Monthly Operating Rept for Sept 1994 for Calvert Cliffs Nuclear Power Plant
ML20076F883
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/30/1994
From: Cruse C, Piazza F
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9410180227
Download: ML20076F883 (12)


Text

- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

Curates 11. Cnyst Baltimore Gas and Electric Company Plant GeneralManager Calvert Citifs Nuclear Power Plant 150 Calvert CIWs Parkway 6

Calvert Clifs Nuclear Power Plant uusby, Maryland 20657 410 586-2200 Ext. 4101 Local 410 260-4101 Baltimore October 14,1994

(:

U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk l

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 September 1994 Orgia_ ling Data Repons The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

Very truly yours, o

/

CHC/FP/bjd Attachments cc:

D. A. Brune, Esquire J. E. Silberg, Esquire L. B Marsh, NRC D. G. Mcdonald, Jr., NRC I

T. T. Manin, NRC P. R. Wilson, NRC R. A. Ilartfield, NRC R. I. McLean, DNR l

J. H. Walter, PSC l

P. Lewis, INPO

)

K. Larson, ANI m nac l

94101so227 94o93o

/

t j DR ADOCK 05000317 PDR L_

m

\\

l UNIT.1 OPERATING DATA REPORT Docket No. 50-317 October 14, 2394 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 9

1.

UNIT NAME Calvert Cliffs Unit 1 2.

REPORTING PERIOD SEPTEMBER 1994 3.

LICENSED THERMAL POWER (MWT) 2700 4.

NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET MWe) 845

6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.

CHANGE IN CAPACITY RATINGS NONE 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 720 6,551 170,052
12. NUMBER OF HOURS. REACTOR WAS CRITICAL 720.0 3,702.7 120,671.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 720.0 3,449.1 118,027.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,935,671 8,912,249 299,227,068
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)

_634,729 2,919,774 99,393,320 r

18. NET ELECTRICAL ENERGY GENERATED (MWH) 608,832 2,791,447 94,595,729
19. UNIT SERVICE FACTOR 100.0 52.6 69.4
20. UNIT-AVAILABILITY FACTOR 100.0 52.6 69.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3 51.2 67.4
22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 50.4 65.8
23. UNIT FORCED OUTAGE RATE 0.0 17.2 9.0
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE.AND DURATION):

N/A

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

1 R

N/A

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-317 UNIT NAME Calvert Cliffs-U1 DATE October 14.1994 COMPLETED BY.

l Frank Piazza TELEPHONE (410) 260-3821-REPORTMONTII September 1994 MET 110D OF SilUTTING LICENSEE CAUSE & CORRECITVE DURAllON DOWN EVENT SYSTEM COMPONENT ACllON TO (IlOURS)

REASON 2 REACIVR3 REPORT #

CODE 4 CODES PREVENTRECURRENCE NO.

DATE TYPEI There were no significant pmer reductions for this month.

1 F: Forced 2 Reason:

3 Method:

4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C-Refueling 3 - Automatic Scram.

5 IEEE Standard 803A-1983 D -Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5-Reduced Imad F-Administrative 9 - Other O - Operational Error H - Other

AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************.

Docket No. 50-317 i

Calvert Cliffs Unit No. 1 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821' l

SEPTEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day

.(MWe-Net) 1 844 17 842 2

846 18 841 3

846 19 844 j

4 848 20 843 5

849 21 842 6

848 22 845

~i 7

847 23 848 l

8 847 24 847 i

i 9

846 25 844 10 146 26 843

(

11 847 27 845 12 847 28 843 13 847 29 848 t

14 847 30 850 i

15 845

'l.

16 843

)

f i

I

DOCKETNO. 50-317 CALVERT CLIFFS - UNIT 1 October 14,1994

SUMMARY

OF OPERATING EXPERIENCE September 1994 The unit operated the entire month at 100% power.

October 5,1994 NFM 94-288 Page 2 of 4, REFUEL,ING INFORMATION REOUEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.

2.

Scheduled date for next refueling shutdown: March,1996.

1 3.

Scheduled date for restart following refueling: May,1996.

I 4.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

None identified at this time.

l 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

l 1

1 N/A.

I 6.

Important licensing considerations associated with the refueling.

Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.a 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1442 (Note 2)*

Spent fuel pools are common to Units I and 2.

8.

(a) The present licensed spent fuel pool storagc capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710(Note 1)

(b) 0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1:

4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2:

144 Spent Fuel Assemblies in the ISFSI.a Entry has changed since last reported.

a

co*****************************************************w********************

UNIT 2 OPERATING DATA REPORT i

co**************************************************************************

Docket No. 50-318 October 14, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 1.

UNIT NAME Calvert Cliffs Unit 2 2.

REPORTING PERIOD SEPTEMBER 1994

3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 1

8.

CHANGE IN CAPACITY RATINGS NONE' 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 720 6,551 153,407 7
12. NUMBER OF HOURS REACTOR WAS CRITICAL 619.2 5,992.1 112,028.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 598.6 5,936.1 110,459.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,406,157 15,320,324 282,185,867
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 456,151 5,079,447 93,235,316
18. NET ELECTRICAL ENERGY GENERATED (MWH) 434,510 4,868,106 89,111,240
19. UNIT SERVICE FACTOR 83.1 90.6 72.0
20. UNIT AVAILABILITY FACTOR 83.1 90.6 72.0 21.-UNIT CAPACITY FACTOR (USING MDC NET) 71.8 89.1 70.4
22. UNIT CAPACITY FACTOR (USING DER NET) 71.4 87.9 68.7
23. UNIT FORCED OUTAGE RATE.

16.9 7.3 5.8

24.. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

February 18,1995

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A-t y

UNITSIIUTDOWNS AND POWER REDLCTIONS DOCKET NO.

50-318 UNIT NAME Cahrrt Cliffs-U2 DATE October 14.1994 COMPLETED BY Frank Piarla TELEPHONE (410) 260-3821 REPORT MONTII S_etitember 1994 METilOD OF SilUTTING 1.ICENSEE CAUSE & CORRECITVE DURATION DOWN EVENT SYST11M COMPONENT ACTION TU (IIOURS)

REASONI REACIOR3 REPORT #

CODE 4 CODES PREVENT RECURRENCE NO.

DAlli TYPEI S

94-10 940906 S

0 H

5 N/A N/A N/A Power was increased from 52% to 100% in 10%

increments per hour as requested by the dispatcher.

The power was kept low since 8/23/94 at the request of the dispatcher due to low power demand on the grid. Power was stable at 100% at 1540 on 9W)4.

94-11 940923 F

17.1 A

1 N/A SG COND Commenced reducing power on 9/23/94 at 2200 to repair an air leak in the Main Steam drain collector box. The unit was removed from the grid at 0310 on 9/24!94. After completing the repairs the unit was paralleled to the grid at 2015.

94-12 940924 F

1R3 A

3 Not Available TA FCV Unit tripped from 16% reactor power on low steam generator pressure at 2016 on 9/24/94. The cause of the trip was a k>ose wire on #1 governor vahr, which is part of a feedback circuit that caused the valve to open fully. The wire was loose due to vibration. The wire was tightened and all the other wires on the vahr were checked for security. The unit was returned to power and paralleled to the grid at 0435 on 9/29S4.

1 F: Forced 2 Reason:

3 Method:

4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram.

5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other m

AVERAGE DAILY UNIT POWER LEVEL

'o*******p***************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 SEPTEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 411 17 844 2

416 18 843 l

3 419 19 845 4

421 20 846 l

5 417 21 845

)

6 679 22 847 l

7 846 23 841 l

8 846 24 10 9

828 25 0

10 742 26 0

1 11 738 27 0

12 738 28 0

13 802 29 496 14 844 30 850 15 844 16 845

l DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 October 14,1994

SUMMARY

OF OPERATING EXPERIENCE September 1994 At the request of the dispatcher the unit began the month in a reduced power condition due to a very low demand on the grid. The power was 53% reactor power. Commenced raising power at 0500 on September 6,1994 and established 100% reactor power at 1540.

Power was again reduced slightly on September 9,1994 at 1525 to repair the number 22 heater drain tank normal level control valve. The power was again returned to 100% at 1350 on September 13, 1994.

On September 23 at 2200, commenced reducing power to repair an air leak on 21 condenser of the Main Steam drain collector box. The unit was removed from the grid at 0310 on September 24,1994 to affect these repairs; however, the unit remained at approximately 6% reactor power during the repairs. The unit was again paralleled to the grid on September 24,1994 at 2015.

On September 24,1994 at 2016, the unit automatically tripped from approximately 16% reactor power due to low steam generator pressure caused by the governor valves opening fully. The cause of the governor valve opening was a loose wire in the control circuitry of the valve. The wire was tightened and the unit was returned to power and paralleled to the grid at 0435 on September 29, 1994.

The unit ended the month at 100';c reactor power.

October 5,1994 NFM 94-288 Page 3 of 4 REFUEL,ING INFORM ATION REOUEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant. Unit No. 2 I

2.

Scheduled date for next refueling shutdown: February 18, 1995

  • 3.

Scheduled date for restart following refueling: May 22,- 1995.

4.

Will refueling or resumption of operation thereafter require a Technical Specification change or

)

other license amendment?

Yes.*

Revision of the Design Features Section to adopt Improved S' tandard Technical a.

Specifications format which allows insertion of four lead fuel assemblics.*

I b.

License amendment to support installation of a Variable LTOP system.*

e.

License amendment to extend allowed out of service times for control room IIVAC

- and emergency diesel generator to support Station Blackout modifications.*

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

1 l'

a.

Submitted 12/08/93*

l b.

Submitted 05/27/94*

l c.

Submitted 09/23/94*

6.

Important licensing considerations associated with the refueling.

1 An exemption from 10 CFR 50.46,10 CFR 50.44, and Appendix K to 10 CFR 50 is required to load four lead fuel assemblies. The exemption is scheduled to be submitted in October, 1994,*

An exemption from General Design Criteria 2 of Appendix A to 10 CFR Part 50 is required to allow the removal of the missile door to Emergency Diesel Generator No. 21. The exemption is needed to upgrade the capacity of the generator. The exemption was submitted 08/04/94.*

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217.

(b).1442 (Note 2)*

Spent fuel pools are common to Units 1 and 2.

1 8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase m licensed storage capacity that has been requested or is planned in number of fuel assemblies.

(a) 4710 (Note 1)

(b) 0 I

'

  • October 5,1994 NFM 94-288 I

Page 4 of 4 1

9..

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 l

NOTE 1:

4710 total licensed site storage capacity.

l (1830 pool + 2880 ISFSI)

NOTE 2:

144 Spent Fuel Assemblies in the ISFSI.*

l l

Entry has changed since last reported.

l l