ML20137M591
| ML20137M591 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/27/1985 |
| From: | Cassidy T WISCONSIN ELECTRIC POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8509130279 | |
| Download: ML20137M591 (1) | |
Text
\\
b)b 8
insconsin Electnc macomr 231 W. MICHIGAN.P.O BOX 2046. MILWAUKEE W153201 (414)277-2345 August 27, 1985 v
Mr. J. G. Keppler, Regional Administrator Office of Inspection and Enforcement Region III U.S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
SUBJECT:
D0CKET NOS. 50-266 AND 50-301 REPLY TO IE INSPECTION REPORT NOS. 50-266/85-14 & 50-301/85-14 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Thir letter is in response to the subject inspection report issued by Mr. G. L. Pirtle for the special safeguards inspection conducted on July 12 - 17,1985.
With reference to Item 3.a of the inspection report, Wisconsin Electric has completed our proposed, and NRC accepted, corrective actions in accordance with the July 25, 1985 and August 15, 1985 self imposed dates for completion.
Very truly yours,
}'
~m Thomas Cassidy Executive Vice President 0N 4
f l
d i
8509130279 850027 PDR ADOCK O 2
i G
L
- E"!" *