ML20148G972
| ML20148G972 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 03/21/1988 |
| From: | Robert Williams CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Calvo J NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20148G976 | List: |
| References | |
| P-88106, NUDOCS 8803290282 | |
| Download: ML20148G972 (2) | |
Text
"
l O eubiic service-
= = =. -
16805 WCR 19 1/2, Platteville, Colorado 80651 March 21, 1988 Fort St. Vrain Unit No. 1 P-88106 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Attention: Mr. Jose A. Calvo Director, Project Directorate IV Docket No. 50-267
SUBJECT:
Control Rod Drive Partial Scram Test Results and Maximum Daily Temperature Report
Dear Mr. Calvo:
The Fort St.
Vrain Interim Technical Specifications (Surveillance Requirements, Section 4.1.1.A.1.a) require that a report be provided to the NRC at least once every 31 days when one or more Control Rod Drive (CRD) motor temperature (s) exceeds 215 degrees Fahrenheit.
A report on the partial scram test results and the maximum daily temperature of those CRD's with motor temperatures above 215 degrees Fahrenheit for the month of February, 1988, is included as Attachment I for your review. The report for the month of March and succeeding months, as applicable, will be included in the Fort St.
Vrain Monthly Operations Report.
We hope you will find this submittal responsive to your concerns.
If you have any questions or comments, please contact Mr. M. H. Holmes at(303)480-6960.
Sincerely,
[lf.0 l&A/Ehr1 R. O. Williams, Jr.
Vice President, Nuclear Operations
}
Attachmants jj3290gCK k \\
e2ashh$67 AD p
050 DCD
=,
l P-88106 March 21, 1988 cc: Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain 4
l
)
l