Proposed Tech Specs,Proposing Delay for One Cycle Volumetric & Surface Exams of RCP Motor Flywhells Required by RG 1.14 & Regulatory Position C.4.b
ML20094F063
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/03/1995
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20094F059 List:
References
RTR-REGGD-01.014, RTR-REGGD-1.014 NUDOCS 9511080144
Download: ML20094F063 (1)


Text

. _..

4 Procedures, Programs and Manuals 5.6 4

l 5.6 Procedures, Programs and Manuals 5.6.2.6 Post Accident Sampling (continued) c.

Provisions for maintenance of sampling and analysis equipment.

5.6.2.7 Containment Tendon Surveillance Program This program provides controls for monitoring any tendon degradation.in concrete containments, including effectiveness of its corrosion protection medium, to ensure containment structural integrity. The program shall include baseline measurements prior to initial operations. The Containment Tendon Surveillance Program, inspection frequencies, and acceptance criteria shall be in accordance with Regulatory Guide 1.35, Revision 3,1990.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Containment Tendon Surveillance Program inspection frequencies.

5.6.2.8 Inservice Inspection Program This program provides controls for inservice inspection of ASME Code Class 1, 2, and 3 components, including applicable supports.

The program shall include the following:

a.

Provisions that inservice inspection of ASME Code Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a; b.

The provisions of SR 3.0.2 are applicable to the frequencies for performing inservice inspection activities; c.

Inspection of each reactor coolant pump flywheel per the recommendation of Regulation Position c.4.b of Regulatory Guide 1.14, Revision 1, August 1975, except, the volumetric examinations and complete surface examination of the flywheels for the Second ISI Interval may be delayed one cycle to coincide with the Spring 1998 refuelis wtaga; and d.

Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any TS.

(continued)

Crystal River Unit 3 5.0-11 Amendment No.

9511000144 951103 PDR ADOCK 05000301 P

PDR W