Text
y--
e f
a
- O Pubhc Service Dectric and Gas Company Stanley LaBruna Public Service Electne and Gas Company P.O. Box 236 Hancocks Bridge. NJ 08038 609-339-1700 AUG 2 21994 vo r m.nor.."""
NLR-N94160 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST REPORT FIFTH REFUELING OUTAGE HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric & Gas Company (PSE&G) hereby provides the enclosed report in accordance with 10CFR50, Appendix J, Sections V.B.1 and V.B.3, and Hope Creek Technical Specification 4.6.1.2.
This submittal contains the " Reactor Containment Building Integrated Leak Rate Test" dated April 1994, as Enclosure 1.
Should you have any questions regarding this transmittal, please do not hesitate to call us.
Sincerely, M.-
Enclosure Affidavit 000 0 >11 0
.9409020178 940430 PDR ADOCK 050003S4 P
s AUG 2 21994 Document Control Desk 2
NLR-N94160 C
Mr. T.
T. Martin, Administrator - Region I U.
S.
Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr.
D.
Moran, Licensing Project Manager U.
S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr.
R. Summers (SO9)
USNRC Senior Resident Inspector Mr.
K.
Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 w
i
+
1 REF: NLR-N94160 STATE OF NEW JERSEY
)
)
SS.
COUNTY OF SALEM
)
Stanley LaBruna, being duly sworn according to law deposes and i
says:
I am Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Hope Creek Generating Station, are true to the best of my knowledge, information and belief.
/"
/
i Subscribed and Sworn t b
7 efore me this[h/Mc day of d'n c/ul
~
1994
/
v' m/
.-/
(/. L43a fm[(;~~ ~ d 'I) 4 c%cw otary PubIic hf New Jerscy k
l 1
KIMBERLY JO BROWN Hy Commission expires on ek e ",,!Nbf[A. f$,,u/.ER{EJ r-
, wo I
l
i REACTOR CONTAINMENT BUILDING 1
INTEGRATED LEAK RATE TEST Public Service Electric and Gas Company Hope Creek Generating Station Docket 50-354 April 1994 Y
Reactor Containment Building Integrated Leak Rate Test i
Ilope Creek Generating Station, April 1994 Table of Contents 1NTRODUCTION........
1 PRIMARY CONTAINMENT DESIGN..
1 CONTAINMENT INTEGRATED LEAKAGE RATE TEST..........
2 PREPARATION.........
2 VISUAL EXAMINATION.........
3 PRESSURIZATION...
3 STABILIZATION.........
4 TY PE A TEST.................
5 SUPPLEMENTAL TEST....
6 DEPRESSURIZATION...............
6 RESULTS....
7 APPENDICES Appendix A - Containment Integrated leakage Rate Test Sensor Locations Appendix B - Stabilization Data Appendix C - Type A Test Data (Total Time Calculation)
Appendix D - Type A Test Data (Mass Point Calculation)
Appendix E - Supplemental Test I)ata Appendix F - Local Leakage Rate Test Data for Type B and Type C Tested Penetrations Appendix G - Imcal Leakage Rate Test Data for Main Steam Lines Appendix H - Local Leakage Rate Test Data for Water Sealed Valves Appendix I - Extended Containment Boundary Leakage I
i Reactor Containment Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 1
1.0 INTRODUCTION
This report is being submitted pursuant to 10CFR50 Appendix J V.B.I. This report summarizes the second periodic Primary Containment Integrated Leakage Rate Test (CILRT) performed at Hope Creek Generating Station in April 1994. The CILRT was completed as required by 10CFR50 Appendix J and Hope Creek Generating Station Technical Specifications 4.6.1.2 (a),4.6.1.2 (b), and 4.6.1.2 (c).
The CILRT demonstrated the leak tightness of the primary containment, including the drywell and torus liners, the downcomers, mechanical bellows, electrical penetration assemblies, mechanical seals, the airlock, containment penetrations, and containment isolation valves.
2.0 PRIM ARY CONTAINMENT DESIGN The primary containment at Hope Creek Generating Station is a BWR Mark I Containment; which consists of a drywell and torus with eight interconnecting downcomers. The Hope Creek design also includes extended containment boundaries, which are essentially closed piping systems outside the primary containment.
The drywell is designed for an internal pressure of 62 psig at a temperature of 340'F.
The calculated peak accident pressure in the drywell is 48.1 psig and the calculated peak accident temperature is 340'F. The free air volume of the drywell and downcomers combined is 169,000 ft'.
The torus is designed for an internal pressure of 62 psig at a temperature of 310'F. The calculated peak accident pressure in the torus is 27.5 psig and the calculated peak accident temperature is 212'F. The free air volume of the torus ranges between 133,500 ft' with the water at the high level (78.5") to 137,500 ft' with the water at the low level (74.5").
Extended containment boundaries are designed and constructed to be as reliable as the primary containment itself (i.e. quality group B, seismic category I, with pressure md temperature ratings at least equal to that of the containment).
The overall integrated containment leakage rate assumed for the designed basis accident (I,) is 0.5% by weight of the containment air per day at a pressure of 48.1 psig (P,).
Also assumed for the design basis accident is a leakage rate of 46.0 scfh through all four main steam lines, and an engineered safety features water leakage of 10 gpm from extended containment boundaries.
Page 1 of 8
i Reactor Containment Building Integrated Leak Rate Test 4
Hope Creek Generating Station, April 1994 3.0 CONTAINMENT INTEGRATED LEAKAGE RATE TEST The CILRT consisted of seven activities, those being Preparation, Visual Examination, Pressurization, Stabilization, Type' A Test, Supplemental Test, and Depressurization.
Each activity is described in detail in the following sections.
3.1 PREPARATION Imcal leakage rate testing of penetrations and containment isolation valves was performed prior to and after the CILRT. The "as found" leakage rate of locally testable containment boundaries was measured, repairs and adjustments were made, and the "as left" leakage rate was measured. For locally testable components tested during the CILRT which were adjusted after the CILRT, the leakage rate was also measured immediately prior to the CILRT. Extended containment boundaries which operate at pressures greater than P, were examined for leakage during system operation.
The primary containment was aligned as close as practical to the lineup which would exist during the design basis accident. Systems which are normally filled _.
I with water and operate after the design basis accident were not vented or drained, remaining in their normal post-accident configuration. Systems that are part of the primary containment boundary that could be exposed to the primary containment atmosphere after the design basis accident were isolated, drained, and vented as necessary to expose the containment boundary to atmosphere. Containment isolation valves were positioned by normal means. Thirteen primary containment penetrations were aligned not to be tested at the start of the CILRT, as follows:
Penetrations P2A, P17 Penetrations were isolated because of excessive leakage that would interfere with satisfactory completion of the Type A Test.
Penetrations P3, P4A, P4B Penetrations were operable to support shutdown cooling.
Penetrations P8A, P8B, P38A, P38B Penetrations were operable to i
maintain the plant in a stabilized j
condition.
Penetrations 336C, J36D,3209 Penetrations were operable to support the CILRT.
I Penetration J50 System configuration was such that it l
could not be aligned to expose the containment isolation valves to the containment atmosphere.
Page 2 of 8 l
Reactor Containment Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 l
The reactor was vented and reactor level was established below the mam steam lines. Torus level was established at 74.9". These levels ensured that components were exposed to the same fluids as would exist during the design basis accident.
Plant systems which activate on high drywell pressure were deactivated for the CILRT.
i The CILRT instrumentation consisted of 17 temperature sensors, six relative humidity sensors, two absolute pressure sensors, and two supplemental test flowmeters. Temperature and relative humidity sensors were placed in locations throughout the primary containment in conformance with the Temperature Survey, as shown in Appendix A. The CILRT Instrumentation was calibrated within the six months prior to the CILRT, with standards traceable to the NIST.
Once installed, an in-situ check was performed to demonstrate each sensor's functional ability. The two flowmeters were checked against each other to demonstrate functional ability. Computers were used to poll the sensors, record the readings, and compile data.
The pretest Instrument Selection Guide formula yielded an acceptable overall instrument sensitivity of 0.0146% per day (0.0292 I,).
3.2 VISUAL EXAMINATION A visual examination of the accessible interior and exterior surfaces of the primary containment was performed prior to the Type A Test. No unacceptable conditions were identified.
3.3 PRESSURIZATION Figure 1 - Pressurization 70.0 ratuaxi pressurranm rate 60.0 50.0 pause in preuuna6m 40.0 g
$1 h ~ 30.0 20.0 10.0 0.0 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00 4/1I/94 TIME Page 3 of 8
Reactor Containment Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 Containment pressurization began on 4/11/94 at 15:15. Pressurization was stopped between 16:55 and 17:20 to check for gross leakage. Pressurization recommenced at 17:20. Crews were dispatched at pressures of approximately 10 psig and 30 psig to look for evidence of leakage. As the pressure approached the required test pressure, the pressurization rate was slowed. Test pressure of 64.29495 psia was attained on 4/11/94 at 23:10. The average cantainment pressurization rate was 7.18 psi per hour. Pressurization is shown in Figure 1.
3.4 STABILIZATION Containment atmospheric stabilization began on 4/11/94 at 23:20. During stabilization, extended containment boundaries which normally operate at pressures less than that experienced during the design basis accident were examined for evidence of leakage. Leakage of reactor coolant from the control rod drive insert and withdrawal lines was identified. Once the leakage from the control rod drive insert and withdrawal lines was quantified (approximately 2 gpm), these penetrations (P35s, P36s) were isolated.
Stabilization for the mass point analysis was declared on 4/12/94 at 03:40 with a difference between the weighted average containment temperature over the last four hours and the weighted average containment air temperature over the last hour of 0.103'F. This met the acceptance criteria of OSF and exceeded the minimum required duration of four hours.
Stabilization for the total time analysis was declared on 4/12/94 at 06:20 with (1) a difference between the weighted average containment air temperature over the last four hours and the weighted average containment air temperature over the last hour of 0.029'F, and (2) the rate of change of the weighted average Figure 2 - Stabilization 76.0 75.5 75.0 R
5 F 74.5 t-2 74.0 73.5 73.0 23:00 00.00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 4/11/94-4/12/94 TIME Page 4 of 8
Reactor Containment Building Integrated Leak Rete Test Ilope Creek Generating Station, April 1994 containment air temperature over the htst two hours was 0.060'F. These met the acceptance criteria of 0.5"F and 1 F respectively, and exceeded the minimum required duration of four hours.
Stabilization is shown in Figure 2, and Stabilization data is presented in Appendix B.
Near the end of stabilization, liquid levels and control rod drive hydraulic control unit nitrogen pressures were re-corded.
3.5 TYPE A TEST The Type A Test was performed utilizing the absolute method. Two separate data analysis techniques were used: total time and mass point.
Figure 3 - Type A Test (Total Time Calculation) 0A00 0.75 Lal.imit Y
0300 2
s.a O {0250
)#
95% UCL
< C j
0200 g
0.150 0.100 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 4/12/94 TIME The total time technique was utilized in an attempt to complete a short duration Type A Test in accordance with Bechtel Topical Report BN-TOP-1 Revision 1.
Satisfactory completion of a short duration Type A Test utilizing this method is largely dependent on the selection of the first data point. For this reason, stabilization was extended longer than the minimum four hour period. The Type A Test using the total time technique began on 4/12/94 at 06:20 and was completed on 4/12/94 at 14:50. The calculated leakage rate was 0.2033% per day (0.4066 () and the leakage rate at the two-sided 95% UCL was 0.21659% per day (0.433181 ) as shown in Figure 3. The Type A Test lasted for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and 30 4
minutes. Total Time Type A Test data is presented in Appendix C.
The mass point technique was utilized in the event a 24-hour Type A Test was necessary, and to verify the acceptability of a short duration Type A Test.
Page 5 of 8
Resctor Containment Building Integr:ted Leak Rate Test Ilope Creek Generating Station, April 1994 Stabilization was achieved after four hours. The Type A Test using the mass point technique began on 4/12/94 at 03:40, and was completed on 4/12/94 at 14:50.
The calculated leakage rate was 0.20331% per day (0.406621.,) and the leakage rate at the 95% UCL was 0.20419% per day (0.40838 L,). These confirmed the acceptability of the short duration Type A Test results. Mass point Type A Test data is presented in Appendix D.
3.6 SUPPLEMENTAL TEST Upon completion of the Type A Test, a leakage rate (L) of 0.49447% per day (0.988941 ) from the primary containment was superimposed on the existing 4
primary containment leakage rate. With the imposed leakage, the CILRT instrumentation measured a composite leakage rate (primary containment leakage rate plus supplemental leakage rate) of 0.6527% per day (1.3054 L.). The difference between the leakage rate measured by the supplemental test flowmeter and the additional leakage rate measured by the CILRT instrumentation was 0.04508 % per day (0.09016 Is).
Supplemental Test is shown in Figure 4, and the data is presented in Appendix E.
Figure 4 - Supplemental Test 130 1.20 1.10 1,00
.@ 0.90 Upper Limit (In* lam + 25%Ia)
Oh{
j { 0.80 95% UCL Composite 0.60 Composite (1c)
Inwer limit (In41am.25ta) 0.50 DAO 1& 00 17.00 IX:00 19.00 20:00 21:00 4/12/94 TIME 3.7 DEPRESSURIZATION Containment depressurization began on 4/12/94 at 20:30. Depressurization was stopped between 21:55 and 22:45 to support other plant testing. Depressurization recommenced at 22:45. The
!ainment was depressurized on 4/13/94 at 06:10.
The average depressurization rate was 6.08 psi per hour.
Page 6 of 8
=
Reactor Containment Building Integrated Leak Rate Test i
Ilope Creek Generating Station, April 1994 Figure 5 - Depressurization 70.0 M).O 50 0
, 40 0 ai
~ 30.0 paisein deressuriMion 20.0 10 0 0.0 2l00 2200 2300 00 00 01:00 02:00 0300 04:00 05D0 O&OO 0700 4/12/944/13/94 TIME Depressurization is shown in Figure 5.
4.0 RESUITS Visual examination revealed that the primary containment structure was in acceptable condition.
The primary containment atmosphere stabilized in the minimum required time of four hours. Stabilization was continued for three additional hours to obtain data necessary to declare the start of the Type A Test with a reasonable level of confidence in_ completing it in eight hours.
The measured leakage rate was 0.2033% per day. When corrected for changes in reactor level, sump level, control rod drive hydraulic control unit accumulator pressures, and penetrations not tested; and adjusted for local leakage rate test data, the "as found" overall integrated primary containment leakage rate was 0.25167% per day and the "as left" overall integrated primary containment leakage rate was 0.23697% per day.
The Supplemental Test confirmed the ability of the Type A Test instrumentation to detect and quantify a leak on the order of magnitude of I.
4 All sensors remained functional throughout the CILRT; therefore, the pretest Instrument Selection Guide remained valid and met the required sensitivity of 0.251.
4 Local Leakage Rate Test results for Type B and Type C components between the first period CILRT in November 1989 and this CILRT are presented in Appendix F.
Leakage rates were maintained below ( during this period.
Page 7 of 8
Reactor Containment Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 Local Leakage Rate. Test results for main steam line components between the first periodic CILRT in November 1989 and this Cll RT are presented in Appendix G. A leakage rate in excess of 46.0 scfh was identified in 1991, and was subsequently corrected.
Local Leakage Rate Test results for water tested va!ves between the first period CILRT in Novernber 1989 and this CILRT are presented in Appendix H. Extended containment boundary leakage results are presented in Appendix 1. Water leakage rates were maintained below 10.0 gpm for this period.
Page 8 of 8
Reactor Containment Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 Appendix A - Containment Integrated Leakage Rate Test Sensor Locations RELATIVE HUMIDfTY SENSORS (B)
TEMPERATURE SENSOB.S f *l VOLUME VOLUME SARS.QR ELEVATION AZLMRTB FRACTION
$D[$QH ELEVATION AZlM_ LITH EfLA_CTION ZONE 1 ZQN1_1 R H-1 162' 45' 0 1412 T-1 162' 45' O.0472 T2 162' 165*
0.0471 Z. NE.2 T-3 162' 285*
0.0471 Q
R H-2 112' 45' O.1008 RH 3 112' 165*
0.1008 ZQNg_2 R H-4 112' 285*
0.1008 T-4 122' 45' 0 0451 R H-5 90' 245' O.1035 T-5 122' 135' O.0451 T-6 122' 225' O0451 h
ZQN1_3 T-7 122' 315' O.0451 R H-6 76'6" 180*
0.4529
/.l l {
m T-8 100' 45' O0563 T9 100' 135*
0.0563 T-10 100' 225*
O0563 T-11 100' 315*
0.0663 ZQhE.4 T-12 76'6" 45' O.0755 T-13 76'6" 105*
0.0755 T-14 76'6" 165*
0.0755 T-15 76'6" 225' O0755
,o.--,r
- "l T-16 76'6" 285*
0.0755
[" ~~"' ?~" ~ )
T-17 76'6" 345' O.0755 z ' :, q La 2..;
7 C
j N
/
/
N 1
l
.-1+#:
+,a.. 4 v.-
ye.
wa%# w ~
.a
- c.,,
s.,~
,. u n.,
Page 1 of 1
Reactor Containment Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 Appendix B - Temperature Stabilization Data AVERAGE l
AVERAGE BN-TOP-1 BN-TOP-1 CHANGE IN j
TEMPERATURE AVERAGE RATE TEMPERATURE CHANGE IN OVER LAST OVER LAST OVER LAST OVER LAST ANS-58.8-1987 TIME TEMPERATURE TEMPERATURE 1 HOUR 2 HOURS 2 HOURS 4 HOURS CRITERIA 1
('R)
(*R)
('R)
(*R/hr)
(*R/hr/hr)
('R)
April 11,1994 2320 534.694 2325 534.603
-0.091 2330 534 532
-0.070 2335 534.472
-0.061 2340 534 414
-0058 2345 534 370
-0 044 2350 534.331
-0.040 j
2355 534 293
-0.037 Apnl12,1994 0000 534.262
-0031 0005 534 229
-0033 0010 534.193
-0.036 0015 534.165
-0 029 0020 534.141
-0.024 534 418 0025 534 115
-0.026 534 359
)
0030 534 091
-0 024 534.312 0035 534.070
-0.021 534.271 0040 534.043
-0.027 534 229 0045 534.025
-0 018 534.198 1
0050 534 011
-0.014 534.171 0055 533.993
-0.019 534.143 0100 533 971
-0.022 534.116 0105 533 949
-0022 534 089 0110 533 926
-0023 534.060 0115 533 908
-0018 534 036 0120 533.887
-0 021 534 014 0.403 0.403 0125 533 869
-0.019 533 992
-0367 0.367 0130 533.855
-0013 533.973
-0.338 0.338 0135 533 837
-0.018 533 953
-0.317 0.317 0140 533 825 4 013 533.934
-0.295 0.295 0145 533 805
-0.019 533 915
-0.283 0.283 0150 533.792
-0.013 533.902
-0.269 0.269 0155 533 781
-0.011 533 887
-0.256 0.256 0200 533.770
-0011 533 870
-0 246 0 246 0205 533.754
-0 016 533.851
-0 237 0.237 0210 533 741
-0013 533.834 0226 0 226 0215 533.726
-0015 533 817
-0 219 0 219 0220 533 715
-0.011 533 801
-0 213 0 213 0225 533.702
-0014 533.785
-0207 0 207 0230 533.693
-0009 533.774
-0.199 0 199 0235 533 684
-0009 533.700
-0.193 0.193 0240 533 670
-0.014 533.747
-0187 0 187 0245 533 664
-0.006 533 734 0.181 0 181 0250 533 656
-0 008 533.724
-0.178 0.178 0255 533.646
-0.010 533 714
-0173 0.173 0300
$33 635
-0011 533 703
-0.168 0.168 0305 533 625
-0.010 533 690
-0.162 0.162 0310 533 616
-0.009 533.679
-0.155 0.155 0315 533 606
-0010 533 666
-0 151 0151 0320 533 594
-0.012 533 654
-0.147 0147
-0.275 0.1 54 Page 1 of 2
Reactor Containment Building Integrated Leak Rate Test IIOpe Creek Generating Station, April 1994 Appendix B (continued)
AVERAGE AVERAGE BN-TOP-1 BN-TOP-1 CHANGE IN TEMPERATURE AVERAGE RATE TEMPERATURE CHANGE IN OVER LAST OVER LAST OVER LAST OVER LAST ANS-56.81987 TIME TEMPERATURE TEMPERATURE 1 HOUR 2 HOURS 2 HOURS 4 HOURS CRITERIA i
('R)
('R)
(* R)
('R/hr)
('R/hr/hr)
('R) 0325 533.581
-0.013 533 641
-0.144 0.144
-0.255 0.135 0330 533.578
-0.004 533 635 0.139 0 139
-0.239 0.123 0335 533.567
-0.011 533 625
-0135 0.135 4 226 0.109 0340 533.559
-0.008 533.614
-0.133 0.133
-0.214 0.103 0345 533.555
-0 004 533fD9
-0.125 0 125
-0.204 0.095 0350 533.543
-0.011 533.599
-0.125 0.125
-0.197 0.084 0355 533 540
-0.003 533 593
-0.120 0.120
-0.188 0.083 0400 533.534
-0007 533.584
-0.118 0 118
-0.182 0.080 0405 533.529
-0.004 533.577
-0.112 0 112
-0.175 0.079 0410 533 523
-0.006 533.570
-0.109 0.109
-0.168 0.075 0415 533 515
-0.008 533 561
-0.105 0.105
-0.162 0.072 0420 533 510
-0.005 533 552
-0.102 0.102
-0.158 0.074 0425 533.505
-0.005 533.543
-0 098 0.098
-0.153 0.077 0430 533 499
-0 006 533.538
-0 097 0.097
-0.148 0.069 0435 533.496
-0003 533 531
-0.094 0 094
-0.143 0.073 0440 533 492
-0.004 533 525
-0.089 v.089
-0.138 0 071 0445 533.486
-0.007 533 520
-0089 0.089
-0.135 0.066 0450 533 479
-0.006 533.511
-0088 0.088
-0.133 0.069 0455 533.475
-0 005 533.508
-0.085 0 085
-0.129 0.064 0500 533.470
-0.005 533 502
-0.083 0 083
-0.125 0.061 0505 533 463
-0007 533 496
-0.081 0 081
-0.122 0.055 0510 533.456
-0.007 533 490
-0080 0 080
-0.118 0.050 0515 533.450
-0 006 533483
-0 078 0 078
-0.114 0.050 0520 533.442
-0.008 533 476
-0 076 0.076
-0.111 0.043 0525 533.438
-0.004 533.472 0 072 0 072
-0.108 0.040 0530 533.430
-0.007 533.465
-0.074 0.074
-0.106 0.038 0535 533 425
-0006 533 460
-0 071 0 071
-0.103 0.032 0540 533.420
-0.005 533 456
-0 069 0 069
-0.101 0.029 0545 533 417
-0.003 533 451
-0.069 0 069
-0097 0.028 0550 533 415
-0 001 533 447
-0.064 0.064
-0.094 0.030 0555 533.409
-0.006 533,442
-0,066 0.066
-0.093 0.027 0600 533 402
-0006 533.436
-0066 0.066 0092 0.025 0605 533.398
-0.004 533 430
-0.065 0.065
-0.089 0.025 0610 533.395
-0004 533 425
-0.064 0 064
-0.087 0.025 0615 533.392
-0 003 533.421
-0.062 0.062
-0.083 0.025 0620 533.390
-0.002 533 416
-0000 0 060
-0.081 0.029 Page 2 of 2 i
Reactor Containment Building Integrated Leak Rate Test IIOpe Creek Generating Station, April 1994 L
Appendix C - Type A Test Data (T0tal Time Calculation)
LEAST UPPER CORRECTED SQUARES CONFIDENCE VAPOR DEW AIR FIT LEVEL MEASURED TIME TEMPERATURE-PRESSURE POINT PRESSURE LEAK 7 TATE LEAK RATE LEAK RATE
(*R)
(psi)
(*F)
(pala)
(% per day)
(% per day)
(% per day)
April 12,1994 0620 533.390 0.3573 69.537 63.759 0625 533.386 0.3574 69.538 63.758 0.18719 0630 533.381 0.3573 69.535 63.757 0.1535 0.15352 0635 533.380 0.3573 69 532 63.756 0.1719 0.43881 0.18N 3 0640 533.377 0.3573 69.533 63.756 0.1910 0.30422 0.20017 0645 533.374 0.3574 69 539 63.755 0.1987 0.26707 0.19930 0650 533.368 0.3573 69.533 63.754 0.1855 0.26058 0.16709 0655 533.366 0 3574 69.540 63.753 0.1845 0.24088 0.18160 0700 533 364 0 3573 69.536 63.752 0.1878 0.23645 0.19106 0705 533.300 0 3573 69.533 63.752 0.1873 0.23051 0.18413 0710 533.356 0.3574 69 540 63.751 0.1854 0.22521 0.17979 0715 533.353 0.3574 69.543 63.750 0.1826 0.22009 0.17515 0720 533 350 0.3573 69 536 63.750 0.1798 0.21512 0.17284 0725 533.349 0.3574 69.540 63.749 0.1807 0.21348 0.18372 0730 533.346 0.3575 69.546 63.748 0.1810 0.21176 0.18203 0735 533.343 0.3575 69.551 63.747 0.1811 0.21023 0.18164 0740 533.345 0.3576 69.554 63.747 0.1844 0.21424 0.19583 0745 533.339 0.3576 69.556 63.746 0.1846 0 21226 0.18437 0750 533.337 0.3575 69.553 63.745 0.1850 0.21154 0.18560 0755 533.336 0.3576 69.558 63.745 0.1856 021112 0.18684 0800 533.331 0.3575 69 551 63.744 0.1843 0.20954 0.17723 0805 533.329 0.3574 69.539 63 744 0.1823 0.20766 0.17206 0810 533.330 0.3576 69 556 63.743 0.1822 0.20626 0.18192 0815 533.331 0 3576 69 555 63.742 0.1831 0.20663 0.18748 0820 533.332 0.3576 69.558 63.742 0.1850 0.20874 0.19466 0825 533.333 0.3577 69.565 63 741 0.1876 0.21222 0.20152 0830 533 330 0.3576 69.554 63.740 0.1891 0.21272 0.19606 0835 533.328 0.3575 69.552 63.740 0.1900 0.21284 0.19259 0840 533 327 0.3575 69.553 63.739 0.1908 0 21315 0.19329 0845 533 324 0.3575 69.553 63.739 0.1910 0.21282 0.18901 0850 533.320 0.3S76 69.559 63.738 0.1906 0 21223 0.18518 0855 533.324 0.3577 69.567 63.738 0.1914 0.21249 0.19394 0900 533 320 0.3577 69.564 63.737 0.1914 0.21214 0.18863 0905 533.323 0.3577 69.566 63.737 0.1921 0.21251 0.19471 0910 533.324 0.3578 69.574 63.736 0.1931 0.21315 0 19705 0915 533.320 0.3577 69266 63.736 01931 0.21285 0.18979 0920 533.316 0.3578 ci9 571 63 735 0.1927 0.21242 0.18618 0925 533.318 0.3578 69 576 63.735 0.1930 0.21219 0.19168 0930 533.318 0.3578 69.571 63.734 0.1930 0.21196 0.18960 0935 533 314 0.3578 69 575 63.734 0.1927 0.21158 0 18671 0940 533.317 0.3578 69.574 63.733 0.1927 0.21125 0.18959 0945 533.321 0.3580 69.588 63.733 0.1935 0.21190 0.19814 0950 533.323 0.3580 69.592 63.732 0.1943 0.21255 0.19916 0955 533.323 0.3580 69.589 63.732 0.1951 0 21314 0.19947 1000 533.323 0.3581 69.599 63.731 0.1959 021380 0.20063 1005 533 322 0.3580 69 593 63.731 0.1965 0.21412 0.19862 1010 533 323 0.3581 69 602 63.730 0.1972 0.21465 0.20058 1015 533.322 0 3582 69.608 63.730 0.1979 0.21510 0.20058 1020 533 320 0.3582 69 603 63.730 0 1982 0 21516 0.19671 1025 533 318 0.3580 69595 63.729 0.1981 0.21507 0.19291 1030 533.319 0.3582 69 606 63.729 0.1983 0.21499 0.19505 Page 1 of 2
1 Reactor Containment Building Integrated Leak Rate Test 11 ope Creek Generating Station, April 1994-Appendix C (continued) 4 LEAST UPPER CORRECTED SQUARES CONFIDENCE VAPCR DEW AIR FIT LEVEL MEASURED 11ME TEMPERATURE PRESSURE POINT PRESSURE LEAK RATE LEAK RATE LEAK RATE CR)
(psi)
(F)
(psla)
(% per day)
(% per day)
(% per day) 4 1035 533.322 0.3581 69.598 63.728 0.1986 0.21508 0.19757 1040 533.321 0.3582 69.603 63.728 0.1988 0.21516 0.19710 1045 533.320 0.3583 69.614 63 728 0.1990 0 21519 0.19639 1050 533 326 0.3584 69.621 63 727 0.1996 0.21562 0.20227 1055 533.325 0.3584 69.624 63.727 0.2001 0 21595 0.20170 1100 533.325 0.3584 69.624 63 726 0.2005 0.21620 0.20085 1105 533.321 0.3583 69 611 63.726 0.2005 0.21618 0.19482 1110 533 330 0.3584 69.622 63.726 0.2010 0.21654 0.20362 1115 533 329 0.3583 69 617 63.725 0.2015 0.21679 0.20194 1120 533.327 0.3583 69 614 63.725 0.2017 0 21688 0.19906 1125 533.329 0.3584 69 623 63.724 0.2020 0.21703 0.20092 1130 533.326 0.3583 69 615 63.724 0.2020 0.21705 0.19652 1135 533.330 0.3584 69 620 63 724 0.2022 0.21711 0.20060 1140 533.330 0 3583 69.615 63.723 0.2024 0 21721 0.19989 1145 533 333 0.3584 69.619 63 723 0 2027 0.21737 0.20176 1150 533.330 0.3584 69.623 63.723 0.2029 0.21742-0.19898 1155 533.331 0.3582 69 610 63.723 0.2028 0.21742 0,19692 1200 533.336 0.3584 69.622 63.722 0.2031 0.21750 0.20195 1205 533.337 0.3584 69 622 63.722 0.2034 0.21765 0.20194 1210 533 333 0.3583 69 612 63.721 0.2033 0 21767 0.10719 1215 533.335 0.3583 69 618 63.721 0.2034 0.21764 0.19887 1220 533.335 0.3582 69 610 63.721 0.2034 0.21763 0.19815 1225 533 334 0.3583 69.619 63.721 0.2033 0.21760 0.19596 1230 533.332 0.3584 69.623 63.720 0.2032 0.21752 0.19491 1235 533.330 0.3584 69 621 63.720 0.2030 0.21744 0.19310 1240 533.333 0.3584 69.621 63.719 0.2028 0.21726 0.19449 1245 533.331 0.3585 69 630 63.719 02025 0.21716 0.19255 1250 533.334 0.3585 69.628 63.719 0.2024 0 21697 0.19384 1255 533.334 0.3586 69.636 63.718 0.2021 0 21684 0.19289 1300 533.335 0.3586 69.643 63.718 0.2020 0.21667 0.19398 1305 533 342 0.3587 69.644 63.718 0.2020 0.21656 0.19815 1310 533.346 0.3587 69.649 63.717 0.2022 0.21659 0.20006 1315 533.346 0.3588 69 654 63.717 0.2023 0.21661 0.19930 1320 533.349 0.3587 69.646 63.117 0.2024 0.21662 0.19921 1325 533 347 0.3586 69 637 63.717 0 2023 0.21659 0.19641 1330 533.347 0.3587 69 644 63.716 0.2022 0.21651 0.19562 1335 533.354 0.3587 69.651 63.716 0.2023 0.21646 0.19949 1340 533.356 0.3588 69 658 63.716 0.2025 0.21652 0.20095 1345 533.356 0.3587 69 651 63.716 0.2025 0.21653 0.19865 1350 533.357 0 3587 69 647 63.716 0.2025 0.21650 0.19779 1355 533.359 0.3587 69.644 63.715 0.2025 0.21646 0.19814 1400 533.362 0.3587 69.652 63.715 0.2026 0.21644 0.19899 1405 533.361 0.3587 69.650 63.715 0 2026 0.21642 0.19830 1410 533.364 0.3587 69.644 63.715 0.2026 0.21639 0.19824 1415 533.366 0.3587 69 651 63 714 0.2027 0.21636 0.19878 1420 533.371 0.3589 69.661 63.714 0.2028 0.21640 0.20121 1425 533.373 0.3588 69 658 63.714 0.2029 0.21646 0.20118 1430 533.375 0.3588 69 658 63.714 0.2030 0.21649 0.20045 1435 533 375 0.3589 69.664 63.713 0.2031 0.21651 0.20004 1440 533.380 0 3589 69f>62 63.713 0 2032 0.21656 0.20149 1445 533.379 0.3588 69 659 63.713 0.2033 0.21657 0.19995 1450 533.381 0.3589 69 665 63.713 0 2033 0.21659 0.20027 Page 2 of 2 y
Reactor Containment Building Integrated Leak Rate Test IIope Creek Generating Station, April 1994 i
Appendix D - Type A Test Data (Mass Point Calculation)
LEAST UPPER CORRECTED SQUARES CONFIDENCE VAPOR DEW AIR CONTAINMENT FIT LEVEL l
TIME TEMPERATURE PRESSURE POINT PRESSURE A!R MASS LEAK RATE LEAK RATE
('R)
(psi)
(*F)
(psla)
(Ibm)
(% per day)
(% per day)
April 12,1994 0340 533 559 0 3576 69.555 63.796 97738.77 0345 533.555 0.3577 69 563 63.795 97737.30 0350 533.543 0.3576 69.555 63.793 97737.41 0.20143 0355 533.540 0.3576 69 556 63.792 97735 95 0.24678 0 44028 0400 533.534 0.3576 69 561 63 791 97735.15 0 25346 0.34332 0405 533 529 0.3576 69 559 63.789 97734.06 0.26487 0.31995 0410 533 523 0.3575 69.551 63.788 97733.30 0.26458 0.30142 0415 533.515 0.3576 69.555 63.787 97732.77 0.25546 0.28385 0420 533 510 0.3576 69 557 63 786 97731.73 0 25458 0.27604 0425 533 505 0.3575 69 553 63.784 97730 63 0.25796 027515 0430 533.499 0.3575 69.553 63.783 97729 98 0.25676 0 27065 0435 533 496 0 3576 69.559 63.782 97728 38 0.26443 0.27840 0440 533.492 0 3576 69.561 63 780 97727.13 0 27250 0.28687 0445 533.486 0 3576 69 554 63.779 97726.59 0.27432 0.28668 0450 533 479 0 3575 69 552 63.778 97725.77 0.27468 0.28533 0455 533 475 0 3575 69 547 63.777 97725 08 0.27334 0.28270 0500 533.470 0.3575 69.552 63 776 97724.13 0.27258 0.28083 0505 533 463 0.3575 69.551 63.774 97723 33 0.27139 0.27879 0510 533.456 0.3575 69 548 63 773 97722 90 0.26825 0.27556 0515 533.450 0.3575 69.552 63 772 97721.95 0.26610 0.27300 0520 533.442 0 3575 69.546 63.771 97721.85 0.26145 0.26921 0525 533 438 0.3576 69 555 63 770 97720.89 0.25821 0.26595 0530 533.430 0.3575 69 553 63.769 97720.52 0 25412 0.26226 0535 533 425 0 3574 69.545 63.768 97720.05 0.24983 0.25840 0540 533.420 0 3574 69.538 63 767 97719 45 0.24582 0.25463 0545 533.417 0.3575 69.552 63.766 97718.28 0.24350 0.25194 0550 533.415 0.3574 69.543 63.765 97717.09 0.24251 0 25037 0555 533.409 0 3575 69.547 63.764 97716,72 0.24074 0.24823 0600 533.402 0.3574 69.539 63.763 97716 57 0.23795 0.24544 0605 533.398 0 3574 69 537 63.762 97715.77 0.23568 0.24301 0610 533.395 0.3574 69.539 63 761 97715 04 0 23369 0.24081 0615 533 392 0.3574 69 538 63.760 97713.97 0 23252 0.23928 0620 533 390 0 3573 69.537 63 759 97712.82 123211 0.23847 0625 533.386 0.3574 69.538 63.758 97712.19 0.23154 0.23755 0630 533.381 0 3573 69.535 63 757 97711.78 0 23053 0.23628 0635 533.380 0 3573 69.532 63 756 97710.97 0 22973 0 23520 0640 533.377 0 3573 69.533 63 756 97710.11 0 22914 0 23435 0645 533 374 0 3574 69.539 63 755 97709 45 0 22851 0 23348 0650 533 368 0.3573 69.533 63.754 97709.42 0 22712 0.23202 0655 533 366 0 3574 69.540 63 753 97708.51 0 22608 0.23084 0700 533 364 0.3573 69 536 63.752 97707.64 0.22529 0.22988 0705 533.360 0.3573 69 533 63.752 97707.20 0.22429 0.22876 0710 533.356 0.3574 69 540 63.751 97706.73 0.22315 0.22755 0715 533.353 0.3574 69 543 63 750 97706 29 0.22188 0.22626 0720 533 350 0 3573 69.536 63.750 97705.79 0 22055 0.22493 0725 533.349 03574 69.540 63.749 97704.72 0 21965 0 22393 0730 533 346 0.3575 69 546 63 748 97704.18 0.21871 0 22290 0735 533 343 0.3575 69 551 63 747 97703 58 0.21776 0.22188 0740 533 345 0 3576 69 554 63.747 97702.20 0.21740 0,22136 0745 533.339 0 3576 69 556 63.746 97702.19 0 21657 0.22046 0750 533 337 0.3575 69 553 63.745 97701.49 0.21581 0.21961 Page 1 of 3
Reactor Containment Building Integrated Leak Rate Test Hope Creek Generating Station, April 1994 Appendix D (continued) l LEAST UPPER CORRECTED SQUARES CONFIDENCE VAPOR DEW AIR CONTAINMENT FIT LEVEL VME TEMPERATURE PRESSURE POINT PRESSURE AIR MASS
. LEAK RATE LEAK RATE
(*R)
(psi)
("F)
(psla)
(ibm)
(% per day)
(% per day) 0755 533.336 0 3576 69.558 63.745 97700.78 0.21512 0.21884 0800 533.331 0.3575 69.551 63.744 97700.80 0.21404 0.21777 0805 533.329 0.3574 69.539 63.744 97700.57 0.21278 0.21657
)
0810 533.330 0.3576 69.556 63.743 97699.25 0.21200 0.21573 i
0815 533.331 0.3576 69.555 63.742 97698.20 0.21149 0.21511
]
0820 533.332 0.3576 69.558 63.742 97696.08 0.21129 0.21479 0825 533.333 0.3577 69.565 63.741 97695.73 0.21139 0.21477
)
0830 533.330 0.3576 69.554 63.740 97695.53 0.21122 0.21449 J
0835 533.328 0.3575 69.552 63.740 97695.19 0.21088 0.21406 i
0840 533.327 0.3575 69.553 63.739 97694.47 0.21058 0.21367 0845 533.324 0.3575 69.553 63.739 97694.23 0.21009 0.21311 0850 533.320 0.3576 69.559 63.738 97693.08 0.20945 0.21244 0855 533.324 0.3577 69.567 63.738 97692.43 0.20922 0.21212 0900 533.320 0 3577 69.564 63.737 97692.35 0.20875 0.21160 0905 533.323 0.3577 69.566 63.737 97691.03 0.20856 0.21133 i
0910 533.324 0.3578 69.572 63.736 97690.10 0.20848 0.21117 0915 533.320 0.3577 69 566 63.736 97690 29 0.20807 0.21071 0920 533.316 0.3578 69.571 63.735 97690.09 0.20751 0.21013 0925 533.318 0.3578 69.576 63.735 97688.77 0.20721 0.20977 0930 533.318 0.3578 69.571 63.734 97688.38 0.20683 0.20935 0935 533.314 0.3578 69.575 63.734 97688 13 0.20633 0.20882 0940 533.317 0.3578 69.574 63 733 97687.10 0.20598 0.20842 0945 533.321 0.3580 69.588 63.733 97685.27 0.20601 0.20839 i
0950 533.323 0.3580 69.592 63.732 97684.45 0.20608 0.20840 0955 533.323 0 3580 69 569 63.732 97683.73 0.20615 0.20841' l
1000 533.323 0.3581 69 599 63 731 97682.88 0.20626 0.20846 1005 533.322 0.3580 69.593 63.731 97682.51 0.20627 0.20841 1
1010 533.323 0.3581 69.602 63.730 97681.52 0.20636 0.20844 l
1015 533.322 0 3582 69 608 63.730 97680.84 0.20643 0.20847
]
1020 533.320 0.3582 69.603 63.730 97680.80 0.20633 0.20832 j
1025 533 318 0.3580 69.595 63.729 97680.77 0.20606 0.20801 1030 533.319 0.3582 69 606 63.729 97679.75 0.20588 0.20780 1035 533.322 0.3581 69 598 63.728 97678.65 0.20583 0.20770 1040 E33.321 0.3582 69.603 63.728 97678.06 0.20574 0.20757 1045 533.320 0.3583 69.614 63.728 97677.52 0.20563 0.20742 1050 533.326 0.3584 69.621 63.727 97675.77 0.20576 0.20752 -
1055 533 325 0.3584 69.624 63.727 97675 20 0.20586 0.20758 1100 533.325 0 3584 69.624 63.726 97674.67 0.20592 0.20760 1105 533.321 0.3583 69.611 63.726 97675.16 0.20571 0.20737 i
1110 533.330 0 3584 69.622 63.726 97672.77 0.20588 0.20750 i
1115 533.329 0 3583 69.617 63.725 97672.41 0.20597 0.20756 1120 533.327 0.3583 69 614 63 725 97672.31 0.20592 0.20748 l
1125 533.329 0.3584 69.623 63.724 97671.26 0.20596 0.20748 1130 533.326 0.3583 69.615 63.724 97671.50 0.20580
' O.20730 1135 533 330 0.3584 69.620 63.724 97669.96 0.20582 0.20729 1140 533.330 0.3583 69 615 63.723 97669.43 0.20580 0.20724 1145 533 333 0 3584 69.619 63.723 97668.34 0.20586 0.20727 1150 533.330 0.3584 69.623 63.723 97668.28 0.20580 0.20718 1155 533.331 0.3582 69.610 63.723 97668 07 0.20565 0.20701 1200 533.336 0.3-84 69.622 63 722 97666.25 0.20571 020705 1205 533.337 0.3584 69 622 63.722 97665.56 0.20576 0.20707 Page 2 of 3
Reactor Containment Building Integrated Leak Rate Test o
II0pe Creek Generating Station, April 1994 Appendix D (continued)
LEAST UPPER i
CORRECTED SOUARES CONFIDENCE VAPOR DEW AR CONTAINMENT FIT LEVEL TIME TEMPERATURE PRESSURE POINT PRESSURE AIR MASS LEAK RATE LEAK RATE
(*R)
(psi)
(*F)
(psia)
(Ibm)
(% per day)
(% per day) j 1210 533 333 0 3583 69.612 63.721 97666 01 0.205S3 0.20692 1215 533 335 0.3583 69 618 63.721 97664.94 020555 0.20682 1220 533 335 0.3582 E9 610 63.721 97664.44 0.20546 0.20670 1225 533 334 0.3583 69.619 63.721 97664.30 0.20528 0.20651 1230 533.332 0.3584 69 623 63.720 37663 91 0.20506 0.20629 1235 533.330 0 3584 69.621 63 720 97663.70 0.20478 0.20602 1240 533.333 0.3584 69.621 63 719 97662.69 0 20457 0.20580 1245 533.331 0 3585 69 630 63.719 97662.54 0.20428 020552 1250 533 334 0.3585 69 628 63.719 97661.55 0.20406 0.20529 1255 533 334 0 3586 69 636 63.718 97661.14 0.20380 0.20504 1300 533.335 0.3586 69 643 63 718 97660.19 0.20360 0.20483 1305 533.342 0 3587 69 644 63 718 97668 39 0.20355 0.20476 1310 533.346 0 3587 69 649 63.717 97657.18 0.20358 020477 1315 533.346 0.3588 69 654 63.717 97656.72 0.20357 0.20474 1320 533 349 0.3587 69 646 63.717 97656.07 0.20356 0.20471 1325 533.347 0 3586 69 637 63.717 97656.20 0 20345 0.20459 1330 533 347 0 3587 69 644 63316 97655.76 0.20331 0.20444 1335 533 354 0.3587 69 651 63.716 97653 96 0.20332 0.20442 1340 533.356 0.3588 69 658 63.716 97652.85 0.20337 0.20446 1345 533 356 0 3587 69.651 63 716 97652.86 0.20334 0.20441 1350 533.357 0 3587 69 647 63.716 97652.45 0.20328 0.20433 1355 533.359 0.3587 69 644 63.715 97651.67 0.20323 0.20427 1400 533.362 0.3587 69.652 63.715 97650.73 0.20321 0.20423 1405 533 361 0.3587 69.650 63.715 97650.27 0.20317 0.20417 1410 533.364 0.3587 69 644 63.715 97649.63 0.20312 0.20411 1415 533 366 0.3587 69.651 63.714 97648 77 0 20309 0.20407 1420 533.371 0.3589 69 661 63.714 97647.31 0.20315 0.20411 1425 533.373 0.3588 69 658 63.714 97646.64 0.20320 0 20415 1430 533 375 0.3588 69 658 63 714 97646.20 0.20323 n20416 1435 533.375 0.3589 69 664 63.713 97645.66 0.20324 0.20416 1440 533.380 0.3589 69.662 63.713 97644 48 0.20329 0.20420 1445 533.379 0 3S88 69 659 63.713 97644.33 0 20329 0.20419 1450 533.381 0 3589 69 665 63.713 97643.54 0.20331 0 20419 Page 3 of 3
Reactor Containment Building Integrated Leak Rate Test H0pe Creek Generating Station, April 1994 Appendix E - Supplemental Test (T0tal Time Calculation)
GROSS GROSS NET NET LEAST UPPER LEAST UPPER SQUARES CONFIDENCE SQUARES CONFIDENCE FIT LEVEL SUPERIMPOSED FIT LEVEL TIME MASS LEAK RATE LEAK RATE LEAK RATE LEAK RATE LEAK RATE (Ibm)
(% per day)
(% per day)
(scfm)
(% per day)
(% per day) 1 April 12,1994 1610 97611 4.470
-04957 4 4957 1615 97609 06636 4.470 0.1679
-04957 1620 97606 0 6765 1.3842 4.470 0.1808 0.8884 1625 97604 0.6671 0 9288 4 470 0.1713 0.4331 1630 97602 06559 0 8246 4 470 0.1601 0.3289 1635 97600 0.6521 0.7876 4 470 0.1564 0 2918 1640 97598 0.6478 0.7615 4 470 0.1520 0.2657 1645 97595 0 6579 0.7751 4.470 0.1622 0.2793 1650 97592 0 6639 0.7701 4.470 0.1682 0.2744 1655 97590 0 6683 0.7664 4.470 0.1725 0.2706 1700 97588 0.6680 0.7569 4.470 0.1722 0.2611 1705 97585 0.6725 0 75-7 4.470 0.1767 0.2628 1710 97583 0.6731 0.7529 4.470 0.1772 0.2570 1715 97582 0 6706 0.7454 4 470 0.1747 0.2495 1720 97579 0.6713 0.7429 4.470 0.1754 0.2471 1725 97576 0.6729 0 7420 4.470 0.1771 0.2462 1730 97574 0 6722 0.7379 4.470 0.1764 0.2420 1735 97572 0.6721 0.7352 4 470 0.1762 0.2394 1740 97570 0.6717 0.7324 4 470 0.1758 0.2365 1745 97568 0.6708 0.7293 4.470 0.1749 0.2334 1750 97565 06702 0.7269 4.470 0.1743 0.2309 1755 97563 0 6693 0.7242 4.470 0 1734 0 2282 1800 97561 0 6689 0.7222 4.470 0.1729 0.2263 1805 97559 06682 0.7200 4.470 0.1722 0.2240 1810 97556 0 6G82 0.7188 4.470 0.1722 0.2229 1815 97554 0.6682 0.7177 4.470 0.1722 0.2217 1820 97552 0.6678 0.7161 4.470 0.1718 0.2201 1825 97550 0 6674 0 7146 4.470 0.1714 0 2186 1830 97548 0 6667 0.7128 4.470 0.1707 0.2168 1835 97545 0.6G60 0.7112 4.470 0 1700 0 2152 1840 97543 0.6652 0.7095 4.470 0.1692 0.2134 1845 97541 0 6648 0.7081 4 470 0.1687 0.2121 1850 97538 06C45 0.7072 4.470 0.1685 0 2111 1855 97537 0.6636 0.7054 4.470 0.1675 02094 1900 97534 0.6630 0,7041 4.470 0.1669 0.2080 1905 97533 0 6622 0.7025 4 470 0.1661 0.2064 1910 97530 0 6612 0.7010 4.470 0.1651 0.2048 1915 07b27 06610 0.7002 4.470 0.1649 0.2041 1920 97525 0 6609 0.6996 4.470 0.1647 0.2035 1925 97523 0 6604 0 6985 4.470 0.1642 0.2023 1930 97521 0 6597 0 6972 4.470 0.1636 0.2011 1935 97519 0.6590 0 6960 4.470 0.1628 0.1998 1940 97517 0.6582 0 6947 4.470 0 1620 0.1985 1945 97515 0 6576 0 6936 4.470 0.1615 0.1974 1950 97513 0 6569 06924 4 470 0.1607 0.1962 1955 97511 0.6564 0 6914 4 470 0 1602 0.1952 2000 97509 0.6557 06904 4 470 0 1595 0.1942 2005 97507 06550 0 6892 4.470 0 1588 0.1930 2010 97504 0.6544 0 6882 4 470 0 1582 0 1920 2015 97502 0 6537 06872 4 470 0.1575 0.1909 Page 1 of 2
Reactor Containment Building Integrated Leak Rate Test.
Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS
~
~
1 RCSV-0643A 03/17/94 al 3 000 1 RCSV-0643B 12/11/90 atal 7.500 1 RCSV-06438 09/26/92 afial 10 500 1 RCSV-06438 03/17/94 af/al 15 000 Contabrnent Penetraten P229A - 22.5" Doncomer 1GPXJN-37A I 12/27/90 af/..
8000 Test results include 1GPXJN-37A O 1GPXJN-3781,1GPXJN-37B O 1GPXJN-37A 1 09/26,92 a f. st 7.500 Test results include 1GPXJN-37A O.1GPXJN-37B 1,1GPXJN-378 O 1GPXJN-37A I 02/28S4 a f/a' O000 Test results include 1GPXJN "i7A O.1GPXJN-378 t 1GPXJN-37B O 1GPXJN-37A O 12/27/90 af!al 8.000 Test results include 1GPXJN-37A t,1GPXJN-3781,1GPXJN-37B O 1GPXJN-37A O 09/26/92 af/al 7.500 Test results include 1GPXJN-37A I,1GPXJN-37B 1,1GPXJN-37B O 1GPXJN-37A O 02/28!94 af!al u 002 Test results include 1GPXJN-37A 1,1GPXJN-37B 1,1GPXJN-378 O Containment Penetraten P22SB - 67.5* Downcomer 1GPXJN-3781 12/27/90 aflal 8 000 Test results include 1GoxJN-37A 1,1GPXJN-37A O,1GPXJN-378 0 1GPXJN-3781 09/26/92 afal 7.500 Test results include 1GPXJN-37A 1,1GPXJN-37A O,1GPXJN-37B O 1GPXJN-37B I 02/28/94 af!al 0000 Test results include 1GPXJN-37A 1,1GPXJN-37A O,1GPXJN-37B O 1GPXJN-37B O 12/27/90 af/al 8.000 Test results include 1GPXJN-37A I,1GPXJN-37A O,1GPXJN-378 I 1GPXJN-378 0 09/26/92 af!al 7.500 Test results include 1GPXJN-37A I,1GPXJN-37A O,1GPXJN-3781 1GPXJN-378 O 02/28/94 af!al 0000 Test resuiis include 1GPXJN-37A I,1GPXJN-37A O 1GPXJN-378 i Containment Penetraton P229C - 112.5* Downcomer 1GPXJN-37C I 01/01/91 af/al 4.000 Test results include 1GPXJN-37C O,1GPXJN-37D 1,1GPXJN-37D O 1GPXJN-37C 1 09/26/92 afal 8 500 Test results include 1GPXJN-37C O,1GPXJN-37D I,1GPXJN-37D O 1GPXJN-37C 1 02/28S4 af/al 5.000 Test results include 1GPXJN-37C O,1GPXJN-37D 1,1GPXJN-37D O 1GPXJN-37C O 01/01/91 af/al 4 000 Test results include 1GPXJN-37C I,1GPXJN-37D 1,1GPXJN-37D O 1GPXJN-37C O 09/26/92 atal 8,500 Test results include 1GPXJN-37C I,1GPXJN-37D 1,1GPXJN-37D O 1GPXJN-37C O 02/28/94 af/al 5 000 Test resutts include 1GPXJN-37C 1,1GPXJN-37D I,1GPXJN-37D O Contahment Penetration P22SD - 157.5* Downcomer 1GPXJN-37D I 01/01/91 af/al 4,000 Test results include 1GPXJN-37C 1,1GPXJN-37C O,1GPXJN-37D O 1GPXJN-37D 1 09/2S/92 af/al 8.500 Test results include 1GPXJN-37C 1,1GPXJN-37C O 1GPXJN-37D O 1GPXJN-37D I 02/28/94 aflal 5.000 Test results include 1GPXJN-37C I,1GPXJN-37C O,1GPXJN-370 0 1GPXJN-37D O 01/01/91 af!al 4.000 Test results include 1GPXJN-37C 1,1GPXJN-37C O,1GPXJN-37D 1 1GPXJN-37D O 09/26/92 af!al 8.500 Test results include 1GPXJN-37C 1,1GPXJN-37C 0,1GPXJN-37D 1 Page 32 of 46
Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1GPXJN-37D 0 02/28/94 aral 5.000 Test results include 1GPXJN-37C 1,1GPXJN-37C O,1GPXJN-3701 Containment Penetraton P229E - 202.5* Downcomer 1GPXJN-37E I 01/01/91 af/al 9 000 Test results include 1GPXJN-37E O,1GPXJN-37F 1,1GPXJN-37F O 1GPXJN-37E I 09/25S2 af!al 0000 Test results include 1GPXJN-37E O,1GPXJN-37F I,1GPXJN-37F O 1GPXJN-37E I 03/01/94 af/al 6 000 Test results include 1GPXJN-37E O,1GPXJN-37F l.1GPXJN-37F O 1GPXJN-37E O 01/01/91 aUal 9.000 Test results include 1GPXJN-37E 1,1GPXJN-37F I,1GPXJN-37F O 1GPXJN-37E O 09/25/92 af/al 0000 Test results include 1GPXJN-37E 1,1GPXJN-37F I,1GPXJN-37F O 1GPXJN-37E O 03/01/94 afial 6.000 Test results include 1GPXJN-37E 1,1GPXJN-37F 1,1GPXJN-37F O Containment Penetration P229F - 227.5* Downcomer 1GPXJN-37F i 01/01/91 af/al 9.000 Test results include 1GPXJN-37E I,1GPXJN-37E O,1GPXJN47F O r
1GPXJN-37F 1 09/25/92 af/al 0.000 Test resdts include iGPXJN-37E I,1GPXJN-37E 0,1GPXJN-37F 0 1 GPXJN-37F I 0301/94 af/al 6.000 Test results include 1GPXJN-37E I,1GPXJN-37E O,1GPXJN-37F 0 1GPXJN-37F O 01/01/91 af/a!
9.000
. Test results include 1GPXJN-37E I,1GPXJN-37E O,1GPXJN-37F i 1GPXJN-37F O 09/25/92 af!al 0.000 Test results include 1GPXJN-37E 1,1GPXJN-37E O,1GPXJN-37F i 1GPXJN-37F O 0321/94 at/al 6.000 Test results include 1GPXJN-37E 1,1GPXJN-37E O.1GPXJN-37F i Contahment Penetration P229G - 292.5* Downcomer 1GPXJN-37G l 01/01/91 af/al 3.000 Test results include 1GPXJN-37G O,1GPXJN-37H I,1GPXJN 37H O 1GPXJN-37G l 09/25/92 afial 0.000 Test results include 1GPXJN-37G O,1GPXJN-37H I,1GPXJN-37H O 1GPXJN-37G l 03!O1/94 af!al O000 Test results include 1GPXJN-37G O,1GPXJN-37H I,1GPXJN-37H O 1GPXJN-37G O 01/01/91 aftal 3.000 Test results include 1GPXJN-37G I,1GPXJN-37H 1,1GPXJN-37H O 1GPXJN-37G O 09/25/92 af/al 0000 Test results include 1GPXJN-37G I,1GPXJN-37H I,1GPXJN-37H O 1GPXJN-37G O 03/01/94 aftal 0.000 Test results include 1GPXJN-37G I,1GPXJN-37H 1,1GPXJN-37H O Contahment Pemtration P229H - 337.5* Dene.was 1GPXJN-37H I 01/01/91 aUal 3.000 Test results include 1GPXJN-37G I,1GPXJN-37G O,1GPXJN-37H O 1GPXJN-37S i 09/25/92 af/al 0000 Test results include 1GPXJN-37G 1,1GPXJN-37G O,1GPXJN-37H O i
1GPXJM-37H I 03/01/94 af/al 0.000 Test results include 1GPXJN-37G 1,1GPXJN-37G 0,1GPXJN-37H O 1GPXJN-37H O 01/01/91 aral 3 000 Test results include 1GPXJN-37G 1,1GPXJN-37G O,1GPXJN-37H I 1GPXJN-37H O 09/25/92 af/al 0.000 Test results include 1GPXJN-37G 1,1GPXJN-37G O,1GPXJN-37H I 1GPXJN-37H O 03/01/94 af/al 0 000 Test results include 1GPXJN-37G I,1GPXJN-37G 0,1GPXJN-37H l Contahment Penetraton J38 - Hydrogen-Oxygen Analyzer 1GSHV-49558 01/18/91 af/al 10.900 1
Page 33 of 46
Reactor Containment Building Integrated Leak Rate Test-IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS 1GSHV-4955B 04/29/92 af 3 000 1GSHV-49550 04/30/92 al 6.000 1GSHV-49558 09/26/92 af/al 4.500 1GSHV-49558 03/10/94 af/al 5.700 1GSHV-4983B 01/18/91 af/al 24.000 1GSHV-4983B 04/29/92 af 47.000 1GSHV-49830 04/30/92 al 12.000 1GSHV-49838 09/26/92 afal 5.500 1GSHV-49838 03/10/94 afat 3.000 Containment Penetration J5A - Drywet Leak Detectbn 1SKHV-4957 01/02/91 aftal 83.000 1SXHV-4957 09/21/92 af 91.000 1SKHV-4957 10/02/92 al 4 000 1SKHV-4957 03/17/94 af!al 17.000 1SKHV-4981 01/02!91 atal 20.000 1SKHV-4981 09/21/92 atal 75 000 1SXHV-4981 05/18!93 af
> 1.0 La 1SKHV-4981 05/18/93 al 2.000 1SKHV-4981 03/16/94 af/al 21 000 Containment Penetratbn J7D/J202 - Hydrogen-Oxygen Analyzer 1GSHV-49668 01/19/91 af/ai 103.000 1GSHV-4966B 09/29/92 af/al 175.000 1GSHV-4966B 03/14/94 af/al 65.000 1GSHV-49848 01/19/91 aftal 82.000 Test results include 1GSHV-4974,1GSHV-5022B 1GSHV-4984B 06/10/92 af 260.000 1GSHV-4984B 06/11/92 al 190.C00 1GSHV-49848 09/29/92 af/al 359 000 Test results include 1GSHV-4974.1GSHV-5022B 1GSHV 49848 03/10/94 af/al 200 000 1GSHV-50198 01/19/91 atal 14.000 1GSHV-50198 06/10/92 af 93.000 1GSHV-5019B 06/11/92 al 47.000 1GSHV-5019B 09/27/92 af/al 6.500 1GSHV-50198 03/10/94 af/a!
45.600 Page 34 of 46
Reactor Containment Building Integrated Leak Rate Test-Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS 1CSHV-5022B 01/19/91 a t'ai 82.000 Test results inctuae 1GSHV-4974,1GSHV-49848 1GSHV-50228 09/29/92 af/al 359 000 Test results include 1GSHV-4974,1GSHV-49848 1GSHV-5022B 03/14/94 aflat 545.000 Test woutts include 1GSHV-4974 Contariment Penetration J7D/J202 - Nitrogen Makeur 1GSHV-4974 01/1991 af/al 82 000 Test rest:'ts enclude 1GSHV-4984B,1GSHV-5022B 1GSHV 4974 09/29'92 a fial 359 000 Test results include 1GSHV-49848,1GSHV-50228 1GSHV-4974 10/11/92 af/al 178 000 1GCHV-4974 03/14/94 af 545.000 Test resvis hclude 1GSHV-50228 1GShV-4974 03/17/94 al 196.000 Contasiment Penetration J7E - PASS 1RCSV-0730A 12!13/90 af/al 0000 1RCSV4730A 09/26/92 atat 13000 1 RCSV-0730A 03/17/94 af!al 16.000 1RCSV-07308 12/13/90 af/al 3.500 1RCSV-07308 09/26/92 aflaf 10 000 1 RCSV-07308 03/17/94 af!al 6 000 Containment Penetration J8C - DryweN Leak Detection 1SKHV-5018 01/02/91 af/al 13 000 1S KHV-5018 09/21/92 af 45 000 1SKHV-5018 10/02/92 at 31.000 1SKHV-5018 03/18/94 afial 14 000 1SKHV-4953 01/02/91 aFat 3 000 1SKHV-4953 09/21/92 af/al 40 000 1SKHV-4953 05/18/93 aflat 4 000 1SKHV-4953 03/16/94 af/al 27.000 Containment Penetration J9E -Hydrogen 4xygen Analyzer 1GSHV-4955A 01/13/91 aflat 5000 1GSHV-4955A 04/15/92 af 2.000 1GSHV-4955A 04/16/92 at 3 000 1GSHV-4955A 10/01/92 al 0.000 1GSHV-4955A 03/10/94 af/al 10.500 1GSHV-4983A 01/13/91 af!al 9.000 1GSHV-4983A 04/15/92 af 9.000 Page 35 of 46
~
Reactor Containment Building Integrated Leak Rate Test -
llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1GSHV-4983A 04/16/92 al 0.000 1GSHV-4983A 10/01/92 al 82.000 1GSHV-4983A 03/10/94 atal 138.500 Containment Penetration J10C. Hydrogen-Oxygen Analyzer 1GSHV-5019A 01/14!91 afial 6.000 1GSHV-5019A 04/22/92 af 35.000 1GSHV-5019A 04'23/92 al 50 000 1GSHV-5019A 10/02/92 al 18.000 1GSHV-5019A 12/13/93 af
> 1.0 La 1GSHV-5019A 12/14'93 al 21.500 1GSHV-5019A 03/1034 al 5.000 1GSHV-4984A 01/14/91 af 64.000 1GSHV-4984A 02/03/91 at 4 000 1GSHV-4984 A 04/22/92 af 40.000 1GSHV-4984A 04/23S 2 at 75.000 1GSHV-4984A 08/12/92 al 102.000 1GSHV-4984 A 10/02/92 al 50.000 1GSHV-4984A 03/10/94 af/al 5.000 Contahment Penetration J10E - PASS 1RCSV-0731 A 12/20G0 af/al 4.500 1 RCSV-073
- A 09/26!92 af/al 13 200 1RCSV-0731 A 03/16/94 af/al 7.000 1 RCSV-C731 B 12/20/90 af/al 4.500 1 RCSV-07318 09/26/92 af/al 42.500 1RCSV-0731B 03/16/94 aflal 36.000 Contahment Penetraton J36C - CILRT Instrumentation 1GPV-120 12/31/90 af/al 0.000 1GPV-120 10/10/92 af/al 0000 1GPV-120 03/22/94 af/al 4.000 1GPV-122 12/31/90 aflal 7.000 1GPV-122 10/10/92 aflat 11.000 1GPV-122 03/22/94 af!al 8.ON Page 36 of 46
71eactor Containment Building Integrated Leak Rate Test llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS Containment Penetraton J36D - CILRT Instrumentaton 1GPV-001 12/31/90 af/al 7.000 1GPV-001 10/10/92 af/al 0000 1GPV-001 03/22/94 af!al 3.000 1GPV-002 12/31/90 af
> 1.0 La 1GPV-002 12/31/90 al 0.000 1GPV-002 10/10/92 af!al 21.000 1GPV-002 03/22/94 aval 10 000 Conta'iment Penetraton J50 - PASS s
1 RCSV-8903A 12/29/90 afial 2.900 1 RCSV-8903A 09/25/92 af/al 63.000 1RCSV-8903A 03/16/94 aflat 2.000 1RCSV49038 12/29GO af/al 32.900 1 R C*V-89039 09!26/92 aflat 38.000 1RCS 8MB 03/16/94 af/al 35 000 Contariment Penetration J201 - Hydrogen-Oxygen Analyzer 1GS HV-4966A 01/14!91 af/al 4.000 1GSHV-4966A 10/05/92 aftal 2.000 1GSHV-4966A 01/25/94 af 11.600 1GSHV-4966A 01/27/94 al 6.600 1GSHV-4966A 03/18/94 al 0000 1GSHV-5022A 01/14/91 aftal 2.000 1GSHV-5022A 10/05/92 af/al 0000 l
1GSHV-5022A 01/25!94 af 14.100 l
1GSHV-5022A 01/27/94 al 2.500 j
1GSHV-5022A 03/18/94 at 5.000 l
Contahment Penetration J206 - PASS l
1RCSV4728A 12/17/90 af/al 4.000 l
1 RCSV-0728A 09/26/92 af!al 35.800 f
1RCSV-0728A 03/15/94 atral 7.000 1RCSV-07288 12/17/90 af/al 3.000 1RCSV-07288 09/26/92 af/al 10.000 Page 37 of 46
Reactor Containment Building Integrated Leak Rate Test IIOpc Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1RCSV-07288 03/15!94 af!al 7.000 Contabment Penetraton J209 - CILRT Instrumentation 1GPV-004 01/08/91 af/al 148.500 1GPV-004 1009/92 af 206 000 1GPV-004 10/22/92 al 105 000 1GPV-004 04.09/94 af/al 15.000 1GPV-005 01!08/91 afial 38.500 1GPV-OO5 10/09/92 af/al 49.000 1GPV-G05 04/09/94 aflal 9.000 Containment Penetration J210 - Hydrogen-Oxygen Analyzer 1GSHV-4959B 01/21/91 af/al 2.000 1GSHV-49598 10/07/92 aftal 31.000 1GSHV-49598 03/15/94 af/al 4.000 1GSHV-49658 01/21/91 afat 5.000 1GSHV-4965B 10/07/92 af 18.000 1GSHV-49658 12/15/92 al 6.000 1GSHV-4965B 03/15/94 af/al 2 000 Contahment Penetration J211 - PCIG 1 KLHV-5154 01/12/91 af 143.000 1 KLHV-5154 01/30/91 al 70.900 1XLHV-5154 10/09/92 af 541.000 1XLHV-5154 10/25/92 al 18.000 1KLHV-5154 03/18/94 af 460.000 1 KLHV-5154 04/06/94 al 56.000 1 KLHV-5155 01/12/91 af 127.000 1 KLHV-5155 01/30/91 al 6.300
(
1KLHV-5155 10/09/92 af 522.000 1 K.LHV-5155 10/25/92 al 15.000 1 KLHV-5155 03/18/94 aral 107.000 Containment Penetration J212 - Hydrogen 4xygen Analyzer 1GSHV-4939A 01/14/91 af 0.000 1GSHV-4959A 02/05/91 al 2.000 1GSHV-4959A 07/21/92 af 63.000 Page 38 of 46
Reactor Containment fluilding Integrated L.eak Rate Test ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1GSHV-4959A 07/22192 al 105.000 1GSHV-4959A 10/06/92 al 10.000 1GSHV-4959A 12/13/93 af
> 1.0 La 1GSHV4959A 12/14/93 al 80.000 1GSHV-4959A 03/18/94 al 18 000 1GSHV-4965A 01/14 S 1 af 112.000 1GSHV-4965A 02/05/91 al 8 000 1GSHV-4965A 07/21/92 af 99.000 1GSHV4965A 07/22/92 al 92.000 1GSHV-4965A 10/06/92.
al 15 000 1GSHV-4965A 03/18/94 af 88.000 1GSHV-4965A 03/18/94 al 18.000 Containment Penetraton J220 - PASS 1RCSV-0707A 12/19!90 af/al 37.500 1RCSV-0707A 09/25/92 af/al 41.600 1 RCSV-0707A 03/15/94 af/al 7.000 1 RCSV-0707B 12/19/90 af/al 25.500 1 RCSV-0707B 09/25/92 artal 11.500 1RCSV-0707B 03/16/94 af/al 9 000 Containment Penetraton J221 - PASS 1RCSV-0729A 12/17/90 af/al 1.000 1RCSV-0729A 09/26/92 af/al 43.000 1RCSV-0729A 03/15!94 af/al 3.000 1RCSV-07298 12/17/90 af/al 4.000 1 RCSV-0729B 09/26/92 af/al 7.000 1 RCSV-0729B 03/15/94 af/al 12.000 Containment Penetraton C1 - Dqrwell Equipmod riatch C1 01/21/91 af/al 4.000 C1 10/03/92 af/al 7.000 C1 04/06/94 aflat 5.000 Contahment Penetration C2 - Drywell Equipment Hatch, Airlock C2 01/21/91 af/al 0.000 C2 10.02/92 af/al 0.000 Page 39 of 46
Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix E (continued)
GROSS GROSS NET NET LEAST UPPER LEAST UPPER SQUARES CONFIDENCE SOUARES CONFIDENCE FIT LEVEL SUPERIMPOSED FIT LEVEL TIME MASS LEAK RATE LEAK RATE LEAK RATE LEAK RATE LEAK RATE (bm)
(% per day)
(% per day)
(scfm)
(% per day)
(% per day) 2020 97500 0 6533 0 6864 4 470 0.1570 0.1901 2025 97498 06527 06854 4.470 0 1564 0.1891 Page 2 of 2
Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix F - Local Leakage Rate Test Data for Type B and Type C Tested Penetrations TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS Contahment Penetrabon P1 A - Mah skam 1 ABXJN-1 A i 01/08/91 af!al 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A O,1 ABXJN-181,1 ABXJN-1B O,1 ABXJN-1C O.
1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A t,1 AEXJN-2A O,1 AEXJN-2B I,1 AEXJN-2B O 1 ABXJN-1 A 1 09/13/92 affal 181.000 Test results include 1 ABXJN-12 t,1 ABXJN-181,1 ABXJN-1C I,1 ABXJN-1D 1,1 AEXJN-2A I,1 AEXJN-2B i 1 ABXJN-1 A 1 03/02/94 af/al 0.000 Test results include 1 ABXJN-121,1 ABXJN-12 O 1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O,1 ABXJN-1C O, 1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O 1 AEXJN-28 t,1 AEXJN-28 O 1 ABXJN-1 A O 01/08/91 aftal 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 0,1 ABXJN-1 A 1,1 ABXJN-1B 1,1 ABXJN-1B O,1 ABXJN-1C O, 1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O,1 AEXJN-2B 1,1 AEXJN-28 O 1 ABXJN-1 A O 09/13/92 etal 8 000 Test results include 1 ABXJN-12 O,1 ABXJN-18 O,1 ABXJN-1C O 1 ABXJN-1D O,1 AEXJN-2A O,1 AEXJN-28 O 1 ABXJN-1 A O 03/02/94 af/al 0000 Test results include 1ABXJN-121,1 ABXJN-12 0,1 ABXJN-1 A 1,1 ABXJN-1B I,1 ABXJN-1B O,1 ABXJN-1C O, 1 ABXJN-1D I,1 ABXJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O,1 AEXJN-2B I,1 AEXJN-2B O Contanment Penetration P1B - Mair. Steam 1 ABXJN-1 B I 01/08/91 atal 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1 B O,1 ABXJN-1C O, 1 ABXJN-1D I,1 ABXJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O,1 AEXJN-281,1 AEXJN-2B O 1 ABXJN-1B 1 09/13/92 af/al 181.000 Test resuRs include 1 ABXJN-121,1 ABXJN-1 A i,1 ABXJN-1C 1,1 ABXJN-1D I,1 AEXJN-2A f,1 AEXJN-2B i 1 ABXJN-1B i 03/02/94 af/al 0.000 Test results include 1 ABXJN-121,1 ABXJN-12 0,1ABXJN-1 A I,1ABXJN-1 A O,1ABXJN-1B O,1ABXJN-1C O, 1 ABXJN-10 l,1 ABXJN-1D 0,1 AEXJN-2A I,1 AEXJN-2A O 1 AEXJN-2B I,1 AEXJN-2B O 1 ABXJN-18 O 01/08/91 af!al 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 O.1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1C O.
1 ABXJN-1D I,1 ABXJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O.1 AEXJN-2B I, im XJN-28 O 1 ABXJN-1B O 09/13/92 af/al 8000 Test results include 1 ABXJN-12 0,1 ABXJN-1 A O,1 ABXJN-1C O,1 ABXJN-1D O,1 AEXJN-2A O,1 AEXJN-28 O 1 ABXJN-1 B O 03/02/94 af/al 0.000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1C O.
1 ABXJN-1D I,1 ABXJN-1D O,1 AEXJN-2A I,1 AEXJN-2A O,1 AEXJN-281,1 AEXJN-28 O Contanment Penetration P1C - Mah Steam 1 ABXJN-1C l 01/08/91 cf 153 000 1 ABXJN-1C 1 01/25/91 a!
153.000 1 ABXJN-1C I 09/13/92 af/al 181.000 Test results include 1 ABXJN-121,1 ASXJN-1 A 1,1 ABXJN-1B I,1 ABXJN-1D I,1 AEXJN-2A I,1 AEXJN-2B i 1 ABXJN-1C I 03/12/94 af/al 202.000 1 ABXJN-1C O 01/08/91 atal 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-1B O, 1 ABXJN-1D I,1 ABXJN-1D O,1 AEXJN-2A t,1 AEXJN-2A O,1 AEXJN-2B I,1 AEXJN-2B O 1 ABXJN-1C O 09/13/92 afial 8 000 Test results include 1 ABXJN-12 O,1 ABXJN-1 A O,1 ABXJN-1B O,1 ABXJN-1D O,1 AEXJN-2A O.1 AEXJN-28 O 1 ABXJN-1C O 03/02/94 afial 0000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A t,1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-1B O, 1 ABXJN-1D I,1 ABXJN-1D O,1 AEXJN-2A f,1 AEXJN-2A O,1 AEXJN-2B I,1 AEXJN-2B O Page 1 of 46
4 Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS Contahntent Penetration P1D - Man Steam 1 ABXJN-1D i 01/08/91 aflai 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A l 1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-18 O, 1 ABXJN-1C O,1 ABXJN-1D O,1 AEXJN-2A t,1 AEXJN-2A O,1 AEXJN-2B 1,1 AEXJN-28 O 1 ABXJN-1D I 09/13S2 af/al 181 000 Test results include 1 ABXJN-12 !.1 ABXJN-1 A I,1 ABXJN-1B I,1 ABXJN-1C 6,1 AEXJN-2A 1,1 AEXJN-2B 1 1 ABXJN-10 l 03/02/94 af/al 0.000 Test results include 1 ABXJN-121,1 ABXJN-12 0,1 ABXJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN 1B O.
1 ABXJN-1C O.1 ABXJN-1D 0,1 AEXJN-2A 1,1 AEXJN-2A O, I AEXJN-2B I,1 AEXJN-28 O 1 ABXJN-1D 0 01/08/91 af/al 6.000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-18 O, 1 ABXJN-1C O,1 ABXJN-1D 1,1 AEXJN-2A I,1 AEXJN-2A O,1 AEXJN-281,1 AEXJN-2B O 1 ABXJN-10 0 09/13/92 af/al 8.000 Test results include 1 ABXJN-12 O,1 ABXJN-1 A O,1 ABXJN-1B O,1 ABXJN-1C O 1 AEXJN-2A O,1 AEXJN-28 O 1 ABXJN-1D O 03/02/94 af!al 0000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O, 1 ABXJN-1C O,1 ABXJN-10 l,1 AEXJN-2A 1,1 AEXJN-2A O, I AEXJN-2B 1,1 AEXJN-28 O Containment Penetraton P2A - Feedwater 1 AEV-003 01/18!91 af
> 1.0 La 1 AEV-003 01/29/91 al 20794.000 1 AEV-003 10/04/92 af
> 1.0 La 1 AEV-003 10/17/92 al 69 000 1 AEV-003 03/31/94 af 1326.000 1 AE HV-F0748 01/19/91 af'at 6.000 1 AEHV-F074B 10/04/92 af/al 15.000 1 AEHV-F074B 03/31/94 af 15300 000 1 AEHV-F074B 04/16/94 al 18600.000 1 AEXJN-2A i 01/08/91 af/al 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 0,1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O, 1 ABXJN-1C 0,1 ABXJN-1D 1,1 ABJN-1D O,1 AEXJN-2A O,1 AEXJN-281,1 AEXJN-28 O 1 AEXJN-2A 1 09/13/92 af/al 181.000 Test results include 1 ABXJN-121,1 ABXJN-1 A l,1 ABXJN 1B 1,1 ABXJN-1C I,1 ABXJN-1D I,1 AEXJN-281 1 AEXJN-2A 1 03/02/94 atal 0.000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 A8XJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O, 1 ABXJN-1C 4,1 ABXJN-1C O,1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A O,1 AEXJN-2B I,1 AEXJN-28 O 1 AEXJN-2A O 01/0&st af!al 6.000 Test results include 1 ABXJN-121,1 ABXJN 12 O,1 ABXJN-1 A t,1 ABXJN-1 A O,1 ABXJN-1B 4,1 ABXJN-1B O, 1 ABXJN-1C 0,1 ABXJN-1D 1,1 ABJN-1D O,1 AEXJN-2A 1,1 AEXJN-2B I,1 AEXJN-2B 0 1 AEXJN-2A O 09/13/92 a'/al 8.000 Test results include 1 ABXJN-12 0,1 ABXJN-1 A O,1 ABXJN-1B O,1 ABXJN-1C O,1 ABXJN-1D O,1 AEXJN 28 O 1 AEXJN-2A O 03/02/94 af 0 000 Test results include 1 ABXJN-121,1 ABXJN-12 O.1 ABXJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-1B O, 1 ABXJN-1C I,1 ABXJN-1C O,1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A I,1 AEXJN-281,1 AEXJN-2B O Contahment Penetraton P2B - Feedwater 1 AEV-007 01/18!91 af
> 1.0 La 1 AEV-007 01/29/91 al 540 000 Page 2 of 46
5 Reactor Containment Building Integrated Leak Rate Test.
IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (scx:rn)
COMMENTS 1AEV-007 10/04/92 af
> 1.0 La 1 AEV-007 10/15/92 al 4020 000 1AEV-007 03/30/94 af
> 1.0 La 1 AEV-007 04/09/94 al 2250.000 1 AEHV-F074A 01/19/91 af 790 000 1 AEHV-F074 A 01/30/91 al 7110.000 1 AEHV-F074A 10/04/92 af/al 8.000 1 AEHV-F074A 03/30/94 aflal 854.000 1 AEXJN-2B I 01/08/91 af/al 6 000 Test results 6nclude 1 ABXJN-12 t,1 ABXJN-12 0,1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-1B O, 1 ABXJN-1C O,1 ABXJN-101,1 ABJN-1D O,1 AEXJN-2A I,1 AEXJN-2A O,1 AEXJN-2B O 1 AEXJN-281 09/13/92 af/al 181.000 Test results include 1 ABXJN-121,1 ABXJN-1 A 1,1 ABXJN-181,1 ABXJN-1C I,1 ABXJN-1D I,1 AEXJN-2A I 1 AFXJN-2B I 03/02/94 af!al 0.000 Test results include 1 ABXJN-121,1 ABXJN-12 O.1 ABXJN-1 A l 1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B 0, 1 ABXJN-1C l 1 ABXJN-1C O,1 ABXJN-10 I,1 ABXJN-1D O,1 AEXJN-2A I,1 AEXJN-2A O,1 AEXJN-28 O 1 AEXJN-28 O 01/08/91 af/al 6 000 Test results include 1 ABXJN-121,1 ABXJN-12 O.1 ABXJN-1 A I,1 ABXJN-1 A O.1 ABXJN-1B I,1 ABXJN-1B O.
1 ABXJN-1C O,1 ABXJN-1D 1,1 ABJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O,1 AEXJN-281 1 AEXJN-28 O 09/13/92 af/al 8.000 Test results include 1 ABXJN-12 O,1 ABXJN-1 A O,1 ABXJN-1B O,1 ABXJN-1C O,1 ABXJN-1D 0,1 AEXJN-2A O 1 AEXJN-28 0 03/02/94 af/al 0000 Test results include 1 ABXJN-121,1 ABXJN-12 O,1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O, 1 ABXJN-1C 1,1 ABXJN-1C O,1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A 1,1 AEXJN-2A O,1 AEXJN-28 i Containment Penetration P3 - RHR (Shuthwn Cooling) 1 BCHV-F009 01/13/91 af/al 860.000 1 BCHV-F009 09/28/92 af 941.000 1 BCHV-F009 10/01/92 al 1250.000 1 BCHV-F009 03/24/94 af/al 35 000 1BCPSV-4425 01/13/91 af/al 928.000 Test results include 1BCHV-FOO8 1BCPSV-4425 09'28/92 af 1119.000 Test results include 1BCHV-F008 1 BCPSV-4425 10/01/92 al 478.000 Test results include 1BCHV-F008 1 BCPSV-4425 03/24/94 af 15 000 Test results include 1BCHV-F008 1 BCPSV-4425 03/26/94 al 360.000 Test results include 1BCHV-F008 1BCHV-F008 01/13/91 af/al 928.000 Test results include 1BCPSV-4425 1BCHV-F008 09/28/92 af 1119 000 Test results include 1BCPSV-4425 1BCHV-F008 10/01/92 al 478 000 Test resulu include 1BCPSV-4425 1 BCHV-F008 03/24/94 af 15 000 Test results include 1BCPSV-4425 1 BCHV-F008 03/26/94 at 360.000 Test results irr,:lude 1BCPSV-4425 Page 3"of 46
Reactor Containment Building Integrated Leak Rate Test.
Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAXAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1 BCXJN-31 01/03/91 atal 40.500 Test results include 1BCXJN-3 O.1BCXJN-4B I,1BCXJN-48 O,1BCXJN-6C 1,1BCXJN-6C O,1BCXJN-60 l, 1BCXJN-6D O,1BEXJN-58 I,1BEXJN-5B O,1FDXJN-7 1,1FDXJN-7 0,1GBXJN-38A 1,1GBXJN-38A O, 1GBXJN-38B I,1GBXJN-388 O 1 BCXJN-31 10/08/92 af/al 37.000 Test results include 1BCXJN-3 0,1BCXJN-481,1BCXJN-4B O,1BCXJN-6C I,1BCXJN4C O,1BCXJN-6D 1, 1 BCXJ N-6D O.1 BEXJ N-5B 1,1 BEXJ N-5B O,1 FDXJ N-7 l.1 FDXJ N-7 O.1 GBXJ N-38A I,1 G BXJ N-3881,1 GBXJ N-38 B 1 BCXJN-31 03/01 S 4 afial 34.000 Test results include 1BCXJN-3 0,1BCXJN-4B I,1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6C O,1BCXJN-6D I, 1BCXJN-6D O,1BEXJN-581,1BEXJN-58 O,1FDXJN-71,1FDXJN-7 0,1GBXJN-38B 1,1GBXJN-388 O 1BCXJN-3 O 01/03S 1 af/al 40.500 Test results include 1BCXJN-31,1BCXJN-48 i,1BCXJN-4B O.1BCXJN-6C I,1BCXJN-6C O.1BCXJN-6D 1, 1BCXJN4D O 1BEXJN-5B 1,1BEXJN-5B O,1FDXJN-7 I,1FDXJN-7 O 1GBXJN-38A 1,1GBXJN-38A O.
1GBXJN-38B 1,1GBXJN-38B O 1BCXJN-3 0 10/08/92 af/al 37.000 Test results include 1BCXJN-31,1BCXJN-48 l 1BCXJN-48 O 1BCXJN-6C I,1BCXJN-6C 0,1BCXJN-60 I, 1 BCXJN-6D O 1 BEXJN-5B 1,1 BEXJN-5B O,1 FDXJN-71,1 FDXJN-7 0,1GBXJN-38A 1,1GBXJN-388 I,1GBXJ N-388 1BCXJN-3 0 03/01/94 afial 34.000 Test results include 1BCXJN-31,1BCXJN-48 l.1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6C O,1BCXJN-6D I, 1BCXJN-60 O,1BEXJN-581,1BEXJN-5B O,1FDXJN-71,1FDXJN-7 O,1GBXJN-3881,1GBXJN-38B O Centaintnent Penetration P4A - RHR (Shutdown Cooling) 1BCHV-F0508 01/16/91 af/al 90.000 Test results include 1BCHV-F1228 1BCHV-F050B 10/23/92 af 890 000 Test results include 1BCHV-F122B 1BCHV-F0508 10/30/92 al 863.000 Test results include 1BCHV-F122B 1 BCHV-F050B 03/23/94 af 340.000 Test results include 1BCHV-F1228 1 BCHV-F050B 04/03/94 al 330 000 Test results include 1BCHV-F1228 1 BCHV-F122B 01/16/91 af/al 90.000 Test results include 1BCHV-F050B 1 BCHV-F122B 10/23/92 af 890 000 Test results include 1BCHV-F050B 1 BCHV-F1228 10/30/92 al 863.000 Test results include 1BCHV-F050B 1BCHV-F1228 03/23/94 af 340.000 Test results include 1BCHV-F0508 1BCHV-F122B 04/03/94 al 330.000 Test results include 1BCHV-F050B 1 BCHV-F0158 01/16/91 af/al
- 1.000 1BCHV-F015B 10/24/92 af 14.000 1 BCHV-F015B 10/30/92 al 41.000 1 BCHV-F015B 03/23/94 aflat 1 000 1BCXJN-4A 1 01/10/91 af/al 12.000 Test results include 1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O 1BEXJN-5A 1 1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O 1GBXJN-8A t,1GBXJN-8A O,1GBXJN-88 I,1GBXJN-8B O 1 BCXJN-4A 1 09/22/92 afial 7.000 Test results include 1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O.1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-11 t,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1 BCXJN-4A i 03/01/94 af/al 6.000 Test results include 1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-6B O,1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-111,1FCXJN-110,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B I,1GBXJN-8B O Page 4 of 46
Reactor Containment Building Integrated Leak Rate Test-IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE
(*ccm)
COMMENTS 1BCXJN-4A O 01/10/91 af/al 12.000 Test results include 1BCXJN-4A 1,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN48 O 1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O.1GBXJN-8A t,1GBXJN-8A O,1GBXJN-8B I,1GBXJN-8B O 1BCXJN-4A O 09/22/92 af/al 7.000 Test results include 1BCXJN-4A t,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN48 O,1BEXJN-5A 1, 1BEXJN-5A O 1FCXJN-111,1FCXJN-11 O,1GBXJN-8A I,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1BCXJN-4A O 03/01/94 aflal 6.000 Test results include 1BCXJN-4A t,18CXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-6B O,1BEXJN-5A I, 1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A t,1GBXJN-8A O.1GBXJN-8B 1.1GBXJN-8B O Containment Penetraton P4B - RHR (Shutdown Coohng) 1BCHV-F050A 01/04/91 af/al 50 000 Test results include 1BCHV-F122A 1BCHV-F050A 09/22/92 af/al 58.400 Test results include 1BCHV-F122A 1BCHV-F050A 03/12/94 af 75 000 Test results nelude 1BCHV-F122A 1 BCHV-F050A 03/19/94 al 1740 000 Test results include 1BCHV-F122A 1BCHV-F122A 01/04/91 af/al 50 000 Test results include 1BCHV-F050A 1 BCHV-F122A 09/22/92 af/al 58.400 Test results include 1BCHV-F050A 1 BCHV-F122A 03/12/94 af 75 000 Test results include 1BCHV-F050A 1 BCHV-F122A 03/19/94 al 1710.000 Test results include 1BCHV-F050A 1 BCHV-F015A 01/04/91 af/al 0 000 1 BCHV-F015A 09/22/92 af 0 000 1 BCHV-F015A 09/3C/92 at 0.000 1 BCHV-F015A 03/12/94 af 0 000 1BCXJN-48 i 01/03/91 af/al 40 500 Test results include 1BCXJN-3 l,18CXJN-3 O,1BCXJN-4B O 1BCXJNAC I,1BCXJN4C O,1BCXJN-6D I, 1BCXJN-6D O,1BEXJN-5B 1,1BEXJN-5B O,1FOXJN-7 1,1FOXJN-7 0,1GBXJN-38A 1,1GBXJN-38A O, 1GBXJN-38B 1,1GBXJN-388 O 1 BCXJN-481 10/08/92 af/al 37.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6C O,1BCXJN-60 l, 1 BCXJN-6D O.1 BEXJN-5B I,1 BEXJ N-5B O,1 FDXJN-71,1 FOXJN-7 O,1 GBXJN-38A I,1GBXJN-388 !,1GBXJN-38B O
1 BCXJN-4B 1 03/01/94 af/al 34 000 Test results include 1BCXJN-3 t,1BCXJN-3 O,1BCXJN48 O,1BCXJN4C 1,1BCXJN-6C O,1BCXJN40 l, 1BCXJN40 O 1BEXJN-5B 1,1BEXJN-5B O,1FDXJN-71,1FDXJN-7 O,1GBXJN-38B I,1GBXJN-38B O 1BCXJN-4B O 01/03/91 af/al 40.500 Test results include 1BCXJN-31,1BCXJN-3 O.1BCXJN-481,1BCXJN-6C I,1BCXJN4C O,1BCXJN-6D 1, 1BCXJN-6D O.1BEXJN-5B I,1BEXJN-5B 0,1FDXJN-7 t,1FDXJN-7 0,1GBXJN-38A 1,1GBXJN-38A O, 1GBXJN-38B l,1GBXJN-388 O 1BCXJN-4B O 10/08/92 af!al 37.000 Test results include 1BCXJN-3 I,1BCXJN-3 O,1BCXJN-4B I,1BCXJN-6C 1,1BCXJN-6C O,1BCXJN-6D 1, 1 BCXJN-6D O 1 BEXJN-5B 1,1 BEXJN-5B O,1 FDXJN-71,1 FDXJN-7 0,1GBXJN-38A I,1GBXJN-3881,1GBXJN-38B O
Page 5 of 46
Reactor Containnient Building Integrated Leak Rate Test -
Hope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1BCXJN-4B O 03/01/94 af/ai 34 000 Test results include 1BCXJN-31,1BCXJN-3 O 1BCXJN-481,1BCXJN-6C 1,1BCXJN-6C O,1BCXJN-6D I, 1BCXJN-6D O 1BEXJN-5B 1,1BEXJN-5B O,1FDXJN-71,1FDXJN-7 O,1GEXJN-38B 1,1GBXJN-38B O Containment Penetroion PSA - Core Spray 1BEHV-F0068 01!18/91 af/al 790 000
~.~est results include 1BEHV-F0396 1BEHV-FOO6B 09/18/92 af/al 50.000 s est results include 1BEHV-F0398 1 BEHV-F0068 03/24/94 af 3.000 Test results include 1BEHV-F0398 I BEHV-F0068 04/08/94 al 724 000 Test results include 1BEHV-F039B 1 BEHV-F039B 01/18/91 afial 790.000 Test results include 1BEHV-F0068 1 BEHV-F0398 09/18/92 af/ai 50.000 Test results include 1BEHV-F006B 1 BEHV-F039B 03/24/94 af 3.000 Test results include 18EHV-FOO68 1 BEHV-F039B 0408/94 al 724 000 Test results include 18EHV-F0068 1 BEHV-F0058 01/18/91 af/al 2 000 1 BEHV-F005B 09/18/92 af/al 212.000 1 BEHV-FOO58 03/24/94 af 0.000 1 BE HV-F005B 04/09/94 al 28.000 1 BEXJN-SA 1 01/10/91 aflat 12 000 Test results include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O, 1BEXJN-5A O,1FCXJN-113,1FCXJN-110,1GBXJN-8A 1,1GBXJN-8A O.1GBXJN-8B 1,1GBXJN-88 O 1 BEXJN-5A i 09/22/92 af'ai 7.000 Test results include 18CXJN-4A 1,1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-681,1BCXJN-6B O, 1BEXJN-5A O 1FCXJN-111,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-88 O 1 BEXJ N-5A I 03/01/94 af/al 6 000 Test results include 18CXJN-4A t,1BCXJN-4A O 1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-6B O, 1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O 1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1BEXJN-5A O 01i10/91 af'al 12.000 Test results enclude 18CXJN-4A 1,1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-6B O, 1BEXJN-5A t,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A I,1GBXJN-8A O,1GBXJN-8B I,1GBXJN-8B O 1 BEXJN-5A O 09/22/92 af/al 7.000 Test results include 1BCXJN-4A !.1BCXJN-4A O,1DCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-68 O, 1BEXJN-5A t,1FCXJN-111,1FCXJN-11 O 1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 18EXJN-5A O 03/01/94 afial 6.000 Test results include 1BCXJN-4A I,1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6A O 1BCXJN-681,16CXJN-68 0, 1BEXJN-5A t,1FCXJN-111,1FCXJN-11 O 1GBXJN4A 1,1GBXJN-8A O,1GBXJN-8B I,1GBXJN-8B O Containment Penetration P5B - Core Spray 1 BEHV-F006A 01/03/91 af 2180.000 Test results include 1BEHV-F039A 1 BEHV-F006A 01/04/91 al 2890.000 Teat results include 1BEHV-F039A 1 BEHV-FCO6A 09/24/92 af 1380.000 Test results include 1BEHV-F039A 1 BEHV-FOO6A 10/10/S2 al 1700.000 1 BEHV-F006A 03/11/94 af/al 670.000 Test results include 1BEHV-F039A l
l Page 6 of 46 l
S a-Reactor Containment Building Integrated Leak Rate Test.
Hope Creek Generating Station, April 1994 Appendix F (continued)
TEST 1.EAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1dEHV-F039A 01/03/91 af 2180.000 Test results include 1BEHV-F006A 1 BEHV-F039A 01/04/91 al 2890.000 Test results include 1BEHV-F006A 1BEHV-F039A 09/24/92 af 1380.000 Test results include 1BEHV-F006A 1 BEHV-F039A 10/10/92 al 144.000 1BEHV-F039A 03/11/94 afial 670_000 Test results include 1BEHV-F006A i
1BEHV-F005A 01/04/91 af/al 841.000 Test results include 1BJHV-F006 1 BEHV-FOO5A 09/2--492 af 1360 000 Test results include 1BJHV-F006 1BEHV-F005A 10/09/92 al 874.000 Test results include 1BJHV-F006 1 BEHV-F005A 03/11/94 af 877.000 Test results include 1BJHV-F006 1 BEHV-F005A 03/18!94 al -
1730.000 Test results include 1BJHV-F006 Contartment Penetration P5B - HPCl 1BJHV-F006 01/04/91 af/al 841.000 Test results include 1BEHV-F005A i
1 BJHV-F006 09/24/92 af/al 1360.000 Test results include 1BEHV-F005A 1 BJHV-F006 10/09/92 at 874.000 Test results include 1BEHV-F005A IBJHV-F006 12/02/93 al 861.000 1 BJHV-F006 03/11/94 af 877.000 Test resutts include 1BEHV-F005A 1BJHV-F006 03/18!94 at 1730 000 Test results include 1BEHV-F005A i
1BEXJN-5BI 01/03/91 af/al 40.500 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN 4B I,1BCXJN-4B O.1BCXJN-6C I,1BCXJN-6C O, i
1BCXJN-6D 1,1BCXJN-6D O,18EXJN-5B O,1FDXJN-7 1,1FDXJN-7 0,1GBXJN-38A I,1GBXJN-38A O, 1GBXJN-3881,1GBXJN-388 O 1BEXJN-5B1 10/08/92 af/al 37.000 Test results include 1BCXJN-31,1BCXJN-3 0,.1BCXJN-4B I,1BCXJN-4B O 1BCXJN4C 1,1BCXJN-6C O, 1 BCXJN-6D I,1 BCXJN4D O,1 BEXJN-5B O,1 FOXJ N-71,1 FDXJ N-7 0,1 G BXJ N-38A l.1 GBXJ N-38B I,1 GBXJ N-38B i
O 1 BEXJN-5B I 03/01/94 af/al 34.000 Test results include 1BCXJN-3 I,1BCXJN-3 O 1BCXJN-4B 1,1BCXJN-48 O 1BCXJN-6C 1,1BCXJN-6C 0, 1BCXJN-6D I,1BCXJN-6D O,1BEXJN-5B O,1FDXJN-71,1FDXJN-7 O,1GBXJN-3881,1GBXJN-38B O 1BEXJN-5B O 01/03/91 at/al 40.500 Test results include 1BCXJN-3 t.1BCXJN-3 O,1BCXJN-4B I,1BCXJN-4B O,1BCXJN-6C I,1BCXJN4C O, 1BCXJN4DI,1BCXJN-6DO,1BEXJN-5BI,1FDXJN-71,1FDXJN-7O 1GBXJN-38A1,1GBXJN-38AO,1GBXJN-388 i,1GBXJN-388 O 1BEXJN-5B O 10/08/92 af/al 37.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-481,1BCXJN-4B O,1BCXJN-6C 1,1BCXJN-6C 0, 1 BCXJ N-6D 1,1 BCXJ N4D O,1 BEXJ N-5B 1,1 FDXJN-71,1 FDXJ N-7 0,1 G BXJ N-38A 1,1 GBXJN-38B 1,1 GBXJ N-38B j
O i
1BEXJN-5B O 03/01/94 atal-34.000.
Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-4B 0,1BCXJN4C 1,1BCXJN-6C O, 1BCXJN-6D 1,1BCXJN-60 O,1BEXJN-5B I,1FDXJN-71,1FDXJN-7 0,1GBXJN-38B I,1GBXJN-38B O.
I Containment Penetration P6A - RHR (L.PCI) 1 BCHV-F041D 01/18/91 af/al 600 000 Test results include 1BCHV-F146D Page 7 of 46
~wc u.-
,r
..rw
.m m
su m-..
43.3 7
,.m g
m,,,
,.,,,,ym,,,..,,
Reactor Containment Building Integrated Leak Rate Test IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS
._m 1 BCHV-F041 D 09/1382 af/ai 1114 000 Test results include 1BCHV-F146D 1 BCHV-F041 D 03!23/94 af 120.000 Test results include 1BCHV-F146D 1 BCHV-F041 D 04/01/94 al 2540 000 1 BCHV-F146D 01/18/91 af!al 600.000 Test results include 1BCHV-F041D 1 BChV-F146D 09/13/92 af/al 1114 000 Test results include 1BCHV-F041D 1 BCHV-F1460 03/23/94 af/al 120 000 Test results include 1BCHV-F041D 1 BCHV-F017D 01/18/91 af/al 29 000 1 PCHV-F0170 09/13/92 af 8 000 1 BCHV-F0170 09/18/92 al 0 000 1 BCHV-F017D 03/23/94 af/al 10 000 1 BCXJN-6A i 01/10/91 af!al 12.000 Test results include 1BCXJN-4A t,1BCXJN-4A O 1BCXJN-6A O 1BCXJN-6B I,1BCXJN-6B O.1BEXJN-SA l, 1BEXJN-5A O.1FCXJN-11 1,1FCXJN-110,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-881,1GBXJN-8B O 1BCXJN-6A i 09/22/92 af/al 7 000 Test results include 1BCXJN-4A t,1BCXJN-4A O 1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O.1BEXJN-5A i, 1BEXJN-5A O 1FCXJN-111,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B I,1GBXJN-8B O 18CXJN-6A 1 03/01/94 al"al 6.000 Test results include 1BCXJN-4A l,1BCXJN-4A O 1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O,1BEXJN-5A 1 18EXJN-5A O 1FCXJN-111,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-88 l,1GBXJN-8B O 1BCXJN-6A O 01110/91 afial 12.000 Test results include 1BCXJN-4A t,1BCXJN-4A O,18CXJN-6A 1,1BCXJN-6B 1,1BCXJN-6B O,1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-11 i,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1BCXJN-6A O 09/22/92 af/al 7.000 Test results include 1BCXJN-4A l 1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6B 1,1BCXJN-6B O,1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GSXJN-8B O 1BCXJN-6A O 03/01/94 af/al 6.000 Test results include 1BCXJN-4A I,1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6B 1,1BCXJN-6B O.1BEXJN-5A I, 1BEXJN-5A O,1FCXJN-11 l,1FCXJN-11 O,1GBXJN-8A I,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O Contariment Penetraton P6B - RHR (LPCI) 1 BCHV-F041B 01/16/91 af/al 335.000 Test results include 1BCHV-F1468 1 BCHV-F041B 10/25/92 af 521.000 Test results include 1BCHV-F146B 1 BCHV-F041B 10/28/92 al 460.000
- est results include 1LCHV-F1468 1 BCHV-F041 B 03/23/94 af 3.000 Tesi::,r?4 include 1BCHV-F146B 1 BCHV-F0418 04/06/94 al 843.000 Test results include 1BCHV-F1468 1 BCHV-F146B 01/16/91 aflal 335.000 Test results include 1BCHV-F0418 1 BCHV-F146B 10/25/92 af 521.000 Test results include 1BCHV-F0418 1 BCHV-F1468 10/28/92 al 460.000 Test results include 1BCHV-F0418
(
1 BCHV-F1468 03/23/94 af 3 000 Test results include 1BCHV-F041B 1 BCHV-F1468 04/06/94 al 843.000 Test results include 1BCHV-F041B Page 8 of 46 i,_ _ _ _ _ - _ _ _ _ _ - - - _
Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAXAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1BCHV-F0178 01/16/91 aWI 58.000 1 BCHV-F0178 10/25/92 af 21.000 1 BCHV-F017B 11/01/92 al 185 000 1 BCHV-F0178 03/23/94 afial 0 000 18CXJN-6B l 01/10S1 sfial 12.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN4A 1,1BCXJN-6A O,1BCXJN-6B O,1BEXJN-5A 1, 1BEXJN-5A O.1FCXJN-111, IFCXJN-11 O,1GBXJN-8A t,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1BCXJN-6B 1 09/22/92 af/al 7.000 Test results include 1BCXJN-4A t,1BCXJN-4A O 1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B O 1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-111,1 FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B l 1GBXJN-8B O 1BCXJN-6B l 0301/94 afial 6.000 Test results include 1BCXJN-4A t,1BCXJN-4A O,1BCXJNEA 1,1BCXJN4A O 1BCXJN-6B O,1BEXJN-SA 1, 1BEXJN-5A O,1FCXJN-11 1,1FCXJN-11 O.1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1BCXJN-6B O 01/10 S1 afial 12.000 Test resu'ts include 1BCXJN-4A 1,1BCXJN-4A O.1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BEXJN-5A 1, 1BEXJN-5A O,1FCXJN-11 1,1FCXJN-110,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1BCXJN-6B O 09/22192 af/al 7.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN4A 1,1BCXJN-6A O,1BCXJN-6B I,1BEXJN-5A I, 1BEXJN-GA O,1FCXJN-11 l 1FCXJN-11 O,1GBXJN-8A I,1GBXJN-6 \\ O 1GBXJN-8B I,1GBXJN-8B O 1BCXJN-6B O 0301!94 a f'ai 6,000 Test results include 1BCXJN-4A i,1BCXJN-4A O 1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BEXJN-5A l, 18EXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A i,1GBXJN-8A O,1GBXJN-6B 1,1GBXJN-8B O Containtnent Penetaation P6C - RHR (LPCI) 1 BCHV-F041 A 01/04/91 af
> 1.0 La Test results include 1 BCHV-F146A 1 bCHV-F041 A 01/10/91 al 45.900 Test results include 1BCHV-F146A 1 BCHV-F041 A 09/24/92 af/al 2.500 Test results include 1BCHV-F146A 1 BCHV-F041 A 03/12!94 af 38 000 Test results include 1BCHV-F146A 1 BCHV-F041 A 03/1994 al 1336.000 Test results include 1BCHV-F146A 1 BCHV-F146A 01/04/91 af
> 1.0 La Test results include 1BCHV-F041 A 1 BCHV-F146A 01/10/91 al 45 900 Test results include 1BCHV-F041 A 1 BCHV-F146A 09/24/92 af/al 2.500 Test results include 1BCHV-F041 A 1 BCHV-F146A 03/12/94 af 38.000 Test results include 1BCHV-F041 A 18CHV-F146A 03/19/94 al 1336.000 Test results include 1BCHV-F041 A 1 BCHV-F017A 01/04/91 af/al 0 000 1BCHV-F017A 09/24/92 af 31.400 1 BCHV-F017A 09/28/92 at 15.000 i
1BCHV-F017A 03/12/94 aflal 15.000 1 BCXJ N-6C I 01/03/91 af/al 40.500 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-4B O,1BCXJN4C O.1BCXJN-6D 1, 1BCXJN-6D O 1BEXJN-58 1,1BEXJN-58 O,1FDXJN-7 1,1FDXJN-7 O 1GBXJN-38A 1,1GBXJN-38A O, 1GBXJN-388 t.1GBXJN-388 O Page 9 of 46
e Reactor Containment Building Integrated Leak Rate Test-Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1 BCXJN-6C i 10S8/92 af!al 37.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-43 O 1BCXJN-6C O,1BCXJN-6D I, 1 BCXJN-6D O.1 BEXJN-5B 1,1 BEXJ N-5B O,1 FDXJ N-71,1 FDXJN-7 G,1GBXJN-38A I,1GBXJN-3881,1GBXJN-38B O
1BCXJN-6C I 03/01/94 aval 34.000 Test results include 1BCXJN-3 I,1BCXJN-3 O.1BCXJN-4B I,1BCXJN-4B O,1BCXJN-6C O,1BCXJN-6D I, 1BCXJN-6D 0,1BEXJN-581,1BEXJN-5B O,1FDXJN-71,1FDXJN-7 O 1GBXJN-38B 1,1GBXJN-388 O 1BCXJN-6C O 01/03/91 af/al 40.500 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-48 I,1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6D I, 1BCXJN-6D O 1BEXJN-5B 1,1BEXJN-5B O.1FDXJN-7 1,1FDXJN-7 O,1GBXJN-38A l.1GBXJN-38A O, 1GBXJN-388 i 1GBXJN-38B O 1BCXJN-6C O 10/08/92 af/al 37.000 Test results include 1BCXJN-31,1BCXJN-3 0,1BCXJN-4B 1,1BCXJN-4B O.1BCXJN-6C 1,1BCXJN-6D I, 1 BCXJil-6D O,1 B EXJ N-5 B 1,1 BEXJ N-58 O,1 FDXJ N-71,1 FDXJ N-7 0,1G BXJ N-38 A 1,1 GSXJ N-388 I,1 GBXJN-38 B O
1BCXJN-6C O 03/01/94 afiat 34.000 Test results include 1BCXJN-3 1,1BCXJN-3 0,1BCXJN-4B 1,1BCXJN-4B O 1BCXJN-6C 1,1BCXJN.60 1, 1BCXJN-6D O,1BEXJN-5B 1,18EXJN-5B O,1FDXJN-71,1FDXJN-7 O.1GBXJN-38B I,1GBXJN-38B O Contartment Penetraton P6D - RHR (1.PCI) 1 BCHV-F041C 12/28/90 af
> 1.0 La Test results include 1BCHV-F146C 1 BCHV-F041C 01/01/91 at 0.200 Test results include 1BCHV-F146C 1 BCHV-F041C 09/23/92 af
> 1.0 La Test resutts include 1BCHV-F146C 1 BCHV-F041C 10/03/92 al 144.500 Test results include 1BCHV-F146C 1BCHV-F041C 03/06/94 at/al 132.000 Test results include 1BCHV-F146C 1 BCHV-F146C 12/28/90 af
> 1.0 La Test results include 1BCHV-F041C 1 BCHV-F146C 01/01/91 al 0.200 Test results include 1BCHV-F041C 1BCHV-F146C 09/23/92 af
> 1.0 La Test results include 1BCHV-F041C 1BCHV-F146C 10/03/92 al 144.500 Test results include 1BCHV-F041C 1 BCHV-F146C 03/06/94 aval 132.000 Test results include 1BCHV-F041C 1BCHV-F017C 12/28!90 afial 0000 1BCHV-F017C 09/23/92 af 1.800 1 BCHV-F017C 09/29/92 at 870 000 1BCHV-F017C 0306!94 af/al 230 000 1BCXJN-6D l 01/03/91 af/al 40.500 Test results include 18CXJN-31,1BCXJN-3 O,1BCXJN-481,1BCXJN-4B O,.1BCXJN-6C 1,1BCXJN-6C O, 1BCXJN-60 O,1BEXJN-5B I,1BEXJN-5B O,1FDXJN-7 f.1FDXJN-7 O 1GBXJN-38A 1,1GBXJN-38A O.
1GBXJN-3881,1GBXJN-38B O 1 BCXJN-601 10/08/92 af!al 37.000 Test resuRs include 1BCXJN-31,18CXJN-3 O,1BCXJN-481,1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6C 0, 1 BCXJN-60 O,1 BEXJN-5B 1,1 BEXJN-5B O 1 FDXJN-71,1 FDXJN-7 O,1GBXJN-38A I,1GBXJN-3881,1GBXJN-38B O
Page 10 of 46
l Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 l
Appendix F (continued) l TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS l
1 BCXJN-6D 1 03/01/94 a f/al 34.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-48 O,1BCXJN4C I,1BCXJN4C O, 1BCXJN-60 O.1BEXJN-5B 1,1BEXJN-5B 0,1FDXJN-71,1FDXJN-7 O,1GBXJhi-38B I,1GBXJN-38B O 1BCXJN40 0 0103/91 af/al 40 500 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B I,1BCXJN-4B O 1BCXJN-6C 1,1BCXJN4C O, 1 BCXJ N4D 1,1 BE XJ N-5B 1,1 BEXJ N-58 O,1 FDXJ N-71,1 FDXJ N-7 O,1 GBXJ N-38A 1,1 GBXJ N-38A O,1 GBXJ N-388 1,1GBXJN-38B O 1BCXJN4D O 10.08/92 atal 37.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B I,1BCXJN-4B O,1BCXJN-6C 4,1BCXJN4C O, 1 BCXJN-6D 1,1 BEXJN-5B 1,1 BEXJN-5B O,1 FDXJN-71,1 FDXJ N-7 O,1GBXJN-38A 1,1GBXJN-38B I,1GBXJN-38B O
1BCXJN4D O 03/01/94 af/al 34.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BOXJN-4B 1,1BCXJN-48 O,1BCXJN-6C 1,1BCXJN-6C O, 1BCXJN4D I,1BEXJN-5B I,1BEXJN-58 O,1FDXJN-71,1FDXJN-7 O,1GBXJN-38B I,1GBXJN-38B O Contahment Penetration PT - HPCI Steam 1 FDHV-F002 12/31/9G sf 3960.000 1 FDHV-F002 01/12/91 at 0.000 1 FDHV-F002 09/*9/92 af 1102.000 1 FDHV-F002 1102/92 at 470.000 1 FDHV-FCO2 03/09.<J4 af/al 15.000 1 FDHV-F100 12/31/90 af/al 3 000 1FDHV-F100 03/08/92 af
> 1.0 La 1 FDHV-F100 03/12/92 al 26.000 1 FDHV-F100 09/19'92 af 10.000 1 FDHV-F100 10/2492 al 4.000 1 FDHV-F100 1203/93 af
> 1.0 La 1 FDHV-F100 12/03/93 al 58.000 1FDHV-F100 03/16/94 af/al 2.000 1 FDHV-F003 12/30/90 af/al 2.000 1 FDHV-F003 09/18/92 af 240.000 1 FDHV-F003 10/24/92 al 0.000 1 FDHV-F003 0309/94 af 61,000 1 FDHV-F003 03/31/94 al 18.000 1 FOXJN-71 0103/91 af/al 40.500 Test results include 1BCXJN-3 I,1BCXJN-3 0,1BCXJN-4B I,1BCXJN-4B O,1BCXJN-6C f.1BCXJN4C O, 1BCXJN4D 1,1BCXJN4D O,1BEXJN-5B I,1BEXJN-58 O,1FDXJN-7 O,1GBXJN-38A 1,1GBXJN-38A O, 1GBXJN-3881,1GBXJN-38B O 1 FOXJN-71 10/08/92 af/al 37.000 Test results include 1BOXJN-31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-4B O,1BCXJN4C 1,1BCXJN4C O, 1BCXJN-6D 3,1BCXJN-6D O,1BEXJN-5B I,1BEXJN-58 0,1FDXJN-7 O,1GBXJN-38A I,1GBXJN-388 1, 1GBXJN-388 Page 1I of 46
Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1 FDXJ N-71 03/0U94 af/sl 34 000 Test results include 1BCXJN-31,1BCXJN-3 O.1BCXJN-481,1BCXJN-4B O,1BCXJN-6C 1,1BCXJN-6C O, 1BCXJN-6D 1,1BCXJN-60 O.1BEXJN-5B 1,18EXJN-5B O,1FOXJN-7 0,1GBXJN-38B I,1GGXJN-388 1FOXJN-7 0 01/03/91 af/al 40.500 Test results include 1BCXJN-3 I,1BCXJN-3 O,1BCXJN-48 I,1BCXJN-4B O,1BCXJN-6C 1,1BCXJN-6C O, 1BCXJN-6D 1,1BCXJN-6D 0,1BEXJN-5B 1,1BEXJN-58 0,1FDXJN-7 1,1GBXJN-38A 1,1GBXJN-38A O, 1GBXJN-388 I,1GBXJN-388 O 1FDXJN-7 O 10/08.92 affal 37000 Test rsst,tts include 1BCXJN-3 l,1BCXJN-3 O 1BCXJN-48 t,1BCXJN-48 O.1BCXJN-6C I,1BCXJN-6C O.
1 BCXJN-6D I,1 BCXJN-6D O,1 BEXJN-5B I,18EXJN-5B O,1 FOXJN-71,1GBXJN-38A l.1GBXJN-38B l.1GBXJN-388 1FDXJN-7 O 03101/94 af/al 34.000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJfJ-4B I,1BCXJN-4B O,1BCXJN-6C 1,1BCXJN-6C 0, 1BCXJN-6D 1,1BCXJN-60 O.1BEXJN-5B l,1BEXJN-58 0,1FDXJN-7 I,1GisXJN-388 I,1GBXJN-388 Containment Penetration PSA - Chill Water 1GBHV-9531 B2 01/09/91 af 9750.000 1GBHV-953182 01/12/91 ai 549 000 1GBHV-9531 B2 10/06/32 af 9350 000 1GBHV-953182 10/11192 al 1161.000 1GBHV-953182 03/29/94 af/al 422.000 1GBPSV-9523A 01/09/91 af/al 317.000 Test results include 1GBHV-9531 A2 1GBPSV-9523A 10/06/92 af 222 000 Test results riclude 1GBHV-9531 A2 1GBPSV-9523A 10/13/92 al 285 000 Test resutts include 1GBHV-9531 A2 1GBPSV-9523 A 03/2894 af/al 167.000 Test resurts include 1G8HV-9531 A2 1GBHV-9531 A2 01/09 s1 af!M 317.000 Test resutts include 1GBPSV-9523A 1GBHV-9531 A2 10/06/92 af 222 000 Test results inciude 1GBPSV-9523A 1GBHV-9531 A2 10/13/92 al 285.000 Test results include 1GBPSV-9523A 1GBHV-9531 A2 03/28/94 af/al 167.000 Test results include 1GBPSV-9523A 1GBXJN-8A I 01/10 S 1 aflal 12.000 Test results include 1BCXJN-4A i,1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O.
1BEXJN-5A 1.1BEXJN-5A O.1FCXJN-111,1FCXJN-11 O,1GBXJN-8A O,1GBXJN-8B e,1GBXJN-8B O 1GBXJN-8A l 09/22/92 af!al 7.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O 1BCXJN-6A I,1BCXJN-6A O.1BCXJN-6B I,1BCXJN-68 O, 1BEXJN-5A t,1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1GBXJN-8A i 03/0l!94 af/al 6.000 Test results include 1BOXJN-4A I,1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-681,1BCXJN-68 0, 1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-11 l 1FCXJN-11 O,1GBXJN-8A O,1GBX JN-8B I,1GBXJN-8B O 1GBXJN-8A O 01/10/91 afial 12.000 Test resutts include 1BCXJN-4A I,1BCXJN-4A O,1BCXJN-6A 1,13CXJN-6A O,1BCXJN-6B I,1BCXJN-6B O, 1BEXJN-5A 1,1BEXJN-SA O,1FCXJN-111,1FCXJN-11 O.1GBXJN-8A 1,1GBXJN-BB I,1GBXJN-88 O 1GBXJN-8A O 09/22/92 af/al 7.000 Test results include 1BCXJN-4A I,1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6A O,1BCXJN-6B l,1BCXJN48 O, 1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A t,1GBXJN-8B I,1GBXJN-8B O Page 12 of 46
-1 Reactor Containment Building Integrated Leak Rate Test IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS 1GBXJN-8A O 03/01/94 af/al 6.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O 1BCXJN-6A 1,1BCXJN-6A O,1BCXJN481,1BCXJN-6B O, 1BEXJN-5A t,1BEXJN-5A O,1FCXJN-111.1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8B 1,1GBXJN4B O Containment Penetration P88 - Chill Water 1GBHV-953181 01/09/91 af 7090 000 1GBHV-953181 01/14/91 al 538.000 1GBHV-9531 B1 10/05/92 af 4710.000 1GBHV-953181 10/11/92 al 749 000 1GBHV-9531 B1 03/29/94 af 2080 000 1GBHV-953181 03/29S4 al 967.000 1GBPSV-9522A 01/09/91 af/ai 310 000 Test results include 1GBHV-9531 A1 1GBPSV-9522 A 10/05/92 af/al 350.000 Test resutts include 1GBHV-9531 A1 1GBPSV-9522A 03/28/94 afal 725 000 Test results include 1GBHV-9531 A1 1GBHV-9531 A1 01/09/91 afat 310 000 Test results include 1GBPSV-9522A 1GBHV-9531 A1 10/05/92 af 350.000 Test results include 1GBPSV-9522A 1GBHV-9531 A1 10/13/92 at 35 000 1GBHV-9531 A1 03/28'94 aflal 725 000 Test results include 1GBPSV-9522A 1GBXJN-881 01/10/91 a f/al 12.000 Test results include 1BCXJN-4A 1,18CXJN-4A O,1BCXJN-6A 1,1BCXJN4A O,1BCXJN-681,1BCXJN48 O.
1BEXJN-5A 1,1BEXJN 5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B O 1GBXJN-8B 1 09/22/92 af/a!
7.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-6B O, 1BEXJN-5A I,1BEXJN-5A O,1FCXJN-11 1,1FCXJN-11 O.1GBXJN-8A I,1GBXJN-8A O, IGBXJN-8B O 1GBXJN-8B 1 03/01/94 at/al 6.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN-6A I,1BCXJN4A O,1BCXJN-6B 1,1BCXJN-6B O, 1BEXJN-5A 1,1BEXJN-5A O 1FCXJN-111,1FCXJN-110,1GBXJN-8A 1,1GBXJN-8A O 1GBXJN-6B O 1GBXJN-8B O 01/10/91 aftal 12.000 Test results include 1BCXJN-4A I,1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6A O,1BCXJN-6B 1,18CXJN-6B O.
1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A l 1GBXJN-8A O 1GBXJN-8B l 1GBXJN-88 0 09/22/92 aflal 7.000 Test results include 1BCXJN-4A t,1BCXJN-4A O,1BCXJN4A 1,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O, 18EXJN-5A t,1BEXJN-5A O.1FCXJN-111,1FCXJN-11 O,1GBXJN-8A 1.1GBXJN-8A O 1GBXJN-8B 1 1GBXJN-8B O 03/01/94 aflal 6.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O 1BCXJN-6A I,1BCXJN-6A O.1BCXJN-6B I,1BCXJN-6B O.
1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-111,1FCXJN-11 O,1GBXJN-8A f,1GBXJN-8A O,1GBXJN-88 i Containtnent Penetration PS - RWCU 1 BGHV-F001 01/17/91 af/al 18.000 1 BGHV-F001 10/03/92 af/a!
27.000 1 BGHV-F001 04/01/94 af 17.000 1 BGHV-F001 04/07/94 al 8.000 Page 13 of 46
J
Reactor Containment Building Integrated Leak Rate Test H0pe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1 BGHV-F004 01/17/91 af/al 63.700 1BGHV-FOO4 10/03/92 af/al 48.000 1BGHV-F004 04 S1/94 af 84 000 1BGHV-F004 04/07/94 al 140 000 1BGXJN-9 !
01/11/91 af/al 0000 Test results include 1BCXJN-101,1BCXJN-10 O.1BGXJN-9 O 1BGXJN-91 09/30/92 af/al 16 500 Test results include 1BCXJN-10 i,1BCXJN-10 O,1BGXJN-9 O 1BGXJN-9 i C3/02/94 af/al 11.100 Test results include 1BCXJN-101,1BCXJN-10 O,1BGXJN-9 O 1BGXJN-9 0 01/11/91 af/al 0000 Test results include 1BCXJN-10 l,1BCXJN-10 O,1BGXJN-91 1BGXJN-9 0 09/30/92 af!al 16.500 Test results include 1BCXJN-10 l,1BCXJN-10 O 1BGXJN-91 1BGXJN-9 O 03/02/94 af/al 11.100 Test resu!ts include 1BCXJN-10 t,1BCXJN-10 O,1BGXJN-9 I Containment Penetraton Pio - RHR (Head Spray) 1 BCHV-F022 01/16/91 af/al 10.000 1 BCHV-F022 09/16/92 af 6.000 1BCHV-F022 10/22/92 al 0.000 1BCHV-F022 03/07/94 af 0.000 1 BCHV-F022 04/08/94 al 10.000 1 BCHV-F023 01/16/91 aflal 25.000 1 BCHV-F023 10/24 S2 af 5.000 1 BCHV-F023 11/01G2 al 12.000 1 BCHV-F023 03/24/94 afial 11.000 1BCXJ N-101 01/11/91 af/al 0.000 Test results inctuce 1BCXJN-10 O,1BGXJN-91,1BGXJN-9 O 1BCXJN-101 09/30/92 af/al 16 500 Test results include 1BCXJN-10 O,1BGXJN-9 I,1BGXJN-9 O 1 BCXJ N-101 03/02/94 aflat 11.100 Test results include 1BCXJN-10 O,1BGXJN-91,1BGXJN-9 O 1BCXJN-10 0 01/11/91 af/al 0.000 Test results include 1BCXJN-10 l,1BGXJN-9 t,1BGXJN-9 O 1BCXJN-10 0 09/30/92 aftal 16.500 Test results include 1BCXJN-10 l,1BGXJN-91,1BGXJN-9 O 1BCXJN-10 0 03/02/94 af/al 11.10C Test results include 1BCXJN-10 I,1BGXJN-91,1BGXJN-9 O Containment Penetraton P11 - RCIC Steam 1FCHV-F007 12/30/90 af'al 3.500 1FCHV-F007 09/19/92 af 12.000 1 FCHV-F007 10/12/92 at 4.000 1FCHV-F007 03/08/94 af/al 4.000 1 FCHV-F076 12/30/90 af/a!
0.000 Page 14 of 46
Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1 FCHV-F076 09/19S 2 af 4 000 1 FCHV-F076 10/12/92 al 4.000 1 FCHV-F076 03/08/94 af/al 10.000 1 FCHV-F008 12130 S 0 aftal 48.000 1 FCHV-F008 09/19/92 af 121 000 1 FCHV-F008 10/12/92 al 50 000 1 FCHV-F008 03/08/94 af!al 38.000 1 FCXJ N-11 1 01/10!91 at/al 12.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN-6A I,1BCXJN-6A O.1BCXJN-6B 1,1BCXJN-6B O.
1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-11 O,1GBXJN-8A t,1GBXJN-8A O.1GBXJN481,1GBXJN-8B O 1 FCXJN-11 1 09/22/92 af/al 7.000 Test resu:ts include 1BCXJN-4A 1,1BCXJN-4A O,1BCXJN-6A t,1BCXJN-6A O,18CXJN-6B I,18CXJN-6B O.
1BEXJN-5A 1,1BEXJN-5A O 1FCXJN-11 O,1GBXJN-8A t,1GBXJN-8A O,1GBXJN-8B I,1GBXJN-88 O 1 FCXJN-11 1 03/01/94 af/al 6 000 Test results include 1BCXJN-4A f,1BCXJN-4A O 1BCXJN-6A t,1BCXJN-6A O,1BCXJN-6B I,1BCXJN-68 O, 1BEXJN-5A t,1BEXJN-5A O,1FCXJN-110,1GBXJN-8A I,1GBXJr4-8A O,1GBXJN-8B 1,1GBXJN-8B O 1 FCXJN-110 01/10/91 af/al 12.000 Test results include 18CXJN-4A 1,1BCXJN-4A O.1BCXJN-6A I,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O, 1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-11 1,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-8B O 1 FCX.N-11 0 09Q2/92 afial 7.000 Test results include 1BCXJN-4A 1,1BCXJN-4A O 1BCXJN-6A 1,1BCXJN-6A O,1BCXJN-6B 1,1BCXJN-6B O.
1BEXJN-5A 1,1BEXJN-5A O,1FCXJN-111,1GBXJN-8A 1,1GBXJN-8A O,1GBXJN-8B 1,1GBXJN-88 O 1 FCXJN-110 03/01/94 af/al 6 000 Test results include 18CXJN-4A 1,1BCXJi4-4A O,1BCXJN-6A I,1BCXJN-6A O 1BCXJN-6B I,1BCXJN-68 0, 1BEXJN-5A 1,1BEXJN-5A O.1FCXJN-111,1GBXJN-8A I,1GBXJN-SA O,1GBXJN-88 l.1GBXJN-8B O Containment Penetraton P12 - Man Steam Drain 1 ABHV-F016 01/27/91 af 9310 000 1 ABHV-F016 02/08/91 al 858.000 1ABHV-F016 10/13/92 af 19410.000 1 ABHV-F016 10/30/92 al 4.000 1 ABHV-F016 03/17/94 af 40100.000 1 ABHV-F016 04/10/94 al 93 000 1ABHV-F019 02/04/91 af/al 140.000 1 ABHV-F019 10/13/92 af 23.000 1 ABHV-F010 10/24/92 al 264.000 1 ABHV-F019 03/17/94 a'/al 16.000 1 ABXJN-121 09/13/92 afial 181.000 Test results inclu:le 1 ABXJN-12 O 1 ABXJN-1 A t,1 ABXJN-1 A O 1 ABXJN-1B I,1 ABXJN-1B O,1 ABXJN-1C 1, 1 ABXJN-1C O,1 ABXJN-1D 1,1 ABXJN-10 O,1 AEXJN-2A 1,1 AEXJN-2A O 1 AEXJN-281,1 AEXJN-28 O 1 ABXJN-121 09/13/92 af!al 181.000 Test results include 1 ABXJN-1 A i,1 ABXJN-1 B I,1 ABXJN-1C I,1 ABXJN-1D 1,1 AEXJN-2A i,1 AEXJN-2B I Page 15 of 46
Reactor Containment Building Integrated Leak Rate Test.
IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT D/.TE TYPE (sccm)
COMMENTS
-m.__.
1 ABXJN-121 03/02/94 af/al 0.000 Test results include 1 ABXJN-12 O,1 ABXJN-1 A 1,1 ABXJN-1 A O,1 ABXJN-1B I,1 ABXJN-1B O,1 ABXJN-1C 1, 1 ABXJN-1C O,1 ABXJN-1D 1,1 ABXJN-10 O 1 AEXJN-2A t,1 AEXJN-2A O 1 AEXJN-2B I,1 AEXJN-2B O 1 ABXJN-12 O 09r13/92 af/al 181.000 Test results include 1 ABXJN-12 1,1 ABXJN-1 A I,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O,1 ABXJN-1C 1, 1 ABXJN-1C O 1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A t,1 AEXJN-2A O 1 AEXJN-2B I,1 AEXJN-2B O 1 ABXJN-12 0 09/13/92 af/al 8 000 Test results oclude 1 ABXJN-1 A O,1 ABXJN-18 O,1 ABXJN-1C O,1 ABXJN-1D O,1 AEXJN-2A O,1 AEXJN-2B O 1 ABXJN-12 0 03/02/94 af/ai 0.000 Test results include 1 ABXJN-121,1 ABXJN-1 A t,1 ABXJN-1 A O,1 ABXJN-1B 1,1 ABXJN-1B O,1 ABXJN-1C 1, 1 ABXJN-1C O,1 ABXJN-1D 1,1 ABXJN-1D O,1 AEXJN-2A t,1 AEXJN-2A O,1 AEXJN-2B 1,1 AEXJN-2B O Contanment Penetration P17 - Recuculation Sample 1 BBSV-4310 12/28/90 af 14930 000 1 BBSV-4310 01/21/91 at 8.000 1 BBSV-4310 10/09/92 af/al 12.000 1 BBSV-4310 03/28/94 af 329.f,00 1 BBSV-4310 04/1644 al 253.000 1 BBSV-4311 12/28/90 af 10100.000 1 BBSV-4311 01/21/91 al 7.000 1 BBSV-4311 10/09/92 af/at 18.000 1 BBSV-4311 03/28/94 af 729.000 1 BBSV-4311 04/16/94 al 10 000 Containment Penetratx>n P18 - SLC 1 BHV-029 01/26/91 aflat 60.500 1 BHV-029 10/06/92 af 4090 000 1 BHV-029 10/14/92 al 46.000 1 BHV-029 03/26*C4 af/ai 99.000 1 BHHV-F006A 01/22/91 af/al 2.500 Test results include 1BHHV-F0068 1BHHV-F006A 10/07/92 afial 0000 Test results include 1EHHV-F006B 1 BH HV-F006A 03/26/94 af/al 4.000 Test resuits include 1BHHV-F0068 1 BHHV-F006B 01/22/91 af/al 2.500 Test results include 1BHHV-F006A 1 BHHV-F0068 10/07/92 af/al 0.000 Test results include 1BHHV-F006A 1 BHHV-F0068 03/26/94 a'Jat 4.000 Test results include 1BHMV-F006A Contahment Penetration P19 - Recirculation Pump Seal Purge 1 BBV-043 11/07/90 af/al 5.000 1 BBV-043 09/15/92 af!al 103.000 1 BBV-043 03/14/94 af/af 4.000 Page 16 of 46
4 Reactor Containment Building Integrated Leak Rate Test llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
. COMMENTS 1 BFHV-3800A 11/08/90 af
> 1.0 La 1 BFHV-3800A 11/08/90 al 42.000 i
1 BFHV-3800A 09/15/92 af!al 0000 1 BFHV-3800A 03/15/94 af/al 4.000 Containment Penetration P20 - Recirculation Pump seal Purge 1 BBV-047 01/21/91 af/al 16.000 1 BBV-047 10/07/92 af/al 158.000 1 BBV-047 03/27/94 af 5.000 1BFHV-38000 01/22/91 af/al 5.000 1BFHV-3800B 10/08/92 af/al 1.200 4
1 BFHV-3800B 03/27/94 af 2.000 1BFHV-38008
- 03/31/94 at 2.000 Oontainment Penetration P22 - Hydrogen Recombiner 1GSHV-50508 01/07/91 af/al 13.000
' 1GSHV-50508 09/25/92 af/al 18.000 1GSHV-5050B 03/09/94 af 15.000 1GSHV-50508 03/16/94 al 54.000 1GSHV-5052B 01/07/91 af/al 11.000 1GSHV-50528 09/25/92 af/al 20.000 1GSHV-5052B 03/09/94 af 17.000 1GSHV-50528 04/05/94 at 33.000 f
Containment Penetration P22/P220 - Drywet Purge 1GSHV-4956 01/07/91 aftal 755 000 Test resu'ts include 1GSHV-4978,1GSHV-4979 1GSHV-4956 04/19/91 af/af 876.000 Test resuRs include 1GSHV-4978,1GSHV-4979 1GSHV-4956 07/19/91 af/al 759.000 Test results include 1GSHV-4978,1GSHV-4979 1GSHV-4956 10/18/91 aflat 790.000 Test results include 1GSHV-4978.1GSHV-4979 i
1GSHV-4956 01/17/92 af
> 1.0 La Test results include 1GSHV-4978,1GSHV-4979 1GSHV-4956 03/11/92 al 130.000 Test results include 1GSHV-4978,1GSHV-4979 -
1GSHV-4956 06/12/92 aflat 850.000 Test resuRs include 1GSHV-4978,1GSHV-4979 1GSHV-4956 09/25/92 af/al.
60.000 Test resuRs include 1GSHV-4978,1GSHV-4979
[
1GSHV-4956 12/18/92 af/al 700.000 Test resuRs include 1GSHV-4978,1GSHV-4979 1GSHV-4956 03/19/93 af/al 825.000 Test results include 1GSHV-4978,1GSHV-4979 1GSHV-4956 06/18/93 af/al 279.000 Test results include 1GSHV-4978.1GSHV-4979 1GSHV-4956 09/17/93 af/al 191.000 Test results include 1GSHV-4978,1GSHV 4979 1GSHV-4956 12/03/93 af/al 821.000 Test results include 1GSHV-4978,1GSHV-4979 Page 17 of 46 f
.-_m._
Reactor Containment Building fntegrated Leak Rate Test.
Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAMAGE COMPONENT DATE TYPE (sccm)
COMMENTS m.
1GSHV-4956 03/06/94 af 190.000 Test results include 1GSHV-4978,1GSHV-4979 1GSHV-4956 04/23/94 at 53.000 Test results include 1GSHV-4978,1GSHV-4979 1GSHV-4978 01/07!91 aflal 755.000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4978 04/19/91 af/al 876.000 Test results metude 1GSHV-4956,1GSHV-4979 1GSHV-4978 07/19/91 af/al 759.000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4978 10/15S1 aflat 790.000 Test results mclude 1GSHV-4956,1GSHV-4979 1GSHV-4978 01!17:37 af
> 10 La Test resu!!s include 1GSHV-4956,1GSHV-4979 1GSHV-4978 BF 01/17/92 al 18 000 Blind flange mstalled at 1GSHV-4978 1GSHV-4978 03/10S 2 af 123.000 Test results include 1GSHV-4979 1GSHV-4978 03/11/92 al 130 000 Test resul's include 1GSHV-4956,1GSHV-4979 1GSHV-4978 06/12/92 af/al 850.000 Test results include 1GSHV-4956,1GSHV-4979 1GS HV-4978 09/25/92 af/al 60 000 Test resuRs include 1GSHV-4956,1GSHV-4979 1GSHV-4978 12/18/92 af/al 700 000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4978 03/19/93 af/al 825.000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV 4978 06/18/93 af/al 279.000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4378 09/17/93 af/al 191.000 Test resutts include 1GSHV-4956,1GSHV-4979 1GSHV-4978 12/03/93 af/al 821.000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4978 03/06/94 af 190 000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4978 04/23/94 al 53.000 Test results include 1GSHV-4956,1GSHV-4979 1GSHV-4979 01/07/91 af/at 755.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 04/19/91 af/al 876 000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 07/19'91 af/al 759.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 10/18/91 af/ai 790.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 01/17/92 af
> 1.0 La Test results include 1GSHV-4953,1GSHV-4978 1GSHV-4979 BF 01/17/92 at 0.000 Bhnd flange installed at 1GSHV-4979 1GSHV-4979 03/10/92 af 977.000 1GSHV-4979 03/10/92 af 123.000 Test results mclude 1GSHV-4978 1GSHV-4979 03/11/92 al 130.000 Test resuits include 1GSHV-4956,1GSHV-4978 1GSHV-4979 06/12/92 af/al 850.000 Test results ir'efude 1GSHV-4956,1GSHV-4978 1GSHV-4979 09:25/92 af/al 60.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 12/18/92 aflat 700.000 Test resuts include 1GSHV-4956,1GSHV-4978 1GSHV-4979 03/1943 aflat 825 000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 06/18/93 at/al 279.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 09/17/93 af/al 191.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 12/03/93 af/al 821.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 03/06/94 af 190.000 Test results include 1GSHV-4956,1GSHV-4978 1GSHV-4979 04'23194 al 53.000 Test resufts include 1GSHV-4956,1GSHV-4978 Page 18 of 46
Reactor Containtnent Building Integrated Leak Rate Test Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DAT1E TYPE (sccm)
COMMENTS P22 F1 01/08/91 af/al 2.000 P22 F1 03/11/92 al 3.000 P22 F1 10/07S2 af/al 0.000 P22 F1 03/tM/94 af 0.000 P22 F1 04/06/94 al 0000 P22 F2 0406/94 al O.000 Containment Penetraton P22/P220 -Torus Purge 1GSHV-4958 01/15/91 af/al 1585.000 Test resuMs include 1GSHV-4980 1GSHV-4958 0503/91 af/al 1525.000 Test results include 1GSHV-4980 1GSHV-4958 08/02<91 af/al 856.000 Test resuits include 1GSHV-4980 1GSHV-4958 11/08 S1 afial 709 000 Test results include 1GSHV-4980 1GSMV-4958 03/G8/92 af/al 556 000 Test results include 1GSHV-4980 1GSHV-4958 06/05/92 aftal 1200.000 Test results include 1GSHV-4980 1GS HV-4958 09/22/92 af/al 755.000 Test results include 1GSHV-4980 1GSHV-4958 12/11/92 af/al 840 000 Test results melude 1GSHV-4980 1GSHV-4958 03/12/93 af/al 1712.000 Test reeults include 1GSHV-4980 1GSHV-4958 06/11/93 af/al 878 000 Te st results include 1GSHV-4980 1GSHV-4958 09/10/93 af 1022.000 Test results include 1GSHV-4980 1GSHV-4958 12/02/93 af/al 842.000 Test results mclude 1GSHV-4980 1GSHV-4958 0306/94 af 1724.000 Test results include 1GSHV-4980 1GSHV-4958 04/05/94 al 75.000 Test results include 1GSHV-4980 1GSHV-4980 01/15/91 af/al 1585.000 Test results include 1GSHV-4958 1GSHV-4980 05/03.91 af/al 1525.000 Test results include 1GSHV-4958 1GSHV-4980 08/G2/91 af/al 856.000 Test results include 1GSHV-4958 1GSHV-4980 11/08/91 af/al 709.000 Test results include 1GSHV-4958 1GSHV-4980 03/08/92 af/al 556.000 Test reads include 1GSHV-4958 1GSHV-4980 06/05/92
. af/al 1200.000 Test results include 1GSHV-4958 1GSHV-4980 09/22!92 af/al 755.000 Test results include 1GSHV-4958 1GSHV-4980 12/11/92 aflal 840 000 Test results include 1GSHV-4958 1GSHV-4980 03:12/93 aflat 1712.000 Test results include 1GSHV-4958 1GSHV-4980 06/11/93 af/al 878.000 Test results include 1GSHV-4958 1GSHV-4980 09/10/93 af 1022.000 Test results include 1GSHV-4958 1GSHV-4980 12.02/93 af/al 842.000 Test results include 1GSHV-4958
(
1GSHV-4980 03/06/94 af 1724 000 Test results include 1GSHV-4958 1GSHV-4980 0405/94 al 75.000 Test results include 1GSHV-4958 P220 F1 01/25/91 af/al 4.000 Page 19 of 46 i
Reactor Containment Building Integrated Leak Rate Test.
Ilope Creek Generating Station, April 1994 Appendit F (continued)
TEST LEAXAGE COMPONENT DATE TYPE (secm)
COMMENTS P220 F1 09/22/92 af/al 1.000 P220 F1 03/06/94 af 0.000 P220 F1 04/06/94 al 2.000 Containment Penetraton P23 - Hydrogen Recombrier 1GSHV-5050A 01/07/91 af/al 59.500 1GSHV-5050A 09/14/92 af/al 54.000 1GSHV-5050A 03/08/94 af/al 11.000 1GSHV-5052 A 01/07/91 af 220.000 1GSHV-5052A 02, % S1 al 176.000 1GSHV-5052A 09/14S2 af/al 158.000 1GSHV 5052A 03/08/94 af/al 167.000 Contahment Penetraton P23 - Crywell Purge 1GSHV-4950 12!28SO al 2415.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 01/07/91 af!al 2430 000 Test results include 1GSHV-4951,1G3HV-4952 1GSHV-4950 04/26 S1 af/al 2300 000 Test results include 1GSHV-4951,1GSHV-4932 1GSHV-4950 07/26/91 af/ai 2155.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 10/25/91 aflat 2330.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 01/24/92 af/al 2610 000 Test resutts include 1GSHV-4951,1GSHV-4952 1GSHV-4950 04/24S 2 af/al 2320.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 07/24/92 af!al 864.000 Test results include 1GSHV-4951,1GOHV-4952 1GSHV-4950 09/13/92 -
af 1329 000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 10/29/92 al 510.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 03/15/94 af 3760.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 03/20/94 af 2480 000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4950 04!!5f94 al 1944.000 Test results include 1GSHV-4951,1GSHV-4952 1GSHV-4952 12/28SO al 2415.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 01/07/91 aflal 2430.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 04/2SS1 af/al 2300.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 07/26/91 af/al 2155.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 10/25/91 af!al 2330 000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 01/24/92 af/al 2610.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 04/24/92 afial 2320.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 07/24'92 af/al 864.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 09/13!92 af 1329.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 10/29/92 al 510.000 Test results include 1GSHV-4950.1GSHV-4951 1GSHV-4952 03/15.T)4 af 3760.000 Test results include 1GSHV-4950,1GSHV-4951 Page 20 of 46
=
L Reactor Containment Building Integrated Leak Rate Test.
Hope Creek Generating Station, April 1994 Appendix F (continued)
-TEST LEAKAGE COMPONENT DATE TYPE becm)
COMMENTS 1GSHV-4952 03/20S4 at 2480.000 Test results include 1GSHV-4950,1GSHV-4951 1GSHV-4952 04/15/94 al 1944 000 Test resuns include 1GSHV-4950,1GSHV-4951 1GSHV-4951 12/28/90 al 2415.000 Test results include 1GSHV-4950,1GSHV-4952
}
1GSHV-4951 01/07S 1 af/a!
2430 000 -
Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 04/26/91 af/al 2300.000 Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 07/26/91 af/al 2155.000 Test results include 1GSHV-4950,1GSHV-4952 t
1GSHV-4951 10/25/91 a'/al 2330.000 Test resuits include 1GSHV-4950,1GSHV-4952 1GSHV-4951 01/24/92 af/al 2610.000 Test results include 1GSHV-49SO,1GSHV-4952
- 1GSHV-4951 04/24/92 af/a!
2320.000 Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 07/24/92 af/al 864.000 Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 09/13S 2 af 1329.000 Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 10/29/92 al 510.000 Test resutts include 1GSHV-4950,1GSHV-4952 1GSHV-4951 03/15/94 af 3760.000 Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 03/20/94 af/al 14.000 1GSHV-4951 03/20/94 af 2480 000 Test results include 1GSHV-4950,1GSHV-4952 1GSHV-4951 04/15/94 al 1944 000 Test results include 1GSHV-4950,1GSHV-4952 P23 F1 01/08/91 af/al 3.000 P23 F1 09/13/92 af 3.000 P23 F1 10/13/92 al 2.800 P23 F1 03/06/94 af 0.000 P23 F1 04/05/94 af!al 3.000 P23 F2 10/13/92 at 3.200 P23 F2 03/06/94 af' O.000 j
P23 F2 04/05/94 al 3.000 P23 P1 10/29/92 al 251.000 P23 P1 03/06 S4 af 240.000 P23 P1 04/01/94 al 19.900 Contahment Penetration P24A RHR (Dryweg Spray) -
1BCHV-F0218 01/15/91 af/al 147.500 1BCHV-F021 B 10/25/92 af 195.009
.j, 1BCHV-F021B 11/01/92 al 466.000 1BCHV-F021 B 03/24/94 af 16.000 1 BCHV-F021B 04/03G4 al 32.000 1BCHV-F0168 01/15/91 af 2560.000 Page 21 of 46 e
-u
->n
--,w-, -, -s.-+,----
. -. - ~
,w n
-x
-a
Reactor Containment Building Integrated Leak Rate Test -
llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS 1 BCHV-F0168 01/20/91 al 1950 000 1 BCHV-F0168 10/25/92 af 0.000 1BCHV-F0168 11/O f S2 al 48.000 18CHV-F0168 03/24/94 ai/al 120 000 Contas1 ment Penetraton P248 - RHR (DryweR Spray) 1 BCHV-F021 A 01/04/91 aflat 49 000 1 BCHV-F021 A 09/23/92 aflet 30.100 1 BCHV-F021 A 03/1394 a f'al 243.000 1 BCHV-F016A 01/04/91 af/al 175.000 1BCHV-F016A 09/23/92 af 190.000 1 BCHV-F016A 09/28/92 al 1530 000 1 BCHV-F016A 03/13/94 at'al 265.000 Contariment Penetraton P25 - Liquid Radwaste (Drywel Floor Drabs) 1HBHV-FOO3 01/27/91 af 19200.000 1HBHV-F003 02/07/91 al 28.200 1 H BHV-F003 09/26/92 af 5360.000 1HBHV-F003 10/23S2 mi 8 000 1 HBHV-F003 03/20/94 af 1600 000 1HBHV-F003 04!10/94 al 80.000 1HBHV-F004 01/27/91 af/al 6,000 1HBHV-F004 09/29/92 of/al 31.000 1 HBHV-FOO4 03/20/94 af
> 1.0 La 1HBHV-F004 03/20/94 al 96 000 Containment Penetraton P26 - Liquid Radwas*e (Drywel Equpment Drains) 1HBHV-F019 01/10/91 af 36000.000 1 HBHV-F019 02/01/91 al 101.700 1H BHV-F019 09'28/92 af 16450.000 1HBHV-F019 10/21/92 al 38.000 1HBHV F019 03/19S4 af/al 52.000 l
1HBHV-F020 01/10/91 af 1506.000 i
1 HBHV-F020 02/07/91 at 22.000 1 HBHV-F020 09/27/92 af 36000.000 1HBHV-F020 10/21/92 al 18.000 Page 22 of 46 l
Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 -
Appendix F (continued)
TEST LEAKAGE
. COMPONENT DATE TYPE (sccm)
COMMENTS 1H BHV-F020 03/19!94 af!al 10.000 Contanment Penetration P27 - Servce Air 1KAV-038 01/12/91-af/a!
26 500 1KAV-038 10/09/92 ai/at 35.000 1XAV-038 03/16S4 aflat 45.000 1 KAV-039 01/12/91 af/al 67.500 1KAV-039 10/09/92 af/al 85.000 1XAV-039 03/15/94 aflat 94.000 r
Contahment Penetration P28A - PCIG 1XLHV-51528 01/13/91 af 325.000 1 KLHV-51528 01/25/91 al 4.000 1KLHV-51528 09/17/92 af/al 120.000 Test results include 1KLHV-51268 1 KLHV-5152B 04/05/94 af 88.000 1KLHV-51528 04/07/94 al 238.000 t
i 1 KLHV-5126B 01/13/91 af 375.000 1 KLHV-51268 01/25/91 al 87.800 1 KLHV-51268 09/17/92 af 120.000 Test results include 1KLHV-5152B 1KLHV-5126B 09/22/92 al 98.000 1 KLHV-5126B 04/05/94 af/al 154.000 Containment Penetratir.,n P288 - PCIG 1 KLHV-5152 A 01/07/91 aflat 104.000 1XLHV-5152 A 09/24/92 af 142.500 1KLHV-5152A 10/06/92 al 145.000 1KLHV-5152 A 03/27/94 af/al 355.000 Test results include 1KLHV-5126A 1KLHV-5126A 01/07/91.
af/al 45.000 101LHV-5126A 09/24/92 aFal 165.000 1XLHV-5126A -
03/27!94 af 355 000 Test resutts include 1KLHV-5152A i
1 KLHV-5126A 04/03/94 at 27.000 l
Contahment Penetraten P29 - RACS 1EDHV-2554 01/24/91 af/al 107.000 l
1EDHV-2554 10/08/92 af 15A 000 i
1EDHV-2554 10/17/92 at 1.2000 1EDHV-2554 03/27/94 af 304.000 l
Page 23 of 46
Reactor Containment Building Integrated Leak Rate Test.
Ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS 1EDHV-2554 04/08S 4 al 206.000 1 EDHV-2553 01/24/91 af 648.000 1 EDHV-2553 01/24/91 al 558 000 1 EDHV-2553 10/08/92 af 371.000 1 EDHV-2553 10/17/92 al 130.000 1 EDHV-2553 03/27/94 af 820.000 1 EDHV-2553 04/08/94 al 125 000 Contahment Penetration P30 - RACS 1 EDHV-2556 01/24/91 af/al 8.700 1 EDHV-2556 10/08/92 af 11.000 1 EDHV-2556 10/19/92 at 397 000 1 EDHV-2556 03/28/94 af 184.000 1 EDHV-2556 04/08/94 al 4.000 1 EDHV-2555 01/24/91 af
> 1.0 La 1 EDHV-2555 01/24/91 al 0000 1 EDHV-2555 10/08/92 af 150.000 1EDHV-2555 10/20/92 al 351.000 1 EDHV-2555 03/28/94 af 20000 000 1 EDHV-2555 04/08/94 al 9 000 Contanment Penetraton P31 Breathng Air 1KGV-016 12/29/90 afial 130.000 1 KGV-016 09/22/92 af'ai 70.000 1 KGV-016 03/17/94 aval 33.000 1 KGV-034 12/29/90 af/at 163.000 1 KGV-034 09/22/92 af!al 51.000 1 KGV-034 03/17/94 aflat 5.000 Containment Penetration P34A -TIPS P34A F1 01/02/91 af!al 0.000 P34A F1 10/10/92 af/a!
1.100 P34A F1 03/25/94 aflat 3.000 Contahment Penetraton P34B - TIPS P34B F1 01/02/91 aflat 0.000 P34B F1 10/10/92 af/al 1.700 Page 24 of 46
Reactor Containment Building Integrated Leak Rate Test.
Hope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS P34B F1 03/25/94 af/a!
2.000 Contariment Penetration P34C - TIPS P34C F1 01/02/91 af/al 0000 P34C F1 10/10/92 afial 0800 P34C F1 03/25/94 al/al 1.000 Contarwnent Penetration P34D - TIPS P34D F1 01/02/91 aftal 0.000 l
P34D F1.
10/10/92 af/al 0.700 P34D F1 03/22/94 aflat 6.000 Contartment Penetration P34E - TIPS P34E F1 01/02/91 af/al 0.000 P34E F1 10/10/92 af/al 4.100 l
P34E F1 03/25/94 af/al 2.000 Containment Penetration P34F - TIPS (Ntrogen Purge) i 1SEV-006 01/02/91
' af 7000.000 1SEV-006 01/23/91 al 3 000 1SEV-006 10/10/92 af 999.000 1SEV-006 10/23/92 at 8.500 ISEV-006 03/17/94 a f/al 10.000 1SEHV-5161 01/02/91-af'al 4.000 i
I 1SEHV-5161 10/10/92 af/al 10.000 1SEHV-5161 03/17/94 af/al 24 000 P34F F1 01/02/91 af/al 0.000 P34F F1 10/10/92 af/al 0.600 P34F F1 03/25/94 af/al 2.000 i
Containment Penetration P38A - Chir Water 1GBHV-9531 A3
' 01/23/91 af/al 1F5.000 Test results include 1GBPSV-9522B 1GBHV-9531 A3 10/16/92 af 90.000 Test resuns include 1GBPSV-9522B 1GBHV-9531 A3 10/20/92 al 40.000 Test resuts include 1GBPSV-95228 1GBHV-9531A3 04/01/94 at/al 2.000 Test results include 1GBPSV-9522B 1GBHV-953183 01/22!91 af 10400.000 1GBHV-953183 01/30/91
. al 645.000 Page 25 of 46
,.e, m.,,
w v
Reactor Containment Building Integrated I eek Rate Test IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS 1G0HV-953183 10/16S2 af 18 000 1GBHV-953183 10/20/92 at 59.000 1GBHV-9531B3 04'01/94 aval 100.000 1GBPSV-95228 01/23/91 afial 185 000 Test results include 1GBHV-9331 A3 1GBPSV-9522B 10/16/92 af/a!
90.000 Test results include 1GBHV-9531 A3 1GBPSV-9522B 04/01/94 a f'al 2.000 Test results rnclude 1GBHV-9531 A3 1GBXJN-38A I 01/03/91 af!al 40.500 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B I,1BCXJN-4B O 1BCXJN-6C 1,1BCXJN-6C O.
1 BCXJ N-6D I,1 BCXJ N-6D O,1 BEXJ N-5B I,1 BEXJ N-5B O,1 FDXJ N-71,1 FDXJ N-7 O,1 G BXJ N-38A O.1 G BXJ N-388 I,1GBXJN-38B O 1GBXJN-38A i 10/08/92 af/al 37.000 Test results eclude 1BCXJN-31,1BCXJN-3 0,1BCXJN481,1BCXJN-48 0,1BCXJN-6C I,1BCXJN-6C 0, 1 BCXJN-60 t,1 BCXJ N-6D O,1 BEXJN-5B 1,1 BEXJN-5B O,1 FDXJN-71,1 FDXJN-7 0,1GBXJN-38B 1,1GBXJ N-388
- 0 1GBXJN-38A I 03.02/94 af/al 0000 1GBXJN-38A O 01/03/91 a f/al 40.500 Test results include it3CXJN 31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-4B O,1BCXJN-6C 1,1BCXJN-6C O, 1 BCXJN-60 l,1 BCXJN-60 O,1 BEXJ N-5B I,1 BEXJN-5B O,1 FDXJ N-71,1 FDXJ N-7 O,1GBXJN-38A t,1GBXJN-38B 1,1GBXJN-388 0 1GBXJN-38A O 10/09/92 af/al 108.000 1GBXJN-38A O 10/22/92 aflal 91.000 1GBXJN-38A O 03/01/94 af 121.000 1GBXJN-38A O 03.02/94 al 130.000 Contahment Penetration P388 - Chill Water 1GBHV-9531 B4 01/23/91 af/al 5.000 1GBHV-953184 10/16G2 af 138.000 1GBHV-9531 B4 10/20/92 al 426.000 1GBHV-9531 B4 04!O1/94 af/al 11.000 1GBPSV-9523B 01/23/91 atal 339.000 Test results include 1CBHV-9531 A4 1GBPSV-9523B 10/16/92 af 35.000 Test resu!ts include 1GBHV-9531 A4 1GBPSV-9523B 10/21/92 al 8 000 Test results include 1GBHV-9531 A4 1GBPSV-95238 04.01/94 afial 12.000 Test results include 1GBHV-9531 A4 1GBHV-9531 A4 01/23/91 af/al 339.000 Test results include 1GBPSV-9523B 1GBHV-9531 A4 10/16/92 af 35.000 Test results include 1GBPSV-95233 1GBHV-9531 A4 10/21/92 al 8.000 Test resu'ts include 1GBPSV-95238 1GBHV-9531 A4 04.01/94 af!al 12.000 Test results include 1GBPSV-9523B Page 26 of 46
I Reactor Containment Building Integrated Leak Rate Test.
l Ilope Creek Generating Station, April 1994 Appendix F (continued) l TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS m.__
1GBXJN-38B I 01/03/91 afial 40 500 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-481,1BCXJN-48 O 1BCXJN-6C I,1BCXJN-6C O, 1 BCXJ N40 l,1 BCXJN-6D O,1 BEXJN-581,1 BEXJN-5B O,1 FDXJN-71,1 FDXJN-7 O,1GBXJN-38A 1,1GBXJ N-38A O, iGBXJN-38B O 1GBXJN-38B l 10SB/92 aflal 37 000 Test results include 1BCXJN-31,1BCXJN-3 O,1BCXJN-4B 1,1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6C O.
1BCXJN-6D 1,1BCXJN-60 O 1BEXJN-5B 1,1BEXJN-5B O,1FDXJN-71,1FDXJN-7 O,1GBXJN-38A t,1GBXJN-38B O
1GBXJN-38B 1 03S1/94 a f,al 34.000 Test results include 1BCXJN-31,1BCXJN-3 0,1BCXJN-4B I,1BCXJN-4B O.1BCXJN-6C 1,1BCXJN-6C O, 1BCXJN-6D I,1BCXJN-60 O 1BEXJN-5B 1,1BEXJN-5B 0,1FDXJN-71,1FOXJN-7 O,1GBXJN-38B O 1GBXJN-388 0 01/03/91 af/al 40.500 Test results include 1BCXJN-31,1BCXJN-3 0,1BCXJN-4B 1,1BCXJN-4B O,1BCXJN-6C 1,1BCXJN-6C O.
1 BCXJ N-6D 1,1 BCXJ N-60 O 1 BEXJN-5B 1,1 BEXJN-5B 0,1 FOXJN-71,1 FDXJN-7 C.1GBXJN-38A 1,1GBXJ N-38A O, 1GBXJN-388 l 1GBXJN-38B O 10M8S2 af/al 37.000 Test results include 1BCXJN-31,1BCXJN-3 O.1BCXJN-4B 1,1BCXJN-4B O,1BCXJN-6C I,1BCXJN-6C O, 1 BCXJ N-60 l,1 BCXJN-6D O,1 BEXJN-5B I,1 BEXJN-58 O,1 FDXJN-71,1 FDXJN-7 O,1GBXJN-38A 1, ' 3BXJN-388 1
1GBXJN-38B O 03S1/94 aftal 34 000 Test resutts include 1BCXJN-31,1BCXJN-3 O,1BCXJN-481,1BCXJN-4B O.1BCXJN-6C l 1BCXJN-6C O, 1BCXJN-6D I,1BCXJN-60 O 1BEXJN-5B 1,1BEXJN-58 O,1FDXJN-71,1FDXJN-7 O,1GBXJN-388 i Contahment Penetration P39 - PCIG 1 KLHV-5148 01/29 S1 aflal 24.000 1 KLHV-5148 09/17/92 aflat 18.000 1 KLHV-5148 03/26/94 af 17.000 1 KLHV-5148 03/31/94 al 14.000 1 KLHV-5147 01/29 S1 af/ai 19 000 Test results enclude 1KLHV-5162 1KLHV-5147 09/17/92 af 18 000 Test results include 1KLHV-5162 1 KLHV-5147 09/24/92 al 22 000 1 KLHV-5147 03/26/94 af 19 000 Test results include 1KLHV-5162 1 KLHV-5147 03/31/94 al 12.000 Test results include 1KLHV-5162 1KLHV-5162 01'2991 arai 19.000 Test results include 1KLHV-5147 1 KLHV-5162 09/17/92 aflat 18 000 Test results include 1KLHV-5147 1KLHV-5162 03/26/94 af 19.000 Test results include 1KLHV-5147 1 KLHV-5162 03/31/94 al 12.000 Test results include 1KLHV-5147 Contahment Penetration P204 - RCIC Steam 1 FCHV-F084 01/22/91 af!al 85 000 1 FCHV-F084 09/19/92 af 125 300 1FCHV-F084 10/10/92 al 290 000 1FCHV-F084 03S7/94 af/al 294 000 Page 27 of 46
Reactor Containment Building Integrated Leak Rate Test-IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS Containment Penetrafon P204 - HPCI Steam 1 FDHV-F079 01/21/91 at'al 105 000
- 1FDHV-F079 09/19S2 af 225 000 1FDHV-F079 10/04 S 2 al 208.000 1 FDHV-F079 03/07/94 a t'al 140.000 Containment PeneWaton P214A - RP1R (Torus Spray) 1 BCHV-F027B 01/15/91 aftal 4.000 1BCHV-F027B 10/25/92 af/al 14.500 1 BCHV-F027B 03/23/94 af 3.000 18CHV-F027B 03/29/94 al 27 000 Containment Penetraton P2148 - RHR (Torus Spray) 1 BCHV-F027A 01/05/91 a t'al 58.000 1 BCHV-F027A 09/24/92 af 61.000 1 BCHV-F027A 09/28/92 al 47.000 1 BCHV-F027A 03/13/94 af/al 29 000 Containment Penetraton P219 - Hydrogen Recombiner 1GSHV-50538 01/18/91 af/al 58.000 1GSHV-50538 09/15/92 af/sl 110 000 1GSHV-5053B 02m9S4 af
> 1.0 La 1GSHV-50538 02/10/94 al 290.000 1GSHV-5053B 03/09 S4 al 130.200 1GSHV-5054B 01/18/91 afial 46.000 1GSHV-50548 09/14/92 atial 110.000 1GSHV-5054B 0309S4 a t'al 124.400 Contariment Penetraton P219 - Torus Purge 1GSHV-4962 01/18/91 af 10050.000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 02 O2191 al 720.000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 05/08/91 aflal 200 000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 08/09/91 af/al 404 000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 11/15/91 at/al 291.000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 03M8/92 af/al 778.000 Test resuts include 1GSHV-4963,1GSHV-4964 1GSHV-4962 0605/92 aflal 620.000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 09/11/92 a t'al 540.000 Test results include 1GSHV-4963,1GSHV-4964 1GSHV-4962 10/31/92 al 623.000 Test results include 1GSHV-11541,1GSHV-4963,1GSHV-4964 1GS HV-4962 03/11/94 af 24100 000 Test resutts include 1GSHV-11541,1GSHV-4963,1GSHV-4964 Page 28 of 46
=
ww
Reactor Containment Building Integrated Leak Rate Test-1 Ilope Creek Generating Station, April 1994 Appendix F (continued)
I TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS j
1GSHV-4962 04r24S4 al 780 000 Test results include 1GSHV-11541,1GSHV-4963,1GSHV-4964 1GSHV-4963 01/18/91 af 10050.000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 02/02/91 al 720 000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 05/08/91 at/al 200 000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 0809/91 af'al 404 000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 11/15!91 aPal 291.000 Test results include 1GSHV-4962,1GSHV 4964 1GSHV-4963 03S8/92 aEat 778 000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 06/05/92 af/al 620 000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 09/11/92 af/al 540.000 Test results include 1GSHV-4962,1GSHV-4964 1GSHV-4963 10/31/92 al 623 000 Test results include 1GSHV-11541,1GSHV-4962,1GSHV-4964 1GSHV-4963 03/11/94 af 24100.000 Test results include 1GSHV-11541,1GSHV-4962,1GSHV-4964 1GSHV-4963 04/24/94 al 780 000 Test results include 1GSHV-11541,1GSHV-4962,1GSHV-4964 1GSHV-4964 01/18/91 af 10050.000 Test results include 1GSHV-4962,1GSHV-4963 1GSHV-4964 02/02/91 at 720.000 Test results include 1GSHV-4962,1GSHV 4963 1GSHV-4964 05/08/91 af/al 200 000 Test resuts include 1GSHV-4962,1GSHV-4963 1GSHV-4964 08/0991 af!al 404.000 Test results include 1GSHV-4962,1GSHV-4963 1GSHV-4964 11/15s1 af!al 291.000 Test results include 1GSHV-4962,1GSHV-4963 1GSHV-4964 0308/92 aflal 778.000 Test results include 1GSHV-4962,1GSHV-4963 1GSHV-4964 06 S5/92 afial 620.000 Test results include 1GSHV-4962,1GSHV-4963 1GSHV-4964 09/11/92 aval 540 000 Test results include 1GSHV-4962,1GSHV-4963 1GSHV-4964 10/31/92 al 623.000 Test results include 1GSHV-11541,1GSHV-4962,1GSHV-4963 1GSHV-4964 03/11/94 af 24100.000 Test results include 1GSHV-11541,1GSHV-4962,1GSHV-4963 1GSHV-4964 04/24'94 al 760.000 Test results include 1GSHV-11541,1GSHV-4962,1GSHV-4963 P219 P1 10/31192 al 88.000 P219 P1 03/11/94 af 81,000 P219 P1 04/11/94 af 24 000 P219 F1 01/25/91 af/al 3.000 P219 F1 09/12/92 af 0.000 P219 F1 10/31/92 at 0.000 P219 F1 03/12/94 af 2.000 P219 F1 04/24/94 al 0.000 P219 W1 09/25/92 at 0.000 Contahment Penetration P219 - Vent 1GSHV-11541 10/31/92 al 623 000 Test results include 1GSHV-4962,1GSHV-4963,1GSHV-4964 Page 29 of 46
Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COYPONENT DATE TYPE (secm)
COMMENTS 1GSHV-11541 03/11G4 af 24100 000 Test results include 1GSHV-4962,1GSHV-4963,1GSHV-4964 1GSHV-11541 04/24/94 al 780 000 Test results include 1GSHV-4962,1GSHV-49G3,1GSHV-4964 Containment Penetration P219 - Vacuum Relief 1GSHV-5029 01/18St af
> 1.0 La Test results enclude 1GSPSV 5030 1GSHV-5029 0208St al 11.200 Test results include 1GSPSV-5030 1GSHV-5029 09/14/92 af 1.000 1GS HV-5029 10/29/92 at 301.000 Test results include 1GSPSV-5030 1GSHV-5029 03/12/94 af 53000.000 1GS HV-5029 04/24/94 al 5120 000 Test results include 1GSPSV-5030 1GSPSV-5030 01/18/91 af
> 1.0 La Test results include 1GSHV-5029 1GSPSV-5030 02/08/91 al 11.200 Test results include 1GSHV-5029 1GSPSV-5030 09/14 S2 af
> 1.0 La 1GSPSV-5030 10/29/92 al 301.000 Test resu!ts include 1GSHV-5029 1GSPSV-5030 03/24S4 af 1109 000 1GSPSV-5030 04/24/94 al 5120.000 Test results include 1GSHV-5029 P219 P2 10/31/92 al 51000 P219 P2 03/12/94 af 42.000 P219 P2 04/24/94 al 16 000 P219 F2 01/25/91 a'/al 4 000 P219 F2 09/14/92 af 48.000 P219 F2 10/26/92 al 7.500 P219 F2 03/12/94 af 0.000 P219 F2 04/24S4 al 0.000 Contasiment Penetration P220 - Hydrogen Recombiner 1GSHV-5054A 01/15/91 af/al 6.000 1GSHV-5054 A 09/22/92 af/al 20.100 1GSHV-5054A 03/08/94 af/al 211.000 1GSHV-5053A 01/15/91 afial 69.500 1GSHV-5053A 09/22/92 af 1014.000 1GSHV-5053A 10/09/92 al 145.000 1GSHV-5053A 03/08/94 af 1066.000 1GSHV-5053A 03X)8/94 al 440.000 Page 30 of 46
Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (m)
COMMENTS Contahment Penetration P220 - Vacuum Relief 1GSHV-5031 01/15/91 af/al 530.000 Test results include 1GSPSV-5032 1GSHV-5031 09/22/92 af/al 665 000 Test resuRs include 1GSPSV-5032 1GSHV-5031 03,06/94 af 803.000 Test results include 1GSPSV-5032 1GSHV-5031 04/05/94 al 654 000 Test resuRs include 1GSPSV-5032 1GSPSV-5032 01/15/91 af!al 530 000 Test resuns include 1GSHV-5031 1GSPSV-5032 09/22!92 aflal 665 000 Test resuRs include 1GSHV-5031 1GSPSV-5032 03/06/94 af 803 000 Test resuRs include 1GSHV-5031 1GSPSV-5032 04/17/94 al 1515 000 P220 F2 01/25S1 af/al 2.000 P220 F2 09/22/92 af/al 1.400 P220 F2 0306/94 af 0.000 P220 F2 04/06/94 al 2.000 Contariment Penetration P221 A - 12
- Torus Drain P221A 12/30/90 aflat 1.000 P221A 09/30/92 af/al 0.000 P221A 03/05/94 aflal 1.000 Contahment Penetraton P221B - 62
- Torus Drain P221B 12/30/90 af!al 1.000 P221B 09/30/92 aflal 0000 P221B 03/05/94 af!al 2.000 Contariment Penetraton P221C - 287
- Torus Drain P221C 12/30/90 af/al 5.000 P221C 09/30/92 af/al 0.000 P221C 03/05/94 aflal 0000 Contahment Penetration P221D - 330
- Torus Drain P221D 12/30/90 af/al 5.000 P2210 09/30/92 af/al 0.000 P221D 03/05/94 af!al 2.000 Contahment Penetration P227. PASS 1 RCSV-0643A 12/11/90 af!al 6.500 1RCSVR43A 07/05/91 al 3 000 1RCSV-0643A 09/26/92 af/al 3.000 1 RCSV-0643A 03/17/94 af 75 000 Page 31 of 46
Reactor Containment Building Integrated Leak Rate Test-IIOpe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secrn)
COMMENTS C2 03/06/94 af/al 0000 Contahment Penetration C2 - Dryweg Equprnent Hath Airbck AIRLOCK INNER 03/25/90 af
> 1.0 La AIRLOCK INNER 03/26/90 aflal 870.000 Test results include AIRLOCK OUTER AIRLOCK INNER 09/27/90 af/al 1233.000 Test results include AIRLOCK OUTER AIRLOCK INNER 02/16/91 af/al 852.000 Test results include AIRLOCK OUTER AIRLOCK INNER 05/10/91 al 2320.000 Test results include AIRLOCK OUTER nlRLOCK INNER 11/01/91 af/al 1475 000 Test results include AIRLOCK OUTER AIRLOCK INNER 03/14/92 af!al 1011.000 Test results include AIRLOCK OUTER AIRLOCK INNER 11/05S2 af/al 4040.000 Test results include AIRLOCK OUTER AIR LOCK INN ER 04/30/93 atal 652.000 Test results include AIRLOCK OUTER AIRLOCK INNER 10/22/93 af/al 1345.000 Test resuRs include AIRLOCK OUTER AIRLOCK INNER 04/10/94 af
> 1.0 La AIRLOCK INNER 04/11/94 at 1267.000 Test results include AIRLOCK OUTER AIRLOCK OUTER 03/26SO af/al 870 000 Test results include AIRLOCK INNER AIRLOCK OUTER 09/27/90 af/al 1233 000 Test results include AIRLOCK INNER AIRLOCK OUTER 02/16/91 af/al 852.000 Test results include AIRLOCK INNER AIRLOCK OUTER 05/10/91 al 2320 000 Test results include AIRLOCK INNER AIRLOCK OUTER 11/01/91 aflat 1475.000 Test results include AIRLOCK INNER AIRLOCK OUTER 03/14/92 aval 1011.000 Test results include AIRLOCK INNER AIRLOCK OUTER 11/05/92 af/al 4040.000 Test results include AIRLOCK INNER AIRLOCK OUTER 04/30/93 af/al 652.000 Test results include A;RLOCK INNER AIRLOCK OUTER 10/22S 3 aftal 1345.000 Test results include AIRLOCK INNER AIRLOCK OUTER 04/11/94 af/al 1267.000 Test results include AIRLOCK INNER Containtnent Penetration C3 - CRD Hath C3 01/02/90 af 0.000 l
C3 03/25/90 at 0.000 C3 11/13/90 al 0.000
(
C3 02/14/91 at 0000 C3 05/10/91 al 0.000 C3 03/12/92 al 1.600 1
C3 05/28/92 at 0.000 l
C3 09/12/92 af/al 0.000 i
C3 11/03/92 at 1.000 l
C3 05/18/93 at 0.000 l
C3 12/04/93 al 5.000 l
C3 04/16/94 at 0000 l
Page 40 of 46 i
Reactor Containment Building Integrated Leak Rate Test,
110pe Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS C3 04/16/94 at 0.000 Containment Penetration C4 - DryweR Head C4 12/26/90 af 18.000 C4 02/11/91 al 14.800 C4 09/12/92 af 26.000 C4 10/25/92 al 16.000 C4 03/05/94 af 62.700 C4 04/10/94 al 9 000 Contarunent Penetraton C5 - Drywet Head Inspecthan Hatch C5 12/29/90 af/al 1.600 C5 09/16/92 aflal 0.000 C5 0307/94 af/al 2.000 Containment Penetraton C201 A - 90* Torus Hath C201A 12/26/90 af/at 5.000 C201A 09/12/92 af/al 0.000 C201A 0303/94 af 2.000 C201A 04/17/94 al 3 000 Containment Penetration C2018 - 270* Torus Hatch C201B 12/26/90 af 3.000 C2018 02M5/91 al 2.000 C201B 02/13/91 at 0.000 C201B 03/08/92 af 4.000 C201B 03/13/92 al 2.800 C2010 05/29/92 al 2.000 C2018 05/30/92 al 2.200 C201B 11/05/92 at 6.000 C201B 03/03/94 af 2.000 C201B 04/10/94 al 2.000 Containment Penetration C201C - 180* Torus Hatch C201C 12/26/90 af/al 3.000 C201C 09/12/92 af/al 0.000 C201C 03/04/94' af/al 2.000 Containment Penetration C201D - 0* Torus Hatch C201D 12/2600 af/al 3.000 Page 41 of 46
- ~.
Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS C201D 09/12/92 af/al 0.000 C201D 0303S4 af 3.000 C201D 03/18!94 af 0.000 Contahment Penetration W100A - Electncal Cable W100A 01/22/91 af/al 10 000 Test results include W102A, W104F, W104G, W104H, W104J, W104 K, W105A, W105E, W105F, W106A W100A "9S2 afial 7.500 Test results include W102A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W105F, W106A W100A 05. ' ')4 atz l 0000 Test results include W102A, W104F, W104G, W104H, W104J, W104K, W105A, W10SE, W105F, W106A a
Containment Penetration W 008 - Electrtal Cable W100B 01/06 S 1 af/al 0.800 Test results include W1028, W105B. W105G, W105H W1000 09/28S2 af/al 0000 Test results include W101 A, W101 B. W101C, W102B, W105B, W105G, W105H W1008 03/01/94 af!al 3 000 Test results include W101 A, W1018, W101C, W102B, W105B, W105G, W105H Containment Penetration W1000 - Electrical Cable W1000 01/11/91 af 28 000 Test results include W102D, W103A, W104A, W1048, W1040, W104D, W104E, W105D W1068 W1000 01/11/91 at 0.000 Test results include W102D, W103A W104A, W104B. W104C, W104E, W105D, W1068 W1000 10/08/92 af/al 16 800 Test resul's include W102D, W103A, W104A, W1048, W104C, W104D, W104E, W105D, W1068 W100D 02/28/94 af/al 11.100 Test resuRs include W102D, W103A W104A, W1048, W104C, W104D W104E, W105D W106B Contahment Penetraton W101 A - Electrical Cable W101 A 01/06/91 af/al 0.800 W101A 09/28/92 af/al 0000 Test results include W1008, W101B, W101C, W1028 W105B, W105G, W105H W101A 03/01/94 af/al 3 000 Test results include WiOOB, W101 B, W101C, W102B, W105B, W105G, W105H Containment Penetraten W1018 - Electrical Cable W101B 01/06/91 at'al 1.000 W101B 09/28S2 af/al 0.000 Test results include W1008 W101 A, W101C, W102B, W1058. W105G, W105H W101 B 03/01/94 af/al 3.000 Test results include W1008, W101 A, W101C, W1028. W105B W105G, W105H Containment Penetraton W101C - Electrical Cable W101C 01/06/91 af/al 0.400 W101C 09/28/92 af/al 0000 Test results include W1008. W101 A, W1018, W1028 W105B, W105G, W105H W101C 03/01/94 af/al 3 000 Test results include W1008 W101 A, W101B, W1028, W105B, W105G. W105H Contahment Penetraten W102A - Electrical Cable W102A 01/22/91 af/al 10 000 Test results include W100A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W105F, W106A W102A 10/08/92 af/al 7.500 Test results include W100A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W105F, W106A W102A 03/01194 af!al 0.000 Test results include W100A, W104F, W104G, W104H, W104J W104K, W105A, W105E, W105F, W106A Page 42 of 46
4 Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS Contahment Penetraton W102B - Electrical Cable W102B 01!06/91 atal 0800 Test results include W100B, W105B, W105G, W105H W102B 09/28S2 af'ai 0.000 Test results include W100B, W101 A, W101 B, W101C, W105B, W105G, W105H W102B 03/01/94 af/al 3 000 Test results include W1008. W101 A, W101B, W101C, W105B, W105G, W105H Contahment Penetraton W1020 - Electrical Cable W102D 01/11/91 af 28.000 Test results inciude W1000 W103A, W104A, W1048, W104C, W104D, W104E, W105D, W106B W102D 01/11/91 al 0.000 Test results include W1000. W103A, W104A, W104B, W104C, W104E, W1050 W106B W102D 10'08/92 af'al 16.800 Test results include W100D W103A W104A, W104B, W104C, W104D, W104E, W105D, W1068 W102D 02/28!94 aftal 11.100 Test results include W100D, W103A, W104A, W1048 W104C, W104D, W104E, W1050, W106B Contariment Penetraton W103A - Electncal Cable W103A 01/11/91 af 28 000 Test results include W1000, W102D, W104A, W104B, W104C, W104D, W104E, W1050, W1068 W103A 01/11/91 al 0.000 Test results include W1000, W102D, W104A, W104B, W104C, W104E, W1050, W106B W103A 10/08/92 af!al 16 800 Test results include W1000. W102D, W104A, W104B, W104C, W104D W104E, W105D, W1068 W103A 02/28/94 af/al 11.100 Test results include W1000, W102D, W104A, W104B, W104C, W104D, W104E, W105D, W1068 Containment Penetraton W104A - Electrical Cable W104A 01/11/91 af 28.000 Test results include W1000, W102D, W103A, W104B, W104C, W1040, W104E, W105D, W106B W104A 01/11/91 al O.000 Test results include W1000. W102D, W103A W1048, W104C, W104E, W1050, W1068 W104A 10/08/92 afial 16.800 Test results include W1000, W102D, W103A, W1048, W104C, W104D, W104E, W105D, W1068 W104A 02/28/94 aflal 11.100 Test results include W1000, W102D, W103A, W104B, W104C, W104D W104E, W105D, W106B Contahment Penetraton W1048 - Electrical Cable W104B 01/11/91 af 28.000 Test results include W100D, W102D, W103A W104A, W104C, W1040, W104E, W1050, W106B W104B 01/11/91 at 0000 Test results include W1000, W102D, W103A, W104A, W104C, W104E, W105D, W1068 W104B 10/08/92 af/al 16.800 Test results include W100D, W102D, W103A, W104A, W104C, W104D, W104E, W105D, W106B W1048 02/28/94 af/al 11.100 Test results enclude W1000. W102D, W103A, W104A, W104C, W104D, W104E, W105D, W106B Contahment Penetraton W104C - Electrical Cable W104C 01/11/91 af 28.000 Test results include W100D, W102D, W103A, W104A, W1048 W104D, W104E, W105D, W1068 W104C 01/11!91 at 0.000 Test results include W100D, W102D, W103A, W104A, W104B, W104E, W105D, W106B W104C 10/08/92 aflat 16.800 Test results include W100D, W102D, W103A W104 A. W104B, W104D, W104E, W105D. W1068 W104C 02/28/94 af/ai 11.100 Test results include W100D, W102D, W103A, W104A, W104B, W104D, W104E, W105D, W106B Containment Penetraton W104D - Electrical Cable W1040 01/11/91 af 28 000 Test results include W1000, W102D, W103A, W104A, W104B W104C, W104E, W105D, W106B W104D 01/11/91 al 27.000 W104D 10/08/92 af!al 16 800 Test results include W100D, W102D, W103A, W104A, W104B W104C, W104E, W105D, W106B Page 43 of 46 i
s Reactor Containment Building Integrated Leak Rate Test.'
IIOpe Creek Generating Station, April 1994.
Appendix F (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS W104D 02/28/94 af/al 11.100 Test results include W1000, W102D, W103A W104A, W104B, W104C, W104E, W1050, W106B Contahment Penetration W104E - Electrical Cable W104E 01/11/91 af 28.000 Test results include W1000, W102D, W103A, W104A, W1048, W104C, W104D W105D, W1068 W104E 01/11/91 at 0.000 Test results include W1000, W102D, W103A, W104A, W104B, W104C, W105D, W106B r
W104E 10S8S2 af/al 16 800 Test results include W100D, W102D, W103A, W104A, W1048 W104C, W104D, W105D, W106B I
W104E 02/28/94 af/al 11.100 Test results include W1000. W102D, W103A, W104A, W104B, W104C, W1040 W105D, W106B L
Contahment Penetraton W104F - Electncal Cable W104F 01/22 S 1 af/al 10.000 Test results include W100A, W102A, W104G, W104H, W104J W104K, W105A, W105E, W105F, W106A W104F 10/0 !92 af/al 7.500 Test results include W100A, W102A, W104G, W104H, W104J, W104K, W105A, W105E, W105F, W106A l
W104F 03/01S 4 af!al 0000 Test results include W100A, W102A, W104G, W104H, W104J, W104K, W105A, W105E W iO5F, W106A l
Contahment Penetration W104G - Electrical Cable W104G 01/22/91 af/al 10.000 Test results include W100A, W102A, W104F, W104H, W104J, W104K, W105A, W105E, W105F, W106A W104G 10/08/92 af/at 7.500 Test results include W100A, W102A, W104F, W104H, W104J, W104K, W105A, W105E W105F, W106A W104G 03/01/94 afial 0.000 Test results include W100A, W102A, W104F, W104H, W104J. W104K, W105A, W105E, W105F, W106A i
Containment Penetration W104H Electrical Cable W104H 01/22/91 af/at 10.000 Test results include W100A, W102A, W104F, W104G, W104J, W104K, W105A, W105E, W105F, W106A W104H 10/08/92 af/al 7.500 Test results include W100A, W102A, W104F, W104G, W104J, W104K, W105A, W105E, W105F, W106A W104H 03/01/94 affal O.000 Test tesutts include W100A, W102A, W104F, W104G, W104J, W104K, W105A, W105E, W105F, W106A Contahment Penetration W104J - Electncal Cable W104J 01/22/91 af/al 10 000 Test results include W100A, W102A, W104F, W104G, W104H, W104K, W105A, W105E, W105F, W106A t
W104J 1008/92 af/al 7.500 Test results include W100A, W102A, W104F, W104G, W104P, W104K, W105A, W105E, W105F, W106A W104J 0301/94 af/al 0000 Test results include W100A, W102A, W104F, W104G, W100 1104K, W105A, W105E W105F, W106A Contahment Penetration W104K - Electrical Cable 1
W104K 01/22/91 af/al 10.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W105A, W105E, W105F, W106A l
W104K 10S8/92 af/al 7.500 Test results include W100A, W102A, W104F, W104G, W104H, W104J W105A, W103E, W105F, W106A W104K 03/01/94 af/al 0.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W105A, W105E, W105F, W106A Containment Penetration W105A - Electrical Cable W105A 01/22/91 af!al 10.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J W104K, W105E, W105F, W106A W105A 1008/92 aflal 7.500 Test resutts include W100A, W102A, W104F, W104G, W104H, W104J. W104K, W105E, W105F, W106A W105A 03/01/94 af/al 0.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J W104K, W10SE, W105F, W106A s
Containment Penetraton W1058 - Electrical Cable W105B 01/06/91 af/al 0.800 Test results include W1000, W102B, W105G, W105H Page 44 of 46 i
Reactor Containment Building Integrated Leak Rate Test-llope Crrek Generating Station, April 1994 Appendix F (continued)
TEST LEAXAGE COMPONENT DATE TYPE (sccm)
COMMENTS
-.. = _ _.
W105B 09/28192 af/al 0 000 Test resu!!s include W1008 W101 A, W101B, W101C, W1028. W105G, W105H W1058 0301/94 atal 3.000 Test results include W1008 W101 A, W101B, W101C, W102B, W105G, W105H Containrnent Penetraton W10$D - Electncal Cabne W105D 01/11/91 af 28 000 Test results include W1000, W102D, W103A, W104A, W104B, W104C, W1040, W104E, W1068 W1050 01/11/91 at 0.000 Test results include W1000, W102D, W103A, W104A, W1048. W104C, W104E, W1068 W105D 1048/92 af!ra 16 800 Test results include W1000 W102D, W103A, W104A, W104B W104C, W104D W104E, V.f106B W105D 02/28/94 af/al 11.100 Test results include W100D, W102D, W103A. W104A, W104B, W104C, W104D, W104E, Vn 1068 Containment Penetraton W105E - Electrical Cable W105E 01/22/91 af/al 10.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, W105F, W106A W105E 10/08/92 af/al 7.500 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, Vt105F, W106A W105E 03/01/94 af/al 0.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, W505F, W106A Contariment Penetration W105F - Electrical Cable W105F 01/22/91 af/al 10 000 Test results include W100A, W102A, W104F, W104G, W104H, W104J W104K, W105A, W105E, W106A W105F 10S8/92 af/al 7.500 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W106A W105F 03 S1/94 aflal 0.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J. W104K, W105A, W105E, W106A Containrnent Penetraton W105G - Electrical cable W105G 01/06/91 af/al 0.800 Test results include W1000, W1028, W105B, W105H W105G 09/28/92 af/al 0.000 Test resuRs include W1008, W101 A, W101 B, W101C, W1028, W1058. W105H W105G 03/01/94 af/al 3.000 Test results Mclude W1008, W101 A, W101B, W101C, W1028, W105B, W105H Contarvnent Penetrah W105H - Electrical Cable W105H 0106/91 af/al 0.800 Test results include W #008, W102B, W1058. W105G W105H 09/28/92 aflat 0.000 Test results include W100B, W101 A, W101B, W101C, W102B, W1058 W105G W105H 03/01/94 afiat 3 000 Test results include W100B, W101 A, W101 B, W101C, W102B, W105B, W105G Containment Penetraton W106A - Electncal Cable W106A 01/22!91 af/al 10.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W105F W106A 10/08/92 affal 7.500 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W105F W106A 0301/94 af/al O.000 Test results include W100A, W102A, W104F, W104G, W104H, W104J, W104K, W105A, W105E, W105F Containment Penetraton W106B - Electrical Cable W1068 01/11/91 af 28 000 Test results include W1000. W102D, W103A, W104A, W104B, W104C, W104D, W104E, W105D W1068 01/11/91 al 0.000 Test results hctude W100D, W102D, W103A, W104A, W1048, W104C, W104E, W105D W106B 10/08/92 aflat 16.800 Test results include W100D, W1020, W103A, W104A, W104B, W104C, W104D, W104E, W105D W1068 02!28/94 af/al 11.100 Test results include W100D, W102D, W103A, W104A, W104B, W104C, W104D, W104E, W105D Page 45 of 46
t Reactor Containment Building Integrated Leak Rate Test '
Ilope Creek Generating Station, April 1994
- i Appendix F (continued)
TEST LEAKAGE l
COMPONENT DATE TYPE (secm)
COMMENTS Contahment Penetraton W201 A - Electncal Cable W201A 0102/91 af/al 1.000 W201A 09/25/92 af/al 2.500 W201A 03/03/94 af/al 2.000 Containment Penetraten W201B - Electncat Cable W2018 01/02/91 af/al 3.700 W201B 09/30/92 aflaf 0000 W201B 03/03/94 aflat 3.000
?
Contaviment Penetraton W201C - Electncal Cable W201C 01/01/91 aflal 2.000 t
W201C 09/25/92 af/al 2.800 W201C 03/02/94 aflal 0000 Contarwnent Penetraton W201D - Electrical Cable W2010 01/02/91 aflat 3.000 W201D 09/22/92 aflat 1.200 W201D 03/03/94 af/al 0.000 j
Containment Penetraton W202A - Electrical Cable W202A 0101/91 at/al 1.500 W202A 10/12/92 at'al 0.000 W202A 03/02/94 af/al 3.000 Contahment Penetraton W203A - Electncal Cable W203A 01/02/91 af/al 1.000 W203A 10/10/92 af/al 0.000 W203A 03/03/94 af/al 2.000 4
i Page 46 of 46
.m
--.u....
..um m m...
. m.
.m m.
um m.-m m
m-
-m
- m. m.
Reactor Containment Building Integrated Leak Rate Test.
Hope Creek Generating Station, April 1994 Appendix G - Local Leakage Rate Test Data for Main Steam Lines TEST LEAKAGE COMPONENT DATE TYPE (scfh)
COMMENTS Containment Penetraton P1 A - Main Steam 1 ABHV-F022A 12/27/90 af
>46.0000 Test results include 1 ABHV-F067A,1KPHV-5834A 1 ABHV-F022A 01/31/91 al 1.5839 Test results include 1 ABHV-F067A,1KPHV-5834A 1 ABHV-F022A 09/17/92 af 8 4357 Test results include 1 ABHV-F067A,1KPHV-5834A 1 ABHV-F022A 10/16/92 al 10.9758 Test results ir clude 1 ABHV-F067A 1KPHV-5834A 1 ABHV-F022A 03/13/94 af/al 0 0220 Test results include 1 ABHV-F067A,1KPHV-5834A 1ABHV-F028A 12/27/90 af/al 3.3817 Test results include 1 ABHV-3631 A,1KPHV-5434B 1 ABHV-F026A 09/15/92 af 22_8297 Test results include 1 ABHV-3631 A,1KPHV-5434B 1 ABHV-F028A 10/13/92 al 4 5126 Test resuits include 1 ABHV-3631 A,1KPHV-5434B 1 ABHV-F028A 03/13/94 aflat 1.9913 Test results include 1 ASHV-3631 A,1KPHV-54348 1 ABHV-F067A 12/27/90 af
> 46 0000 Test results include 1 ABHV-F022A,1KPHV-5834A 1ABHV-F067A 01/31/91 al 1.5839 Test results include 1 ABHV-F022 A,1KPHV-5834A 1 ABHV-F067A 09/17/92 af 8.4357 Test results include 1 ABHV-F022A,1KPHV-5834A 1 ABHV-F067A 10/16/92 al 10.9758 Test results include 1 ABHV-F022A,1KPHV-5834A 1 ABHV-F067A 03/13!94 af 00220 Test results include 1 ABHV-F022A,1KPHV-5834A 1 ABHV-F067A 04/09/94 al 0.1276 1 KPHV-5834A 12/27/90 af
> 46.0000 Test results include 1 ABHV-F022A,1 ABHV-F067A 1 KPHV-5834A 01/31/91 al 1.5839 Test results include 1 ABHV-F022A,1 ABHV-F067A 1 KPHV-5834 A 03/16/92 at 0.0815 1 KPHV-5834A 09/17/92 af 8 4357 Test results include 1 ABHV-F022A,1 ABHV-F067A 1KPHV-5834 A 10/16/92 al 10.9758 Test results include 1 ABHV-F022A,1 ABHV-F067A 1 KPHV-5834A 03/13/94 af 0.0220 Test results include 1 ABHV-F022A,1 ABHV-F067A 1 KPHV-5834 A 04/09/94 al 0.1505 Contahment Penetration P1B - Main Steam 1 ABHV-F022B 12/29SO ai/al 7.3695 Test results include 1 ABHV-F0678.1KPNV-5835A 1 ABHV-F0228 09/15/92 af 11.7598 Test results include 1 ABHV-F067B,1KPHV-5835A 1 ABHV-F022B 10/14/92 al 2.3582 1 ABHV-F022B 03/13/94 af/al 2.0070 Test results include 1 ABHV-F067B,1KPHV-5835A 1 ABHV-F0288 12/29/90 aflat 0.0220 Test results include 1 ABHV-36318,1KPHV-5835B 1ABHV-F0288 09/15/92 af 2.7973 Test results include 1 ABHV-3631B,1KPHV-58358 1 ABHV-F0288 10/19/92 at 7.5890 Test results include 1 ABHV-3631B,1KPHV-5835B 1ABHV-F0288 03/13/94 af/al 2.1701 Test results include 1 ABHV-3631B,1KPHV-5835B 1ABHV-F067B 12/29SO af/al 7.3695 Test results include 1 ABHV-F022B,1 KPHV-5835A 1 ABHV-F067B 09/15/92 af 11.7598 Test results include 1 ABHV-F022B,1KPHV-5835A i
Page 1 of 3 l
Reactor Containment Building Integrated Leak Rate Test.
IIOpe Creek Generating Station, April 1994 Appendix G (continued)
TEST LEAKAGE COMPONENT DATE TYPE (scfh)
COMMENTS 1 ABHV-F067B 09/17/92 al 0.7244 Test resuRs include 1 ABHV-F0228,1KPHV-5835A 1 ABHV-F0678 03/13S 4 af 2.0070 Test resuRs include 1 ABHV-F022B,1KPHV-5835A 1 ABHV-F0678 04!23/94 al 0.5174 1 KPHV-5835A 12/29/90 atlaf 7.3695 Test results include 1 ABHV-F0228,1 ABHV-F0678 1 KPHV-5835A 09/15/92 af 11.7598 Test results include 1 ASHV-F0228,1 ABHV-F0678 1 KPHV-5835A 11/04/92 al 09157 1 KPHV-5835A 03/13/94 af 2 0070 Test results include 1 ABHV-F022B,1 ABHV-F067B 1KPHV-5835A 0406/94 al 0.1835 Contariment Penetraton Pic - Main Steam 1 ABHV-F022C 12/29/90 af
> 46 0000 Test results include 1 ABHV-F067C,1KPHV-5836A 1 ABHV-F022C 12/30/90 al 23.3628 Test results include 1 ABHV-F067C,1KPHV-5836A 1 ABHV-F022C 09/16/92 af 19.8505 Test resuRs include 1 ABHV-F067C,1KPHV-5836A 1 ABHV-F022C 10/14!92 al 3.2582 Test resuRs include 1 ABHV-F067C,1KPHV-5836A 1 ABHV-F022C 03/12/94 af 2.5464 Test results include 1 ABHV-F067C,1KPHV-5836A 1 ABHV-F022C 04/03/94 al 7.9026 1ABHV-F028C 12!28/90 af
> 46.0000 Test results include 1 ABHV-3631C iKPHV-58368 1 ABHV-F028C 01/26/91 al 2 3645 Test results include 1 ABHV-3631C,1KPHV-5836B 1 ABHV-F028C 09/16/92 af 2.7879 Test results include 1 ABHV-3631C,1KPHV-5936B 1 ABHV-F028C 10/18/92 al 2.8380 Test results include 1 ABHV-3631C,1KPHV-58368 1 ABHV-F028C 03/12/94 af/sl 0.8937 Test results include 1 ABHV-3631C,1KPHV-5836B 1 ABHV-F067C 12/29/90 af
> 46 0000 Test results include 1 ABHV-F022C,1KPHV-5836A 1 ABHV-F067C 12/30/90 al 23.3628 Test results include 1 ABHV-F022C,1KPHV-5836A 1ABHV-F067C 09/16/92 af 19.8505 Test resu!ts include 1 ABHV-F022C,1KPHV-5836A 1ABHV-F067C 10/14!92 al 3 2582 Test results include 1 ABHV-F022C,1KPHV-5836A 1 ABHV-F067C 03/12/94 af 2.5464 Test results include 1 ASHV-F022C,1KPHV-5836A 1 ABHV-F067C 04/23/94 al 2.6342 1 KPHV-5836A 12/29SO af
> 45 0000 Test resuRs include 1 ABHV-F022C,1 ABHV-F067C 1KPHV-5836A 12/30/90 al 23.3628 Test results include 1 ABHV-F022C,1 ABHV-F067C 1 KPHV-5836A 03/16/92 al 0.8091 1 KPHV-5836A 09/16/92 af 19.8505 Test results include 1 ABHV-F022C,1 ABHV-F067C 1KPHV-5836A 11/04/92 al 0.9032 1 KPHV-5836A 03/12194 af 2.5464 Test results include 1 ABHV-F022C,1 ABHV-F067C 1 KPHV-5836A 0408/94 at 0.0345 Page 2 of 3
' 4 Reactor Containment Building Integrated Leak Rate Test '
3 Hope Creek Generating Station, April 1994
[
Appendix G (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sefh)
COMMENTS l
Contahment Penetration P1D - Main Steam
[
1 ABHV-F022D 12/28/90 aflal 7.9967 Test results include 1 ABHV-F067D,1KPHV-5837A 1 ABHV-F0220 09/17/92
'af 32896 Test resu!ts include 1 ABHV-F067D,1KPHV-5837A i
1 ABHV-F022D 10/15/92 al 2 2297 Test results include 1 ABHV-F067D,1KPHV-5837A 1 ABHV-F022D 03/14/94 af/al 3.5593 Test results include 1 ABHV-F067D 1 ABHV-F0280 12/28/90 acal 2.8819 Test results include ; ABHV-3631D,1KPHV-5837B 1 ABHV-F028D 09/16/92 af 9 6274 Test results include 1 ABHV-3631D,1KPHV 5837B 1ABHV-F0280 10/18!92 at 3.6377 Test results include 1 ABHV-3631D.1KPHV-5837B 1ASHV-F028D 03/14/94 af/al 1.8753 Test results include 1 ABHV-3631D,1KPHV-58378 l
1 ABHV-F067D 12/28/90 afial 7.9967 Test results include 1 ABHV-F022D,1KPHV-5837A 1 ABHV-F067D 09/17/92 af 32896 Test results include 1 ABHV-F022D,1KPHV-5837A 1 ABHV-F067D 10/15/92 al 22297 Test resuPs include 1 ABHV-F022D,1KPHV-5837A 1 ABHV-F0670
- 03/14/94 af 3.5593 Test results include 1 ABHV-F0220 1 ABHV-F0670 04/05/94 al 1.2763 Test results include 1KPHV-5837A 1KPHV-5837A 12/28/90 af/al 7.9967 Test results include 1 ABHV-F022D,1 ABHV-F067D 1 KPHV-5837A 09/17/92 af 32896 Test results include 1 ABHV-F022D,1 ABHV-F0670 1KPHV-5837A 11/04/92 at 0.9000 1KPHV-5837A 03/13/94 af 37.3334 1 KPHV-5837A 04/05/94 al 12763 Test results include 1 ABHV-F067D t
Page 3 of 3
~.
.. ~..
- ...r er
..-.w.,c, w~,
rm
,...,. ~ #
-.,r m
Reactor Containment Building Integrated Leak Rate Test.
Hope Creek Generating Station, April 1994 Appendix H - Local Leakage Rate Test Data for Water Sealed Valves t
TEST LEAKAGE COMPONENT DATE TYPE (gpm).
COMMENTS Contahment Penetration P201 - HPCI Steam 1 FDHV-F071 12/31/90 af
.1.110 1FDHV-F071 01/01/91 at 0.790 1FDHV-F071 09/21a92 of 0.000 1FDHV-F071 10/17S2 al 0.006 1FDHV-F071 03/10/94 af/al 0.097 1 FDHV-F075 01/01/91 af/al 0.003 1FDHV-F075 09/23/92 af 0.000 1FDHV-F075 10/17!92 al 0000
~I 1FDHV-F075 03/10/94 af/al 0000 Contahment Penetraton P202 - HPCI 13JHV-F042 01/03/91 af/al 0.006 1BJHV-F042 09/19/92
- af 0 009 1 BJHV-F042 10/28/92 al 0.005 1BJHV-F042 03/10/94 af/af 0 004 i
Containment Peretration P203 - HPCI 1BJHV F012 01/03S1 afiel 0002 1 BJHV-F012 09/19S2 af/al 0.002 1BJHV F012 10/17S2 al 0.001 1 BJHV-F012 03/10/94 af 0 007 Conta% ment Penetration P207 - RCIC Turt>ine Exhaust 1FCHV-F059 01/12/91 af/al 0.005 1FCHV-F059 09/20/92 af 0 008 1FCHV-F059 10/02/92 al 0.000 1FCHV-F059 03/08/94 af/al 0.000 1FCV 6 01/12/91 af 0.007 1FCV-003 01/24/91 al 0.040 1FCV-003 09/20S 2 af 0.000 1 FCV-003 11/27S2 at 0.021 1FCV-003 03/08/94 af 0.015 1FCV-003 03/23/94 al 0.007 1FCHV-F062 01/12!91 aflal 0.002
.)
1FCHV-F062 09/20/92 af 0.000 1FCHV-F062 10/02/92 al 0000-Page 1 of 6
i Reactor Containment Building Integrated Leak Rate Test.
llope Creek Generating Station, April 1994 Appendix II (continued)
TEST LEAKAGE COMPONENT DATE TYPE (gpm)
COMMENTS 1
1FCHV-F062 03/08/94 aflat 0.000 Contahment Penetration P208 - RCIC 1 BDHV-F031 01/03/91 af!al 0.038 1 BDHV-F031 09/22/92 af 0.200 1BDHV-F031 10/07/92 al 0.078 1BDHV-F031 03/1064 af/at 0.002 Contahment Penetration P209 - RCIC 1BDSV-F019 01/04/91 af/al 0.000 1 BDSV-F019 09/22/92 af/al 0.000 1 BDSV-F019 03/10/94 af/al 0.001 Containment Penetraten P210 - RCIC 1FCHV-F060 01/05/91 af/al 0.002 1 FCHV-F060 09/20/92 af 0.003 i
1 FCHV-F060 10,02/92 al 0.000 1 FCHV-F060 03/10/94 af/al 0.000 e
1FCV-010 01/05/91 af 10.000 1 FCV-010 01/05/91 at 0.016 1FCV410 09/20/92 af/al 0.000 1FCV-010 03/10/94 af/af 0.000 1
Contahment Penetration P211 A - RHR 1 BCHV-F004D 12/17/90 af/al 0.020 1BCHV-F004D 09/13/92 af/at 0.023 I
1BCHV-F004D 03/23/94 af 0.024 1BCHV-F004D 04/01/94 at 0.016 Contahment Penetration P211B - RHR l
1 BCHV-F004B 12/17/90 af/al 0.022 ibCHV-F004B 10/24S2 af!al 0.007 1 BCHV-F004 B 03/23/94 af 0.000 1BCHV-F004B '
04/02/94 at 0.006 Containment Penetration P211C - RHR 1BCHV-F00/ A 01/09/91.
af/al 0.010 1 BCHV-F004A 09/23/92 af 0.000 1BCHV-F004 A 09/29/92 al 0.009 Page 2 of 6 -
l
.~
Reactor Containment Building Integrated Leak Rate Test.
Ilope Creek Generating Station, April 1994 Appendix 11 (continued)
TEST LEAKAGE COMPONENT DATE TYPE (gpm)
COMMENTS 1 BCHV-F004 A 03/13/94 afia!
0 006 Containment Penetraton P2110 - RHR 1 BCHV-F004C 01/09e91 af/al 0.027 1 BCHV-F004C 09!23/92 af 0 002 1 BCHV-FOO4C 09/29.92 al 0 010 1 BCHV-F004C 03/13.94 atral 0 027 Containrnent Penetraton P212A - RHR 1 BCHV-F007B 12/17GO affal D025 Test resu!ts include 1BCHV-F007D,1BCHV F0108,1BCHV-F0118,1BCHV-F0248,1BCV-260 1 BCHV-F0078 10/24!92 aflal 0.070 Test results include 1BCHV-FOO7D,1BCHV-F010B,1BCHV-F011B,1BCHV-F024B,1BCV-260 1BCHV-FOO78 03/24/94 af 0,141 Test resuis include 1BCHV-F007D 1BCHV-F0108,1BCHV-F011B,1BCHV-F024B, iBCV-260 1 BCHV-F007B 04/13/94 al 0.026 18CHV-F007D 12/17190 aflat 0 025 Test resutts include 1BCHV-FOO78,1BCHV-F0108,18CHV-F0118,1BCHV-F0248, iBCV-260 1 BCHV-F007D 10/24.92 af/al 0070 Test results include 1BCHV-FOO78,1BCHV-F0108,1BCHV-F011B,1BCHV-F0246,1BCV-260 1 BCHV-F007D 03/24!94 af 0.141 Test results include 1BCHV-F0078,1BCHV-F0108,1BCHV-F0118,1BCHV-F024B,1BCV-260 1 BCHV-F0070 04.03/94 al 0003 Test resu!ts include 1BCHV-F0078,1BCHV-F0108,1BCHir-F0118,1BCHV-F024B,1BCV-260 1BCHV-F010B 12/17/90 affal 0 025 Test results include 1BCHV-F0078,1BCHV-FOO70,1BCHV-F011B,1BCHV-F0248,1BCV-260 1 BCHV-F0108 10/24/92 aftat 0070 Test resutts include 1BCHV-F0078,1BCHV-F007D,1BCHV-F0118,1BCHV-F0248,18CV-260 1 BCHV-F010B 03/24/94 af 0141 Test resutts include 1BCHV-F0078,1 BCHV-F007D,1BCHV-F011B,1BCHV-F0248,1BCV-260 1 BCHV-F010B 0403/94 at 0003 Test results include 1BCHV-F007B,1BCHV-F007D,1BCHV-F0118,1BCHV-F0248,1BCV-260 1 BCHV-F011 B 12117!90 af/al 0025 Test results include 1BCHV-F007B,1BCHV-F0070,1 BCHV-F0108,1BCHV-F0248,1BCV-260 1 BCHV-F011 B 10/24/92 af/al 0070 Test results include 1BCHV-F007B,1BCHV-F007D,1BCHV-F0108,1BCHV-F0248,1BCV-260 1 BCHV-F011B 03/24/94 af 0141 Test results include 1BCHV-F007B,1BCHV-F007D,1BCHV-F0108,1BCHV-F0248,1BCV-260 1 BCHV-F011 B 0403/94 al 0003 Test results include 1BCHV-F0078,1BCHV-F0070,1BCHV-F0108,1BCHV-F0248,1BCV-260 1 BCHV-F024B 12/17/90 aflat 0 025 Test results include 1BCHV-FOO7B,1BCHV-F007D,1BCHV-F0108,1BCHV-F0118,1BCV-260 1 BCHV-F024 B 10/24/92 af 0070 Test resu!ts include 1BCHV-F0078,1BCHV-F007D 1BCHV-F0108,1BCHV-F011B,1BCV-260 1 BCHV-F024B 11/05/92 at 0006 1 BCHV-F024 B 03/24/94 af 0.141 Test results include 1BCHV-F007B,1BCHV-F007D,1BCHV-F0108,1BCHV-F011B,1BCV-260 1 BCHV-F0240 0403.94 al 0.003 Test results include 1BCHV-F0078,1BCHV-F007D.1BCHV-F0108,1BCHV-F011B,1BCV-260 1 BCV-260 12/17/90 aflal 0.025 Test results include 1BCHV-F0078,1BCHV-F007D,1BCHV-F0108,1BCHV-F011B,1BCHV-F024B 1 BCV-260 10/2492 afial 0.070 Test results include 1BCHV-F0078,1BCHV-F007D,1BCHV-F0108,1BCHV-F0118,1BCHV-F0248 1 BCV-260 03/24/94 af 0141 Test results include 1BCHV-FOO78,1BCHV-F007D,1BCHV-F0108,1BCHV-F011B,1BCHV-F024B 1 BCV-260 0403/94 at 0003 Test resutts include 1BCHV-F0078,1BCHV-F007D,1BCHV-F0108,1BCHV-F0118,1BCHV-F0248 Page 3 of 6 r
Reactor Containment Building Integrated Leak Rate Test, IIOpe Creek Generating Station, April 1994 Appendix 11 (continued)
TEST LEAKAGE COMPONENT
[9TE TYPE (gpm)
COMMENTS Containment Penetraton P212B - RHR 1 BCHV-FOO7A 01/09/91 af/al 0.117 Test resWts include 1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1 BCHV-F007A 09/23/92 af 0048 Test results include 1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A 1BCHV-F024A,1BCV-206 1 BCHV-FOO7A 10/01/92 at 0 037 Test results include 1BCHV-F007C,1BCHV-F010A.1BCHV-F011 A,1BCHV-F024A,1 BCV-206 1BCHV-F007A 03/19/94 afial 0017 Test results include 1BCHV-FOO7C,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1 BCHV-F007C 01!O9S1 a f/al 0.117 Test results include 1BCHV-F007A,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A,1 BCV-206 1 BCHV-F007C 09/23/92 af 0.048 Test results include 1BCHV-F007A,1BCHV-F010A,1BCHV-F011 A,1 BCHV-F024A,18CV-206 1BCHV-F007C 10/07/92 at 0051 1 BCMV-F007C 03/19/94 af/at 0.017 Test results include 1BCHV-F007A,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1BCHV-F010A 01/09 S1 a f/al 0117 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1 BCHV-F010A 09Q3/92 af 0.048 Test results include 1BCHV-FOO7A 1BCHV-F007C,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1 BCHV-F010A 10/01/92 at 0.037 Test resutts include 1BCHV-F007A,1BCHV-F007C,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1 BCHV-F010A 03/19S4 afial 0.017 Test resu'ts include 1BCHV-F007A,1BCHV-F007C,1BCHV-F011 A,1BCHV-F024A,1BCV-206 1BCHV ':011 A 01/09'91 af/al 0117 Test results include 1BCHV-FOO7A,1BCHV-F007C,1BCHV-F010A.1BCHV-F024A,1BCV-206 1BCHV-F011 A 0$23S2 af 0.048 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F024A,1BCV-206 1 BCHV-F011 A 10/01/92 ai 0037 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F024 A,1BCV-206 1 BCHV-F011 A 03/19S 4 af/al 0.017 Test resutts include 1BCHV-F007A,1BCHV-F007C 1BCHV-F010A,1BCHV-F024A,1BCV-206 1 BCHV-F024A 01/09/91 af'ai 0.117 Test results include 1BCHV-FOO7A,1 BCHV-F007C.1BCHV-F010A,1BCHV-F011 A,1BCV-206 1 BCHV-F024 A 09/23/92 af 0.048 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCV-206 1 BCHV-F024A 10/01/92 at 0.037 Test results include 1BCHV-F007A 1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCV-206 1 BCMV-F024 A 03/19S4 af!al 0017 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCV-206 1 BCV-206 01/09 S1 af!al 0.117 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A 1 BCV-206 09/23/92 af 0.048 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A 1 BCV-206 10/01/92 al 0.037 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,18CHV-F011 A,1BCHV-F024A 1 BCV-206 03/19/94 af!al 0017 Test results include 1BCHV-F007A,1BCHV-F007C,1BCHV-F010A,1BCHV-F011 A,1BCHV-F024A Containment Penetration P216A - Core Spray 1 BEHV-F001 B 01/14/91 a f'al 0.000 1BEHV-F001 B 09/18!92 af!al 0.000 1 BEHV-F001 B 03/24S 4 af 0.034 1 BEHV-F001 B 03/29S4 al 0000 Contahment Penetraton P216B - Core Spray 1 BEHV-F0010 01/14/91 af/al 0.280 1BEHV-F001 D 09/19/92 af/al 0 041 Page 4 of 6
Reactor Containment Building Integrated Leak Rate Test-IIOpe Creek Generating Station, April 1994 Appendix II (continued)
TEST LEAKAGE COMPONENT DATE TYPE (gpm)
COMMENTS n
1BEHV-F001 D 03/24'94 af 0 000 1 BEHV-F001 D 03/29/94 al 0.220 Containment Penetratum P216C - Core Spray 1BEHV-F001C 12/14/90 af/al 0,009 1BEHV-F001C 09/24!92 af!al 0 000 1 BEHV-F001C 03/11/94 af 0 003 1 BEHV-F001C 03/19/94 al 0 001 Containment Penetratum P216D Core Spray 1 BEHV-F001 A 12/14190 aflal 0 026 1 BEHV-F001 A 09/24/92 af/al 0041 1 BEHV-F001 A 03/11/94 af 0 021 1BEHV-F001 A 03/22/94 al 0.118 Containment Penetration P217A - Core Spray 1 BEHV-F0158 01/20/91 af/al 0.030 Test results include 1BEHV-F031B 1 BEHV-F0158 09/18/92 af 0.134 Test resuRs include 1BEHV-F031B 1 BEHV-F015B 09/19S 2 al 0005 Test results include 1BEHV-F0318 1BEHV-F0158 08/09/93 af
> 10 000 Tcst resuRs incsude 1BEHV-F031B 1BEHV-F015B 08/10/93 al 0.060 Test resuRs include 1BEHV-F031B 1BEHV-F015B 03/25/94 af/al 0000 Test resuRs include 1BEHV-F031B 1 BEHV-F031 B 01/20/91 aftal 0030 Test resuRs include 1BEHV-F0158 1 BEHV-F031 B o=J18/92 af 0.134 Test resuRs include 1BEHV-F0158 1 BEHV-F0318 09/23/92 at 0.019 1 BEHV-F031 B 08/09/93 af
> 10.000 Test resuRs include 1BEHV-F0158 1BEHV-F0318 08/10/93 al 0.060 Test resuRs include 1BEHV-F015B 1BEHV-F031B 03/25/94 aflal 0.000 Test results include iBEHV-F0158 P217A F1 03/29/94 at 0000 Containment Penetration P217B -Core Spray 1 BEHV-F015A 12/14/90 af/al 0.006 Test results include 1BEHV-F031 A 1 BEHV-F015A 09/24/92 af 0.000 Test resuRs include 1BEHV-F031 A 1 BEHV-F015A 10/04/92 al 0.003 Test resuRs include 1BEHV-F031 A 1 BEHV-F015A 03/11/94 af/a!
0.003 Test results include 1BEHV-F031 A i
1BEHV-F031 A 12/14/90 af/al 0.006 Test results include 1BEHV-F015A l
1 BEHV-F031 A 09/24/92 af 0.000 Test resuRs include 1BEHV-F015A Page 5 of 6
. -- +
s--
T
Reactor Containment Building Integrated Leak Rate Test-llope Creek Generating Station, April 1994 Appendix II (continued)
TEST LEAKAGE COMPONENT DATE TYPE ggpm)
COMMENTS 1 BEHV-F031 A 10/04/92 at 0003 Test resu!ts include 1BEHV-F015A 1 BEHV-F031 A 02/16/94 af
> 10.000 1 BEHV-F031 A 02/17/94 al 0000 1 BEHV-F031 A 03/11/94 at 0.003 Test results include 1BEHV-F015A P217B F1 10/09/92 al 0.000 P2178 F1 03/13/94 af 1.000 P217B F1 04.03/94 at 0000 Containrnent Penetration P222 - Torus Water Cleanup 1 E EHV-4652 01/10/91 af/al 0 012 1 EEHV-4652 09/26/92 af/al 0.000 1EEHV-4652 03/15/94 af/al 0.000 1 EEHV-4679 01/10/91 at'al 0.014 1 EEHV-4679 09/26/92 af/ai 0000 1EEHV 4679 03/15/94 at'al 0011 Containment Penetraton P223 - Torus Water Cleanup 1 EEHV-4680 01/10/91 af 0.490 1 EEHV-8680 01/10/91 al 0.220 1 EEHV-4680 09/26/92 af/al 0.200 1 EEHV-4690 03/15/94 af 0.360 1 EEHV-4680 04/06/94 al 0.000 1 E EHV-4681 12/20/90 a t'al 0.250 1EEHV 4681 09/26/92 af/al 0.168 1EEHV 4681 03/1gu94 af/al 0.048 Page 6 of 6
t
.).
Reactor Containment Building Integrated Leak Rate Test-IIope Creek Generating Station, April 1994 Appendix I - Extended Containment Boundary Leakage l
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS s
Test 1 "A* RHR Pump Suction and Discharge Ppbg 02/23/91 aflal 0.000 11/08/92 aval 0.000 02/24194 afial 0.150 Measured during ClLRT Test 2 *C"RHR Pump Sucton and Discharge Ppbg I
01/03/91 aflal 0.000 10/04192 af!al 30 000 01/18 S 4 aflal 0.000 Test 3 "A'RHR Common Pipbg 02/23.91 af'al 0.000 11/08/92 af/al 0.000 02/24/94 af/mi 0.100 Measured dunng CILRT Test 4 'B"RHR Pump Sucten and Discharge Piping 01/22/91 aftal 0000 11/24/92 af/a!
0 000 02/03/94 af!al 0.000 Test 5 *D"RHR Pump Sucton and Discharge Pipbg 01/15/91 aral 0.000 12/07/92 afr l 0.000 a
12/04/93 af/al 0.000 Test 6 *B"RHR Common Pipbg 01/15/91 af/al 0.000 12/07/92 aftal 0.000 02/03/94 af/al 0.050 Measured during CILRT Test 7 "A" Core Spray Pump Sucten and Discharge Piping 02/21/91 afial O.000 11/25!92 af/al 0.000 0W1/94 af/al 0.000 r
Test 8 "C" Core Spray Pump Sucten and Discharge Phing 02/21/91 aftal 0.000 11/25/92 af/al 0.000
{
03/01/94 af/al 0.000 Page -1 of 4
. i.
. ~,
a Reactor Containment Building Integrated Leak Rate Test-Ilope Creek Generating Station, April 1994 Appendix I (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS a
Test 9 "A" Core Spray Common Piphg 02/21/91 af/ai 0000 11/25/92 af/at 0.000 03/01/94 arat 0.000 Test to
'B" Core Spray Pump Suction and Discharge Piping 01/13/91 af/al 0000 11/16/92 aUal 0.000 02/28/94 afat 0050 Measured during CILRT Test 11
'D" Core Spray Pump Suction and Discharge Piping 01/13/91 af/al 0.000 11/16/92 aUal 0000 02/28/94 af/al 0.050 Measured during CILRT Test 12
- B" Core Spray Common Pping 01/13/91 af!al 0 000 11/16/92 aflal 0.000 02/28/94 sflai 0.000 Test 13 - RCIC Water Phing 02/22/91 aflal 0.000 11/25/92 af!al 0.000 11/23/94 af!al 0.050 Measured during CILRT Test 14 - RCIC Steam Piping 02/22/91 af/al 0.000 11/25/92 af/al 0.000 11/23/94 af/al 0.000 Test 15 - HPCI Water Piping l
03.05/91 af/at 0.000 l
11/10/92 af/al 0.000 02!O4/94 aFat 0.000 Test 16 - HPCI Steam Piping 03/05/91 aflal 0.000 i
11/10/92 af/al 0.000
(
0244/94 af/al 0.000 Page 2 of 4
4 Reactor Containment Building Integrated Leak Rate Test ilope Creek Generating Station, April 1994 Appendix I (continued)
TEST LEAKAGE COMPONENT DATE TYPE (sccm)
COMMENTS Test 17 - CRD Piphg South 12/2630 af/al 0000 09/12/92 aflal 1.000 03mS4 aftal 7570 000 Test results include CRD Piping South. Measured dunng CILRT Test 18 -CRD Pipbg North 12/26/90 atal 0.000 09/12/92 af 2.000 09/12/92 al 0000 03VSS4 af/at 7570 000 Test results include CRD Piping North. Measured during CILRT Test 19 "A" Hydrogen Recomb'ier Phrig e
02.06/91 af 1456.000 02/06.91 at 32.000 09/17/92 af/al 203.000 03/09.94 aflal 7.200 Test 20
'B" Hydrogen Recombiner Pprig 02M91 af 740.000 02/06/91 al 50.000 09/15192 af/al 350.000 03/09/94 af 911.000 03/22/94 at 36.000 Test 21 - PASS Liquid Phing 03/14/91 af!al 0.000 10/06/92 af/a!
0 000 Test 22 - PASS Gas Pping 12/20/90 at'ai 974.000 10/08/92 af/al 786.500 03/17/94 af 1220.000 03/17/94 al 923 000 Test 23 "A" Hydrogen 4xygen Analyzer Piping 01/16/91 af 675.000 01/16/91 al 31.000 l
10/06/92 af/al 113.000 03/10/94 af/at 712.000 Page 3 of 4 l
o Reactor Containment Building Integrated Leak Rate Test,
- llope Creek Generating Station, April 1994 Appendix 1 (continued)
TEST LEAKAGE COMPONENT DATE TYPE (secm)
COMMENTS Test 24
- B" Hydrogen-Oxygen Analyzer Piprig 01/19/91 af/al 257.000 10/06/92 af/al 72.500 03/10/94 aflat 65.600 Page 4 of 4
-.