ML20149M084

From kanterella
Revision as of 08:42, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Response to Charge by NRC Inspector That Two Dresden Nuclear Plant Operators Were Sleeping on Job
ML20149M084
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/13/1996
From: Blanch P
AFFILIATION NOT ASSIGNED
To:
NRC
Shared Package
ML20149M049 List: ... further results
References
NUDOCS 9612120205
Download: ML20149M084 (1)


Text

. -.

- = -.. - - -.

From:

PAUL M. BLANCH <PMBLANCH0ix.netcom.com>

To:

WND2.WNP3(jaz,awd),WNDl.WNP2(hjm),TWD1.TWP4(gam)

Date:

11/13/96 8:06am subjec:.

Quote of the Day. Who me? Sleeping?

>From Commonwealth Edison's former Press Spokesman comes the following gem:

"It depends on your definition of asleep. They were not stretched out.

~

They had their eyes closed. They were seated at their desks with their heads in a nodding position."

-- John Hogan, Commonwealth Edison Supervisor of News Information, responding to a charge by a Nuclear Regulatory Commission inspector that two J

Dresden Nuclear Plant operators were sleeping on the job.

j Since when does sleep require one to be stretched out? When I was in i

school I could sleep with my eyes open and even learned how to do this standing up?

i Paul M. Blanch i

Energy Consultant 135 Hyde Rd.

West Hartford CT 06117

]

Voice 860-236-0326 Fax 860-232-9350 1

i i

i a

9612120205 961210 PDR ORQ NRRA PDR