ML20072A687
| ML20072A687 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/01/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 10CFR-505-55E, GN-231, NUDOCS 8306100221 | |
| Download: ML20072A687 (1) | |
Text
Georgia Power Cc:npany
- Post Offece Boa 4545 Atlanta, Georgia 30302 USNRC Telephone 404 526-6526 ATL Anr',pEClON.'l s utnem moany ervices. inc.
wFOpgg g
gg P tmingham, Alabama 35202 g3 g g Southern CompanyServices wrone 205 870am D. O. Foster Vice President and General Manager Vogtle Project June 1, 1983 United States Nuclear Regulatory Commission File:
X7BG03-M25 Office of Inspection and Enforcement Log:
GN-231 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Reference:
Vogtle Electric Generating Plant - Units 1 and 2 50-424, 50-425; Embeds - 1982 Letter to J. P. O'Reilly dated March 18, 1983 (GN-220)
Attention: Mr. James P. O'Reilly Gentlemen:
In the above referenced letter, Georgia Power Company indicated that the NRC could expect to receive a final report on May 27, 1983. At this time, ariditional infonnation is needed before Georgia Power Company can complete its evaluation. The information is expected by June 10, 1983.
Georgia Power Company now expects to submit a final report to the NRC by June 24, 1983.
The report contains no proprietary infonnation and may be placed in the NRC Public Document Room upon receipt.
Your truly, j
e
/
D. O. Foster D0F/CWH/jr xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20553 R. J. Kelly R. H. Pinson E. D. Groover R. E. Conway D. L. McCrary L. T. Gucwa G. F. Head R. A. Thomas M. Malcom J. T. Beckham, Jr.
J. A. Bailey G. Bockhold, Jr.
P. D. Rice D. N. MacLemore
- 0. Batum J. L. pCNcM D. E. Dutton H. H. Gregory, III W. F. Sanders DO O 000 24 f
PDR g g t
.-