ML20085A847

From kanterella
Revision as of 03:52, 14 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 790604 Memo Re B&W NSSS Responsiveness.Meeting W/N Embrey Recommended to Map Strategy for Demonstrating Manageability of Transient Control
ML20085A847
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/05/1979
From: Roy D
BABCOCK & WILCOX CO.
To: Fahland F, Womack E
BABCOCK & WILCOX CO.
References
TASK-*, TASK-GB GPU-0531, GPU-531, NUDOCS 8307070300
Download: ML20085A847 (2)


Text

.-

w.... -

\\

p..%.. -

.)

l'..

).,.

\\'

THE BASCOCK & WILCox CC4?ANY POWER GENU.ATION GROUP to i

E. A. Womack/F.

R'. Fahland ses 442.s (2375)

Froe D. H. Roy, Manager, NPG0 Engineering File No.

or Ref.

Cust.

Date B&W System Responsiveness

~

~

j n.

'i The attached memo is self-explanatory and deals with an issue w i

discussed several times recently.

l system, i

that its control is manageable and that, with the integ Please meet with Helson Embrey or his designee as soon as possible a strategy which takes action to put cur best foot forward on this issue.

e

.1

{

a J

.s

.T:.-

Ag DHR:nw

.,4 Attachment

.k 3

r - w/att.

f*,, h,"n CC' i5

- j; The meeting time has been set for 1:00 p.m. Wednesday,

.' n i-Pt. EASE NOTE:

June 6,1979, in N. 5. E: trey's office.

~

1 I

Nancy West WO l

Beft. Exh. For IDS N

. u-u.-.m av 2

ru Charles Shapito CSR ( lfo[gx Doyle Reporting Inc.

Q 8307070300 790605 hDRADOCK 05000289

=. -

a

'.s.

~..

318[l T 6;7)

E5 - ~7 8 '91 9

> '~. r' '

-.e.

c -

    • 'W.

n

.~--

m_ _

~

_..._. w. ;.

p*u-T*-

5 j

h..

J-7 D-g THE BABCCCX & h'll.COX.C0h ANY d,. ~'

POWER GENERATION GROUP To l3. 5. Emb. ray. Manager NFC3

.'j*, 3 r g* f

[

Marketing & Business 71annieg.

t

--from J. E. MacML11an. Vice President

  • * * ** 3"#

Koclear ?over Generati'on Division f

File No.

or Ref.

4 Cate Subj.

June &.

1979 3&W System Responsiveness

-a lm.s leveled a gainst the B&W NS5 is its A resurrent criticism that la transients - the *' hack 143 bronco 'syndrone."

We sensitivity to need to prepare a convincing presentation for use with the NRC, ACES, industry groups, Congressional cosuittees and perhaps the

~

press on the basic chstacteristics of the B&W system which

{

its control is manageablo and that with the I

demonstrate that the operator has no more dif ficulty integrated con trol system, I

than vith var competitors' systems.

t D. E. Eoy has initiated sose tech =ical work covard this objective.

scops to include, where possible, We need to broaden that tastimonies from operators who' ha:re run both 3&W and cor.petitor

,j systems and coupecitor product, data.

that 3&W our presentation should forthrightly address the fact has less water inventory la its ateam generators. thus making it inheren tly more responsive. Us should identify the advantages of this arrangement and indicate constructive seasures which we the design of our equipmenc to acconnodate these

~j have taken in inherent characceristics.

the Huelhein-It say be helpful in this assesszent to evaluate Iserlich design and later versions to be offered in Germany.

D. W. Berger can provide support in this area.

t f

JHX/mic k\\

f cc:,

D. W. Berger J. C. Deddens R.

E.

Kosiba 4

~

'm P,

e

._ _.