ML20093K471
| ML20093K471 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/21/1984 |
| From: | Quamme D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CSC-7803, NUDOCS 8407310094 | |
| Download: ML20093K471 (4) | |
Text
"f bk n
i Consumers Dean L Quemme Power s~ u -,,
Company PRINCIPALSTAN ue.no proi.ct PO Box 1963. Midl.nd MI 4864o. (517) 631-865o June 21, 1984
[6. /nA
'44JORPV d
O c,3A DRS iT DRSS
{'A0 ML TiA OL IIC 9I DRMA FILE J-- -
Mr John J Harrison, Chief Midland Project Section US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER PROJECT MIDLAND DOCKET NOS 50-329, 50-330 CONSTRUCTION COMPLETION PROGRAM IMPLEMENTATION ADDITIONAL MODULE RELEASES File: 0655.3 Serial: CSC-7803 i
The purpose of this letter is to request NRC concurrence for release of the balance of the modules in the plant for Construction Completion Program (CCP)
Phase 1 Status Assessment and Quality Verification Program (QVP) activities.
This request is based on the following:
A) Consumers Power Company has completed two Phase 2 Management Reviews and no major programmatic issues have arisen. We feel that if any problems arise in the future, they will be minor and manageable.
B) Due to the fact that most systems have components in many modules it is evident that it will be difficult for us to meet our long term schedule i
goals unless we have a complete release of all modules for Phase 1.
We require this flexibility in order to allocate resources efficiently to meet the milestone dates that lead to fuel load.
C) Consumers Power Company is required to obtain an NRC concurrence for all Phase 2 CCP work releases. This provides a high degree of control for the review of Phase 1 results. The total release of all modules for Phase 1 will allow us to better manage our resources pursuant to the programmatic activities of Phase 1 and our limited MPQAD and Engineering manpower resources.
OkO7310094840621 PDR ADOCK 05000329 A
PDR N2O OC0584-017-CN04 Sto l G.
]
h
IY:
. Pag] 2 CSC-7803-D) -In your April 3, 1984 letter of Phase 1 release of six additional modules, concern was expressed in the areas of team training and document control.
- Team training has progressed extremely well.and the CIO group has no open concerns identified. Document control. issues continue to receive a high
-level of management attention with corrective measurements being implemented and major progress being achieved. Further-activities to streamline and make the operation more effective and efficient are at.various stages of implementation in accordance with.a master resolution plan.
A list of the remaining modules for Phase 1 is.provided in Attachment 1.
A prompt review and reply would be very much a preciated.
Q4
.W DLQ/ BHP /TAS/klp
.CC: Regional Administrator, Region III DSHood, NRR Project Manager, Washington Midland Project Manager, Region III Midland Reaident Inspector, Midland t-OC0584-017-CN04
., - _ ~
b(?l, if Attachusnt-1 Page 1 of.2 Additional Modules for Phase 1 Release 280 El. 659' Unit II Electrical Penetration 210 E1.:614' Control Tower 250 El'.:674'-6" Control Tower 170 El. 659' & 674'-6" Auxiliary Building
- 37b included) 140
'Ft. 614' Auxiliary Building 230 El. 646' Control Tower 130 599' Auxiliary Building 101 Auxiliary Building Pipeway and Valve Gallery-180 Auxiliary Building Roof 110 El. 568' Auxiliary Building 260 El. 685' Control Tower and Roof-310 RB II Fuel Pool 103 West Wing Wall 290 Unit 1 El. 685' W. Penetration 220 El. 634' Labs Control Tower 860 Tank Farm 420 El. 634' Turbine II 430 El. 659' Turbine II 440 El. 695' and 715 Turbine II 190 Radwaste Building 900 Miscellaneous Structures - Yard Area 850 Health Physics Calibration Facility 880 River Intake Structure 810 Circulating Water Building 890 Pond Blowdown Structure 830 Cuard House 870 Oily Waste Building 610 El. 614' Turbine I OC0584-017-CN04
IIJ
-o Attachm:nt l' Page 2 of 2-J r.
620 El. 634' Turbine 1 630-El. 659' Turbine I' 640-E1. 695' Turbine I 540 RB I Outside D-Ring 530 RB I S. D-Ring 520 RB I N. D-Ring 510 RB I Fuel Pool 700 Evaporator Building-710
- Steam Tunnel 720 Condensate Return Pumphouse 4
r OC0584-017-CN04 w
w w
e
'me-er g
--w-,
e-v.
+-
9
---,9 gy-yy-w-cp g-ww e-g e
ww-e