ML20087N325

From kanterella
Revision as of 13:57, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Interim Findings of Adequacy of Radiological Emergency Response Planning by State & Local Govts at Callaway Nuclear Power Plant, & State of Mo . State of Mo Will Complete Corrective Actions by 840519
ML20087N325
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/27/1984
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20087N326 List:
References
NUDOCS 8404030341
Download: ML20087N325 (2)


Text

i ;

Federal Emergency Management Agency

=

Washington, D.C. 20472 MAR 27 384 MEMORANDUM FOR: Edward L. Jordan Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement U

ucle Regu t ry Commission FROM:

e mm Assistant ssocia e Director Office of Natural and Technological Hazards Programs

SUBJECT:

Interim Finding on Callaway Nuclear Power Plant, Fulton, Missouri At the request of the Nuclear Regulatory Commission (NRC), the Federal Emergency Management Agency (FEMA) tranemits the attached Interim Finding on the Callaway Nuclear Power Plant dated December 14, 1983, and a March 8, 1984, letter from the

. Emergency Management Agency, State of Missouri. The letter from the State of Missouri commits the State to the completion of corrective actions by May 19, 1984, for the deficiencies identified in the Interim Finding. This Interim Finding is based on the FEMA Region VII review of the offsite radiological emergency response plans for the State of Missouri and the Counties of Callaway, Gasconade, Osage, and Montgomery.

FEMA's assessment of the overall preparedness of the State and local governments will be made after the results of the March 21, 1984, exercise at callaway are known.

Attachment As Stated 8404030341 840327 i

PDR ADOCK 05000483 F

PDR

//[ $ S'

,\\

i l a

Federal Emergency Management Agency 4

'e L

Region VII 911 Walnut Street Kansas City, Missouri 64105 e

~

MEMORANDUM FOR: Samuel V A peg 15 J sociate' Director

(__ E U ) -} 7 tate T Local-Pr r

& Support FROM:

Pat I' rehe egional Director, FEMA - Region VII r

SUBJECT:

Submiss on of Interim Findings for Wolf Creek Generating Stati and Callaway Nuclear Power Plant.

In accordance with FEMA Guidance Memorandum of August 5, 1983, enclosed are Interim Findings for Wolf Creek Generating Station and Callaway Nuclear Power Plant. These findings are based on plan reviews only and reflect the comments of the Regional Assistance Committee. Review was based on the planning stan-ards published in NUREG-0654, FEMA-REP-1 (REV. 1).

Enclosed with each Interim Findings is a copy of those State and Local Plans which were reviewed. For Callaway Nuclear Power Plant, there are ': Ave plans submitted. Missouri State Plan and County Plans for Callaway/Fulton, Mont-gomery, Osage, and Gasconade Counties.

For Wolf Creek Generating Station there are two plans; the Kansas State response plan and the Coffee County response plan.

Any questions on this review should be directed to Mr. Frank Begley, Acting Division Chief, Natural & Technological Hazards Division, (FTS) 758-2161.