ML20195H448

From kanterella
Revision as of 18:20, 10 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proposed SALP Evaluation for Facility Based on Insps Conducted During Assessment Period
ML20195H448
Person / Time
Site: Crane, 05000000
Issue date: 11/14/1986
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806280294
Download: ML20195H448 (1)


Text

r JC L f' fr 6 -5 7 UNITED 8TATES 8

NUCLEAR REGULATORY COMMISSION e

(

,/'j REGION I 5

M1 PARK AVENut KING OF PRUS$1A, PENNSYLVANIA IMOG November 14, 1986 MEMORANDUM FOR:

Harry B. Kister, Chief i

Projects Branch No. 1, DRP FROM:

Lee H. Bettenhausen, Chief Operations Branch, DRS

SUBJECT:

THREE MILE ISLAND, UNIT 1. DRS SALP INPUT FOR SALP PERIOD MAY 1, 1986 TO OCTOBER 31, 1986 Attached is a proposed SALP evaluation for THI-1 based on inspections by DRS t

personnel conducted during the subject period.

In addition to the attached inspections, Suresh Chaudhary, Operation Programs Section, participated in an inspection performed by the Performance Appraisal Branch (PAB). As a separate SALP evaluation is being prepared by the PAB, Mr. Chaudhary's inspection activities are not included in the attached SALP, If you have any further questions in this regard please contact Norman Blumberg or Jon Johnson.

Lee H. Bettenhausen Chief, Operations Branch Division of Reactor Safety

Attachment:

As stated cc w/ attachment:

S. Ebneter, DRS L. Bettenhausen, DR!

J. Johnson, DRS N. Blumberg, DRS A. Blough, DRP R. Conte, TMI-1 SALP Notebook IDICTC3N:n in t,'J3 tc:::3w-w.w I30CW iiMt% 2 Sefre:[-$ h..m a M0l, eAfm$

h F0lA - _

)J

]

8YO6280294 88061D

$8"cvSseaa G.L/