Responds to Violations Noted in Insp Repts 50-266/85-14 & 50-301/85-14.Util Proposed & NRC Accepted Corrective Actions Completed Per 850725 & 0815 self-imposed Completion Dates
ML20137M591
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/27/1985
From: Cassidy T
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8509130279
Download: ML20137M591 (1)


Text

\\

b)b 8

insconsin Electnc macomr 231 W. MICHIGAN.P.O BOX 2046. MILWAUKEE W153201 (414)277-2345 August 27, 1985 v

Mr. J. G. Keppler, Regional Administrator Office of Inspection and Enforcement Region III U.S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

SUBJECT:

D0CKET NOS. 50-266 AND 50-301 REPLY TO IE INSPECTION REPORT NOS. 50-266/85-14 & 50-301/85-14 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Thir letter is in response to the subject inspection report issued by Mr. G. L. Pirtle for the special safeguards inspection conducted on July 12 - 17,1985.

With reference to Item 3.a of the inspection report, Wisconsin Electric has completed our proposed, and NRC accepted, corrective actions in accordance with the July 25, 1985 and August 15, 1985 self imposed dates for completion.