Forwards Application for Amend to License NPF-3,changing TS Per Generic Ltr 86-10, Implementation of Fire Protection Requirements & Generic Ltr 88-12, Removal of Fire Protection Requirements from Tech Specs
ML20079M694
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/01/1991
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20079M696 List:
References
1789, GL-86-10, GL-88-12, TAC-M82089, NUDOCS 9111080338
Download: ML20079M694 (2)


Text

.

l cswreason ENERGY DonoW C. Shonon 300 Madison Avenue Vice Pcesident Nuclear Toledo, OH 43652AIO1 Devis Besse (419)243-2300 Docket Number 50-346 License Number NPF-3 Serial Number 1789 November 1, 1991 United States Nuclear Regulatory-Commission Document Control Desk 1 Vashington, D. C. 20555

Subject:

License Amendment Request to Remove the' Fire Protection Requirements per Generic-Letter 86-10-and Generic Letter 88-12 Gentlemen Enclosed is an application'for an Amendment to theLDavis-Besse Nuclear Power Station (DBNPS), Unit Number'1, Operating License Number NPF-3, and Appendix A,-Technical Specifications-(TS).- In accordance with-Generic Letter 86-10, " Implementation of Fire Protection Requirements" dated April 24, 1986, and_ Generic Letter _.88-12, "Remeval of; Fire-Protection Requirements from Technical-Specifications" dated August 2, 1988, this application requests removal ~of the Fire Protaction Program.

requirements.from the DBNPS1TS,-' addition of Fire:Prv(ection Program administrative controls to the DBNPS TS, and modification of the present Operating License Condition-2.C.(4).

The Nuclear Regulatory _ Commission (NRC) review and acceptance of the Davis-Besse Fire Protection Program:3s documented in the License Amendment Number 18 Safety Evaluation Report _(SER)1 dated July: 26, 1979 and the 10CFR50, Appendix;R SER dated May 30, 1991'.

As recommended.byi the Generic Let ters, the Davis-Besse Fire tsaards: Analyuis Report

-(FHAR) has;been incorporated lby reference-auto; Updated; Safety Analysis Report (USAR):Section19.5.1, " Fire-Protection _ System" and.the Fire Protection Program = requirements _have been incorporatedLinto FHAR-~

Section:8.0, " Operating Specifications". The incorporation oflthe FHAR-into the USAR by: reference _vas submitted-to the NRC:per~10,CFR:50.71(e).

as USAR-Revision 15 under Toledo Edison-letter Serial ~ Number 1973.;A-controlled copy of the FHAR,.whichli~cludesithe new Section 8.0? vas n

-forwarded to the NRC as_a part-ofithis USAR Revision 115 submittal. ;The:

Fire Protection: Program is described in_DBNPS procedure NG-EN-00302,-

. Fire _ Protection Program, and includes th'e systems,1the; associated' administrative controls-and implementing procedures, :and _ the FHlut.

9111090338;911101-

.(.

PDR-ADOCK 05000346

~

[j P-PDR

Operating Companies:

h

. Cleveland Electric muminating i Toledo Edison 1 L.

Docket Number 50-346 License Number NPF-3 Serial Number 1789 Page 2 of this application contains the Safety Assessment and Significant Hazards Consideration, the marked-up TS pages, and proposed wording for Operating License Condition 2.C.(4).

describes alternative methods of compliance with certain License Condition 2.C.(4) requirements as listed in Table 1 of the License Amendment Number 18 SER. contains an informational copy of the revised portion of USAR Section 9.5.1 that reflects incorporation of the FHAR by reference and Attachment 4 contains an informational copy of FHAR Section 8.0, Revision 12.

The Safety Assessment and Significant Hazards Consideration (Attachment 1) of this application discusses Toledo Edison's plans to complete the installation of additional area-type detection in the fuel

(

handling area (Rooin 300) by the end of the Seventh Refueling Outage.

(

This work is currently underway and following its completion Toledo Edison vill submit a work completion confirmation letter to the NRC.

This License Amendment Request supersedes Toledo Edison's March 22, 1990 License Amendment Request (Toledo Edison letter Serial Number 1788).

Toledo Edison requests that this application be approved and issued by the NRC by April 30, 1992, for implementation within 60 days thereafter.

If you have any questions, please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing, at (419)249-2366.

Very truly yours, n

?& r

}

KBR/ach Enclosure A. B. Davis, Regional Administrator, NRC Region III cc:

J. B. Hopkins, NRC/NRR DB-1 Senior Project Manager V. Levis, DB-1 NRC Senior Resident Inspector J. R. Villiams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

Utility Radiological Safety Board