ML20066C081
| ML20066C081 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/29/1982 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20066C083 | List: |
| References | |
| NUDOCS 8211090338 | |
| Download: ML20066C081 (1) | |
Text
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 (2151841 4000 October 29, 1982 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station, September, 1982, Monthly Operating Report Data Correction Gentlemen:
Attached are twelve corrected copies of the page " Unit Shutdowns and Power Reductions" of the monthly operating report-for Peach Bottom Unit 2 for the month of September, 1982 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
The reason (2) column for No. 9 shutdown has been connected from D
" Regulatory Restriction" to G
" Operational Error".
We regret any inconvenience this error may have caused.
yery trul
- yours, M.
ooney S,
rintendent G
eration Division - Nuclear Attachment cc:
Mr. R. C. Haynes A. R. Blough l
Administrator Site Inspector Region I P.O. Box 399 US Nuclear Regulatory Commission Delta, PA 17314-0399 631 Park Avenue King of Prussia, PA 19406
}b'
( 8211090338 8121029'
~ ' ",
PDR ADOCK 05 l 9 __.._._,.-_ 000277 _.,,'
PDR l
.