r_ _
=
_ w e.s y.,
TIIE CINCINNATI GAS & ELECTRIC COMPANY 88 CINCINN ATI. OHIO 45201 December 1, 1982 QA-2144 E. A, BOROMANN SEN80M VsCE Pnt geot NT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Regional Administrator RE:
WM.11. ZIMMER NUCLEAR POWER STATION UNIT I I.E. INSPECTION REPORT 82 DOCKET NO.
50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300 JOB E-5590 FILE NO. NRC-1 Centlemen:
This letter constitutes our formal response to the subject Report.
It is our opinion that nothing in the Report or this letter is of a proprietary nature.
ITEM I NRC Finding:
"... Engineering Assistants (who were not qualified to do the work of a Welding Engineer), employed by II. J. Kaiser, were performing functions which were described in the contractor procedures as ' Welding Engineer' functions." (Violation of 10CFR50, Appendix B, Criterion IX)
A.
Corrective Action Taken and Results Achieved Procedure WCP-7, " Welding Control," has been revised to require the Project Welding Engineer to designate certain qualified personnel to re-view and approve KEI-Weld-l forms, KEI-Weld-1A forms, hanger drawings and ISK drawings.
B.
Corrective Action Taken to Prevent Further Noncompliance As stated above, the revision to WCP-7 will prevent further noncompliance.
C.
Date When Corrective Action Will be Achieved i
l Full compliance has been achieved.
8301110238 830107 PDR ADOCK 05000358 l
G PDR l
DEC 6 882 i
L
+-
k k
I
n i;,-
i q
k Mr, J. G. Keppler
\\
+
Region III 3
) 7lt December 1, 1982 - QA-2144 Page 2
\\r si y
'i 0
\\
i
'\\
ITEM II X.>
z s
NRC Finding:
't
"... Induction IIcating Strenn Improvement (IllSI) Proceduro 5149, Rovinion 1 Calibration Procedure, wan not fully completed on April =22, 1982, and the activitien affecting quality were not being performed.
s.
Procedure Item 6.3.4 through 6.3.9 were not performed and the procedut o had only been performed at one of four work utntions."
(Viointion of 10CFR50, Appendix II, Criterion V)
A.
Corrective Action Taken nnd Resulta Achieved Corrective Action Requent (CAR) #82-29, identified thin condition on April 8, 1982. A calibration verification was performed and the renults indicate that the IHSI data nyntem wnn in calibration and the temperature valoon obtained were valid.
II. Corrective Action Taken__to Prevent Further Noncompilance Hecnunc Zimmer wnn the first production facility ulitizing the IllST procenn, and the proceduren affecting activitten annociated with thin procenn are unique to IllSI, it in believed that thin item of noncomplinn e a
in luolated to IllSI and in not indicative of any underlying programmat'c defielency. Therefore, no further corrective action in required.
C.
Date when Full Compliance Will be Achieved Full compliance han been achieved.
We trunt the above will be found acceptable nn a formal response to the nubject Report.
Very truly yourn, CINCINNATI CAS & EI.ECTRIC COMPANY lly E. A. Il0HCMANN SENIOR VICE PRESIDENT FKp:nn cc: NRC Office of Inspection & Enforcement Wanhington, D.C. 20555 NRC Senior Resident Innpector Attn:
W. F. Christiannon Zimmer Project Innpector Region 111 t