ML20078P732
| ML20078P732 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/07/1983 |
| From: | Horin W DEBEVOISE & LIBERMAN, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Stucky S NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| NUDOCS 8311080211 | |
| Download: ML20078P732 (2) | |
Text
- - -.._.
l 1
=
i 4
U TED 64w orricCS or g
j DEBEVolS E & LIBERM AN 2e eRo*o**v 1200 SCVENTCCNTH S T R C C T, N. W.
N EW YOR K, N CW YORM 100 0+
42126 2 6900 WA S min G TO N, 0. C. 2 O O 36 (2028857*9800 f0C ET HG A SE bi
- i C"* " " "' '
BRANCH
'8o2> +s7-so o o November 7, 1983 2
l 1
Mr. Scott W. Stucky Docketing and Service Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Texas Utilities Generating Company, et al.
(Comanche Peak Steam Electric Station, Units 1 and 2); Docket Nos. 50-445 and 50-446
Dear Mr. Stucky:
Enclosed is the original signature page of the affidavit of Mr. John C. Finneran, Jr., Regarding Analysis of Stiff Pipe Clamps Addressed in Board Notification 82-105A, which was sent to you November 4, 1983.
We had indicated therein that the original would be transmitted under separate cover.
Sincerely, 1
l 9
i s
Wi liam A.
Hori Counsel for Applicants cc:
Service List hok 0
0 0
503 9
l to assure maximum clamp stiffness.
(See BN-82-105A at IV-5).
The SIT Report has thoroughly assessed the use of conventional U-bolt clamping systems, and its analysis is fully consistent I
with BN 82-105A.
l 1
W hn C.
Finneran, Jr.
/
County of Somervell
)
Subscribed and sworn to before me State of Texas
)
this 4th day of November, 1983 4
g.,
i
+\\.
en Notar Public
.f i
)
i 1
h r
.-a.-e.
,-~=-a-
, -,,, - - - - -