

GLEN ELLYN. ILUNOIS 60137-5927

%,

f

  • "**

f&, L

1993

Docket lio. 50-455

Commonwealth Edison Company

ATT!4:

Mr. L. O. DelGeorge

Vice President

fluclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300

Downers Grove, IL 60515

Dear Mr. DelGeorge:

This refers to the inspection conducted by Mr. J. F. Schapker of this office

on September 21 through October 20, 1993. The inspection included a review of

inservice inspection activities at your Byron fluclear Power Station, Unit 2.

The findings were discussed with those members of your staff identified in the

enclosed report at the conclusion of the inspection.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with fiRC requirements,

lio violations of f4RC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the f4RC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

k

G. C. Wright, Chief

-

Engineering Branch

Enclosure:

Inspection Report

fio. 50-455/93014(DRS)

See Attached Distribution:

9311160105 931109

PDR

ADOCK 05000455

g

G

PDR.

Pab42-1470/

. ..

-

-

. ,

. =

..

--

-

_.

t

.

,L

t

,

i

Commonwealth Edison Company

2-

Nay'e

'iB93-

i

DISTRIBUTION

!

I

cc w/ enclosure..

,

K. Graesser, Site Vice

' i

President

'

G. Schwartz,. Station Manager

D. Brindle, Regulatory Assurance

1

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

!

OC/LFDCB

Resident Inspectors-Byron,

'

Braidwood, Zion

.i

Richard Hubbard

'

J. W. McCaffrey, Chief,

Public Utilities Division

.

Licensing Project Manager, NRR

,

Robert Newmann, Office of Public

'!

Counsel, State of Illinois Center.

i

'

State Liaison Officer, Wisconsin

State Liaison Officer, Illinois

Chairman, Illinois Commerce

.l

Commission

{

'I

l

l

t

!

-

,

-

cj

!

-

!

'

,

I

i

!

!

l

!

1

o

.c

.

.

.

~.

,_

.

.

_

. - _ . _

_.

.