ML20153D323
| ML20153D323 | |
| Person / Time | |
|---|---|
| Issue date: | 09/15/1998 |
| From: | Racquel Powell NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Collins S NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20153D328 | List: |
| References | |
| RTR-REGGD-01.105, RTR-REGGD-1.105 NUDOCS 9809250026 | |
| Download: ML20153D323 (4) | |
Text
.
p it:9 fW O
n UNITED STATES f
j NUCLEAR REGULATORY COMMISSION 6 POIOl'j WASHINGTON, D.C. m =1
%,*****/
BEP1s1998 MEMORANDUM TO:
Samuel J. Collins, Director Office of Nuclear Reactor Regulation FROM:
Russell A. Pew-ll FOIA/PA Officer
SUBJECT:
RELEASE OF RECORDS RELATING TO A DIFFERING PROFESSIONAL VIEW FROM FREDERICK BURROWS By memorandum dated August 21,1998, TaJuan Carter of your office, requested that my office coordinate the review for release of records, in accordance with NRC Management Directive 10.159, relating to a Differing Professional View for placeme, 'n the Public Document Room (PDR). The review of the subject records has now been cornpsted.
The records behind Tab A, identified on the enclosed Appendix, should be placed in the PDR and NUDOCS by your office. Record 1 and the attachment to record 10 is copyrighted.
Therefore, place the copyrighted records in the PDR for inspection only. Do not send the copyrighted records through NUDOCS for processing.
Enclosures:
- 1. Appendix
- 2. Records r
D Fv3
[by4 9809250026 980915 PDR TOPRP ENVWEST C
PDR vf)/dgGC,
s
- APPENDlX DPV FROM FREDERICK BURROWS NO.
DATE DESCRIPTION /(PAGE COUNT) 1, 9/94 ISA-S67.04, Part I, Setpoints for Nuclear Safety-Related Instrumentation (23 pages)(COPYRIGHTED, WILL BE RELEASED TO THE PDR FOR INSPECTION ONLY) 2.
3/6/96 Memorandum to J Wermiel from F Burrows,
Subject:
Westinghouse Standard Technical Specifications - Requirements for Electrical / instrumentation and Control Systems (9 pages) 3.
4/2/96 Memorandum for F Burrows from C Grimes and J Wermiel
Subject:
Technical Specification Requirements for Instrumentation and Control Systems (4 pages) 4.
8/9/96 Memorandum to J Wermiel and C Grimes from F Burrows,
Subject:
Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for Safety Systems (2 pages) 5.
8/29/96 Memorandum to F Burrows from J Wermiel and C Grimes,
Subject:
Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for i
Safety Systems"(12 pages) l 6.
3/17/97 Memorandum to D Thatcher from F Burrows,
Subject:
Differing i
Professional View concerning Technical Specification Setpoints and Allowable Values for Instrumentation (4 pages) 7.
3/24/97 Memorandum to R Zimmerman from S Collins,
Subject:
Differing Professional View (DPV) Panel with enclosures (6 pages) 8.
5/23/97 Memorandum to L Callan from R Zimmerman,
Subject:
Notification of Delay in Completion Review of Differing Professional View (1 page) 9.
9/16/97 Memorandum to L Callan from R Zimmerman,
Subject:
Notification of l
Delay in Completing Review of Differing Professional View (1 page) i 10.
10/31/97 Memorandum to S Collins from R Zimmerman,
Subject:
Differing
)
Professional View Conceming Technical Specification Trip Setpoints and i
Allowable Values for Instrumentation (39 pages) attaching COPYRIGHTED ATTACHMENT. WILL BE RELEASED TO THE PDR i
FOR INSPECTION ONLY (10 PAGES)
d a
11.
10/31/97 Memorandum to F Burrows from S Collins,
Subject:
Differing Professional View Conceming Technical Specification Trip Setpoints and Allowable Values for instrumentation (1 page) 12.
10/31/97 Memorandum to Bsheron and R Zimmerman from S Collins,
Subject:
l Follow-Up Actions to NRR Ad-Hoc Review Panel on the Differing l
Professional View on Technical Specification Trip Setpoints and Allowable l
Values for Instrumentation (2 pages) 13.
6/22/98 Memorandum to Scollins from B Sheron, and B Boger,
Subject:
Follow-Up Actions to NRR Ad Hoc Review Panel on Differing Professional View on Technical Specification Trip Setpoints and Allowable Values for Instrumentation (7 pages) l 14, 7/24/98 Memorandum to F Burrows from S Collins,
Subject:
Differing Professional 1
View and Differing Professional Opinion Regarding Technical l
Specification Setpoints and Allowable Values for Instrumentation (9 L
pages) 15.
7/24/98 Memorandum to L Callan from S Collins,
Subject:
Differing professional View and Differing Professional Opinion Regarding Technical Specification Setpoints and Allowable Values for Instrumentation (9 pages) l l
l
~
l _,
y a DO C.5 Copyrighted Documents Addressed Under DPV 4
For hard copy, refer to the PDR d
DPV
Subject:
Tez.A a,caz
_gge n=,in ci o u
,c
,,s, Jr.,
aus p a o w n e c e.
awe.1 foe ohrreumenrs risa) d n
- p ')]
,s.
o 4
t N
F F
w me o
i: 0 a
gggye n
'L,1-
, c w.= w Cy g \\ k ':^..
4
) 4 1
)
f
.